| 1 | Providing one Coil Earth using No8 GI earth wire (50 mm dia,115 turns) including digging separate pit (0.45x0.45x1.5m) at standard distance away from the pole/structure in ordinary soil & backfilling |
| 2 | Providing one Earth using GI earth pipe of size 38.1mm dia2.5m length including digging separate pit (0.45 x 0.45 x 2.5 m) at a minimum distance of 1.5 m away from the pole/structure and maintaining standard distance between different earth pipes in ordinary soil and backfilling |
| 3 | Fitting one Additional 2.4m/3m Channel cross arm (75x40x6mm), in existing 11KV DP incl. conveyance of materials. |
| 4 | Transporting poles by hired vehicle to a distance up to 5km and carrying up to 4 poles excluding loading & unloading |
| 5 | Insertion of one HT PSC pole in existing OH line including digging & backfilling pit in ordinary soil, fitting cross arm, insulators, binding etc., drawing sufficient length of GI earth leads to the ground for earthing (excluding provision of earthing). |
| 6 | Dismantling (without damage) one km 11kV line (three conductors) including dismantling cross arm, insulators, disc, disconnecting jumper connection, rolling the conductor and stacking the materials. |
| 7 | Renewing one V Cross arm on the 11kV Pole including dismantling and conveyance |
| 8 | Fitting and erecting one HT PSC type pole in position incl. fitting cross arm, digging & back filling pit in ordinary soil(as per standards) , drawing sufficient length of GI earthing leads from F clamp through V cross arm to ground for earthing (excluding provision of earthing),drawing earth leads |
| 9 | Straightening one slanted 11kV Cut pole after lowering down the existing line and stringing the line after work. |
| 10 | Straightening one slanted 11kV pole afterunbinding the line and binding the line after work. |
| 11 | Labour charges for loading HT PSC pole from the stacking place and unloading the same at work site (transport by vehicle). |
| 12 | Fitting and providing one HT stay for 11KV pole incl. digging and back filling pit in ordinary soil |
| 13 | Conveyance of one km 11kV line materials from section store/stacking place to the work site (excluding poles). |
| 14 | Drilling hole of various sizes on existing Channel/Cross arm |
| 15 | Fitting one set (3No.) 11kV LA and givingconnections excluding earthing |
| 16 | Renewing one damaged cross arm with100x50mm, 2.4m/3m Channel cross arm on the 11kV DP including dismantling andconveyance. |
| 17 | Renewal of existing damaged/broken old11kV Stay to the existing stay rod. |
| 18 | Renewal of existing damaged/old 11kV Stay with new stay in place including excavation & backfilling of pit, dismantling, refitting of all items and conveyance of all materials |
| 19 | Additional rate for providing one disc set,PG clamp etc complete on any type of HT pole for making cut point |
| 20 | Additional rate for refitting/redoing one Disc set while renewing any type of 11kV cut pole. |
| 21 | Renewing one 1.8m Channel cross arm on the 11kV Pole including dismantling and conveyance |
| 22 | Fitting one Additional 75x40mm, 1.8mChannel cross arm in existing single poleincluding conveyance of materials |
| 23 | Stringing of one km 3 PH 11 kV line with XLPE insulated ACSR Racoon or equivalent ( 3 conductors) after fitting insulators,binding conductors to pin insulators using suitable tie and anchoring with wedge type anchoring clamps including cutting and removing tree branches wherever necessary excluding cut point works |
| 24 | Providing bridging at Cut points for 3 PH11kV line with XLPE Insulated ACSR Raccoon or equalant (1 conductors) using IPC and respective conductors |
| 25 | Pole numbering using printed Aluminiumsheets of 22 SWG having size 20 x 12 cm or Painting the surface of line supports where numbers are to be inscribed, Pole numbers shall be painted in circular / rectangular background, using approved quality anti algal yellow paint in two coat after scraping and cleaning the surface at a height of 2.5 metre above ground level. The number and lettersshould be in black synthetic enamel paint.The size of the number should be at least2cm in height x 1.5cm in width. including cost of paint |
| 26 | Additional rate for excavation of one Pit for HT pole/ HT stay in hard laterite |
| 27 | Additional rate for excavation of one Pit for HT pole/ HT stay in laterite Please Enable Macros to View BoQ information |