| 1 | Earth work Excavation in foundation in ordinary soil within 50m. initial lead & 1.5m. initial lift including rough dressing & breaking clods to maximum 5cm. to 7cm. & laying in layers not exceeding 0.3m. in depth & as per direction of the engineer–in–charge. |
| 2 | Filling in foundation and plinth with sand watered and rammed including cost of sand & labour |
| 3 | Cement concrete (1:4:8) with 4cm. Size crusher broken hard Granite metal including cost of all labour, materials with all taxes, lead,T & P etc all complete |
| 4 | RCC work M20 with 20 mm and down graded size black hard grinite ( crusher broken ) stone chips including hoisting,lowering & laying concrete & compacting by using vibrator watering & curing for 4 weeks including cost & conveyance, royalties & taxes of all materials & labour required for the work etc complete with all T & P in all respect but excluding cost & conveyance of M.S rods & binding wires & tying the grills & placing in proper position.(including centering & shuttering etc complete) |
| 5 | Fly ash brickmasonary in F&Pusing cement mortar(1:6) |
| 6 | Fly ash brickmasonary inSUPERSTRUCTUREusing cement mortar(1:6) |
| 7 | RCC work M20 with20 mm and downgraded size blackhard grinite ( crusherbroken ) stone chipsincludinghoisting,lowering &laying concrete &compacting by usingvibrator watering &curing for 4 weeksincluding cost &conveyance,royalties & taxes ofall materials & labourrequired for the worketc complete with allT & P in all respectbut excluding cost &conveyance of M.Srods & binding wires& tying the grills &placing in properposition.(includingcentering &shuttering etccomplete) |
| 8 | RCC work M20 with20 mm and downgraded size blackhard grinite ( crusherbroken ) stone chipsincludinghoisting,lowering &laying concrete &compacting by usingvibrator watering &curing for 4 weeksincluding cost &conveyance,royalties & taxes ofall materials & labourrequired for the worketc complete with allT & P in all respectbut excluding cost &conveyance of M.Srods & binding wires& tying the grills &placing in proper8position.(includingcentering &shuttering etccomplete) |
| 9 | column & beam |
| 10 | roof slab |
| 11 | Supplying, fittingand placinguncoated HYSD barreinforcementcomplete as perdrawing andtechnicalspecification. |
| 12 | Supplying , fitting &fixing of G.P sheetDoor & window in thewall |
| 13 | 6mm thick CP(1:4)over the ceiling |
| 14 | first floor |
| 15 | Fly ash brickmasonary inSUPERSTRUCTUREusing cement mortar(1:6) |
| 16 | lintel |
| 17 | column beam |
| 18 | roof slab |
| 19 | Supplying, fitting andplacing uncoatedHYSD barreinforcementcomplete as perdrawing andtechnicalspecification 1stfloor. |
| 20 | 16mm thick CP(1:6) |
| 21 | 1st floor |
| 22 | 12 mm thick CP(1:6)over the wall |
| 23 | 1st floor |
| 24 | Fixing vetrified tilesin flooring using C.M(1:1) Etc complete |
| 25 | Fixing vetrified tilesin dados , skirtingwall using C.M (1:3) |
| 26 | Fixing vetrified tilesin dados , skirtingwall using C.M (1:3)Etc complete |
| 27 | 1st floor |
| 28 | Painting two coatswith weather silk coatover a cpoat of waterbound wall primer |
| 29 | 1st floor |
| 30 | Painting two coatswith weather silk coatover a cpoat of waterbound wall primer |
| 31 | 1st floor |
| 32 | painting two coatsover a coat of primerover new iron work |
| 33 | Supplying, fitting &fixing of Of PVCdoor |
| 34 | Conveyance ofexcavated earth fromwork site bymechanical meansup to 5km etc |
| 35 | Supplying allmaterials, labour andT&P and fixing towalls,ceiling and floorCPVC pipes of thefollowing nominaldiameter with fittingsand clamps includingtesting as perspecification allcomplete.A. 32MM DIA PVC |
| 36 | 25mm dia PVC Pipe |
| 37 | 20mm dia PVC Pipe |
| 38 | Suppling allmaterials, labour, t&pfor Fixing WaterCloset (Europeanpattern W.C pan)with integral ‘S’ or ‘P’trap conforming to IS2556 : Part 8-2004,to the floor withwooden plug andchromium platedscrews includingjointing the trap withsoil pipe in cementmortar (1:1) etc allcomplete as perspecification. (Seatand cover to bemeasured and paidfor separately) |
| 39 | 5 Supplying of allmaterials,labour,T&Pfor fixing wash handbasin with hole forpillar cock with castiron/M.S. bracketspainted whiteincluding cuttingholes in walls andmaking good to thedamages etc allcomplete as perspecification anddirection of Engineerin-charge. |
| 40 | Supplying of allmaterials,labour,T&Pfor fixing 10 Ltrscapacity PVC LowLevel cistern with apair of PVC bracketscomplete with fittingsuch as siphonicarrangement ,15 mmnominal sizebrass/PVC ball valvewith ploythene floatchromium platedbrass handle,unionsand couplings forconnection withinlet,outlet andoverflow pipes,32mm dia PVC longflush bend ,12 mmdia PVC inlet |
| 41 | Supplying of allmaterials,labour,T&Pfor fixing standingUrinal medium withhole for pillar cockwith cast iron/M.S.brackets paintedwhite includingcutting holes in wallsand making good tothe damages etc allcomplete as perspecification anddirection of Engineerin-charge. |
| 42 | Supplying allmaterials, labour andT&P for fitting fixingof following types ofP.H. Fittings etc. allcomplete. A. 15mmdia C.P. Long body |
| 43 | 15 mm dia CP short body tap |
| 44 | 15 mm dia CP angle cock |
| 45 | 15mm dia C.P pillarCock (Basin Mixture) |
| 46 | Soap holder |
| 47 | 20x600mm C.P.Towel rail |
| 48 | C.P. Glass Self |
| 49 | 2in one TelofonicShower |
| 50 | 110mm dia UPVCPipe |
| 51 | 110mm dia U. P.V.CY door |
| 52 | 110m mm dia UPVPlain Bend |
| 53 | 110mm dia PVCOffset |
| 54 | 110mm dia U. P.V.CClamp |
| 55 | 110mm dia U. P.V.CCowel |
| 56 | 110mm dia U. P.V.CSocket |
| 57 | 25mm PVC Ball valve |
| 58 | 40 mm UPVC pipe (considering 10mtrdistance of main pipeline) |
| 59 | Supplying of allmaterials, Labour,T&P for constructionof staging for O.H.Service tank on theexisting roof slab(stagging for 1000liter capacity O.H.Service tank)Rs8.8/Ltr X 1000 |
| 60 | Supplying andtransporting precastRCC well ring tank ofsize1200mmx1200mminside dia made with0.60 mtr stagingincluding flyashbrickwork in C.M(1:4) reinforcedcement concrete(1:1.5:3) with 12mmsize crusher brokenhard grainite chipswith cutting bendingand binding of M.Srtod and centeringand shuttering forR.C.C work 12mmthick cement plaster(1:4) plastering withfinishing walls bywater proofingcement paint over acoat of cement washapproved shade withfitting and fixing oftank nipple & jam nutfor provision ofsuction deliverywashout & over flowarrangementincluding all costconveyance taxesand other necessaryrequirement for thework complete in allrespect etc allcomplete as perdirection of Engineer Please Enable Macros to View BoQ information |