| 1 | Earth work in excavation with rough dressing with lead upto 30Mtr , 1.50 Mtr inlcuding cost of all material , labour manual compaction, proper dressing ,and T&P etc complete as per direction of Engineer in charge. |
| 2 | Earth work in filling for making proper slope with dresing to profile including cost of all lead & lift, labour, T&P etc. complete with proper disposal of earth requried for proper complition of work as per direction of engineer-in-charge. |
| 3 | Providing and laying Geo Textile sheet 200 Gsm woven multifilament polypropylene yarn, below pitching with pegs including preparation of surface including cost of all lead & lift, labour, T&P etc. complete with proper disposal of earth requried for proper complition of work as per direction of engineer-in-charge. |
| 4 | Laying new empty HDPE Bags making slope pitching of bund filled with silt/sandy soil, machine sewing, tiying and placing in proper position including cost of all material, earth, labour, T&P etc complete as per direction of engineer-in-charge. |
| 5 | Laying Nylon Crate with New empty HDPE Bags filled with silt/sandy soil, machine sewing, tiying and placing in proper position in nylon crate of size 1.0mX1.0mX1.0m with mesh size 20cmX20cm weight not less than 165gm per no. including cost of all material, earth, labour, T&P etc complete as per direction of engineer-in-charge. |
| 6 | Supplying and pilling one third length of bamboo struts of size 50 to 80 mm dia 5.00 m long including cost of all material, earth, labour, T&P etc complete as per direction of engineer-in-charge. |
| 7 | Supplying and bracing of bamboo struts of size 50 to 80 mm dia 5.00 m long including cost of all material, earth, labour, T&P etc complete as per direction of engineer-in-charge. |
| 8 | Supplying, Filling and screen of jhakar including cutting of jhakar and carriage etc. with 40% deduction of voids including cost of all material, labour, T&P etc complete as per direction of engineer-in-charge. |
| 9 | Earth/silt clearance by chain driven excavator with rough dressing and its proper disposal including all labour, material T&P etc required for proper completion of work as per direction of engineer in-charge. |
| 10 | Supply and fixing rubber seal per no. of 1.20 m dia flapper regulator gate including cost of all material, labour, T&P etc.complete as per direction of engineer-in-charge. |
| 11 | Painting two coats with black enamel paint over one coat of red oxide primer of flapper gate including cost of all material, labour, T&P etc.complete as per direction of engineer-in-charge. |
| 12 | Finishing of walls with water proofing cement paint of approved make such as super Snowcem, Durrocem, Robiacem Guttucem, supreme quality of required shade on uncoated wall surface (TWO coat) over one coat white cement primer to give evenshades after thoroughly brushing the surface to remove all dirt and remains of loose powdered materials including curing and cost of all materials,labour, T&P etc approved as per direction of Engineer-in-Charge. Please Enable Macros to View BoQ information |