Name of Work:- Restoration/Improvement of Khushwani Khul Karimabad. Adv. Cost= 20.00 lacs
Sl. No.
Item Description
1
Earth work in bulk excavation by mechanical means (hydraulic excavator) over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 m2 on plan) including disposal of excavated earth lead upto 50 meters and lift upto 1.5 m, as directed by Engineer-in-Charge.All kinds of soil :
2
Hand-packing stones in wire-crates; excluding cost of crates and stones
3
Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundations etc. in layers not exceeding 20 cm in depth, consolidating each deposited layer by ramming and watering, lead upto 50 m and lift upto 1.5 m.
4
Dry stone pitching (any thickness) excluding cost of stones.On Slopes
5
On Top copings of banks
6
Grouting of stone pitching using M-10 nominal mix concrete (max. size of aggregates; 20mm nominal) @ 3.65 cum per 100 sq m onhorizontal/side slopes; complete including curing.
7
Supply of stone boulders nallah of required size as directed by Engineer incharge
8
Cost of crates (4mm dia wire mesh 4*4 size) including carraige etc
9
Cost of B.A Wire
10
Providing and laying special Polythene
11
Carraige of materials by mechnical meansNallah stone avg 2km.
12
Sand avg lead 20km from Kakapora.
13
Aggregate avg lead 10km (40mm).
14
Cement from avg lead 6kms.
15
Providing Geo Taged photographs ( Pre, Post, & During the execution of work) Please Enable Macros to View BoQ information
We takes all possible care for accurate & authentic tender information, however Users
are requested to refer Original source of Tender Notice / Tender Document published by
Tender Issuing Agency before taking any call regarding this tender.