|
| 1 | Repair and Service of following capacity pump sets after dismantling and providing all necessary defective/wornout parts such as nut bolt rubber gasket, gland dori, rubber coupling, suitable bearing etc. and reasembling the pump, making the pump set in perfect working condition as per good engineering practice complete in all respect as required at site. .NSR |
| 2 | 15 HP Jockey Pump Set . |
| 3 | Terrace Pump . |
| 4 | Repair and service and greesing oiling of various pump for fire fighting and STP complete in all respect. .NSR |
| 5 | 75 HP Main/Sprinkler Pump . |
| 6 | Repair and service of 85HP diesel engine pump and replacement of fuel filter/oil filter/Air filter and lubricate oil complete. .NSR |
| 7 | Painting of Fire Hydrant/Sprinklar pipeline of different sizes installed inside/outside of terminal building /Cargo Terminal iwht two or more coatsof painting with synthetic enamel paint to give an any shade, including cleaning of surface with detergent etc. .NSR |
| 8 | 100mm dia . |
| 9 | 150mm dia . |
| 10 | Providing and fixing of coupling TYRE Model TC 019, for main pump for fire plant .NSR |
| 11 | Repair and rewinding of STP/domestic/dewatering submersible pumping sets of various capacity as detail including replacement of all defective parts as required by the EIC .NSR |
| 12 | 15 HP-3Phase . |
| 13 | 5 HP- 3 Phase (Domestic Pump) . |
| 14 | 3 HP- 1 Phase (Dewatering Pump) . |
| 15 | 2 HP-1 Phase (Sewage Submersible) . |
| 16 | Proding and fixing of Ampere Meter(0-100)volt of 4\\" i/d of Make L&T, BCH, AE .NSR |
| 17 | Providing and fixing Volt Meter (0-500) Volt of 4\\" i/d of Make L&T, BCH & AE .NSR |
| 18 | Providing & Fixing of indicators (red,green, orange) of approved Make L&T. BCH, .NSR |
| 19 | Providing and fixing of single phase preventor Make (MINILIC, L&T, Schenider, BCH) .NSR |
| 20 | Providing and fixing of push button completein all respect Make L&T,BCH, .NSR |
| 21 | Providing and fixing of AX contactor blockincuding wiring and making connection complete in all respect as per site requirement to entire satisfication of EIC. Make BCH, L&T, Schenider .NSR |
| 22 | MNX-95 Amp . |
| 23 | MNX-70Amp . |
| 24 | MNX-18/25Amp . |
| 25 | MNX-32/40Amp . |
| 26 | Providing and fixing of 3 Pole MCCB of following capacity of make L & T, Havelles .NSR |
| 27 | 125 Amp . |
| 28 | Supplying of Bacteria Powder (Bio Culture feed) using to produce bacterial in STP plant 2kg per month complete. .NSR |
| 29 | Providing and fixing of over load relay complete in all respect Make L&T, BCH. .NSR |
| 30 | 9-14 Amp . |
| 31 | Providing and fixing of connection plates complete in all respect for terminating wires in electrical panel complete in all respect. .NSR |
| 32 | Wiring of Control Panel with 1.5mm copper wire including cost of Nuts, Bolts and Thimbles complete in all respect. .NSR |
| 33 | Lifting and lowering of motor from booster complete in all respect .NSR |
| 34 | Replacement of defective 3 core submersible cable of size 2.5 mm2 with entire satisfaction of EIC. ISI make finolex/havells .NSR |
| 35 | Supplying, Installation, testing & commissioning of sprinkler flexible pipe (UL Listed) of stainless steel complete with 15 NPT on reducer thread with maximum working pressure of 175 PSI test pressure of 875 PSI (Burst) with branch line (Inlet) 25mm NPT male thread to sprinkler head (Outlet) 15mm NPT female thread with reducer, nipple. 2 side brackets, center bracket, stockbar of following sizes complete as required. .NSR |
| 36 | 1000 to 2000 mm . |
| 37 | Replcement of PCB circuit for air conditioning unit to the entire satisfaction of EIC. The new PCB circuit should be guaranteed for a period of 6 months .NSR |
| 38 | Refrigerant Gas charging with compatible refrigerant, complete in all respect including detection of leakage in the coper pipe line and repair of same complete as per direction of EIC .NSR |
| 39 | 1.50/2.00 TR Window AC . |
| 40 | Providing and fixing of various Running capacitors mfd make Tasia and siemens .NSR |
| 41 | 36/45 mfd . |
| 42 | 60/80/100 mfd . |
| 43 | Replacement of compressor including Gas charging, welding ,testing and refitting at site complete in all respect (change of filter, capillary and flushing etc.) Make: Emerson or equivalent .NSR |
| 44 | 1.5 TR Cap. Compressor . |
| 45 | Providing and fixing UPVC drain pipe of Class 3, Pressure 6kg/cm2 of approved make conforming to IS:4985 of size 3/4\\" complete in all respect to the satisfaction of EIC .NSR |
| 46 | Dismantling of AC fan motor 1/6 HP including rewinding, rebushing, refitting at site single phase 220 volts for the Split AC out door unit complete in all respect. .NSR |
| 47 | Providing and fixing of condenser fan blade for window/split type AC's complete in all respect. .NSR |
| 48 | Providing and fixing of AC fan motor 1/6 HP single phase 220 volts including dismantling of old motor and fitting of niew motor for infoor unit of split AC and water cooler condensor fan motor i/c rebate for old material complete in all respect. .NSR |
| 49 | Providing, fixing, testing & commissioning of 15mm dia quartzoid type sprinklers of rating 68 degree centigrade with required accessories . E & M DSR 2025 18.21 |
| 50 | Pendent Sprinkler .18.21.1 Please Enable Macros to View BoQ information |