| 1 | Excavation in foundation in ordinary soil or silt (loam, clay or sand) including lift upto 1.50m and lead up to 30m and including filling watering and ramming of excavated earth in to the trenches or in to the space between the building and the side of foundation trenches or in to the plinth and removal and disposal of surplus earth as directed by the Engineer in charge up to a distance of 30m from the foundation trenches. (PWD SOR 2025-26, Chepter-4, Item No.01 Spec- 251 ) |
| 2 | Grandular Sub-base with well Graded Material (Table 400.1) (A) By Mix in Place MethodConstruction of granular sub-base by providing well graded material, spreading in uniform layers wth motor grader on prepared surface, mixing by mix in place method with rotavator at OMC, and compacting with smooth wheelo roller to achieve the desired density. complete as per technical spercification clause-401 (As per Analysis). |
| 3 | Providing and laying cement concrete in 1:4:8 (1 cement: 4coarse sand :8 graded stone aggregate 40mm norminal size ) including supply of all materials, labour and T&P etc. (PWD SOR 2025-26 Chapter No-06 SI No. 3 Spec. No. 4.1) |
| 4 | Class-150 Brick work in 1:4 cement and coarse sand mortar in foundation and plinth including supply of all materials, labour and tools and plants, etc. Required for proper completion of the work. SOR 2025-26 (DSR/PWD 6.1) |
| 5 | Supply of local sand ............................................ All complete. Sor 2025-26 ch-01 Sl.no. 13 |
| 6 | RCC work Providing and laying in position specified grade of reinforced cement concrete in Raft foundation, including the cost of centering, shuttering, finishing and excluding reinforcement - All work up to plinth level in :1:1.5:3 (1 cement : 1.5 coarse sand : 3 graded stone aggregate 20 mm nominal size) (PWD SOR 2025-26, Chepter-5, Item No.9 Spec. no. 5.1). |
| 7 | R.C.C work in Wall (any thickness) including attached plasters, buttresses, plinth and string courses, fillers, columns, pillars, abutments, post and struts etc. including the cost of centering, shuttering, finishing and excluding reinforcement All work up to plinth level in 1:1.5:3 (1 cement : 1.5 coarse sand : 3 graded stone aggregate 20 mm nominal size) upto plinth level (PWD SOR 2025-26, Chapter-5, Item No.9 Spec. no. 5.2) |
| 8 | Reinforced cement concrete work in walls (any thickness), including attached pilasters, buttresses, plinth and string courses, fillets, columns, pillars, piers,abutments, posts and struts etc. including cost of centering, shuttering, finishing and excluding reinforcement :1:1.5:3 (1 cement :1.5 coarse sand : 3 graded stone aggregate 20 mm nominal size).(PWD SOR 2025-26, Chapter-5, Item No.11 Spec. no. 5.2) |
| 9 | Reinforced cement concrete work in beams, lintels, roofs having balconies, shelves, chajjas, bands, staircases and spiral stair cases above plinth level up to floor five level, including cost of centering, shuttering, finishing and reinforcement :1:1.5:3 (1 cement :1.5 coarse sand : 3 graded stone aggregate 20 mm nominal size). (PWD SOR 2025-26, Chapter-5, Item No.12) |
| 10 | RCC work Providing and laying in position specified grade of reinforced cement concrete in Raft foundation, including the cost of centering, shuttering, finishing and excluding reinforcement - All work up to plinth level in :1:1.5:3 (1 cement : 1.5 coarse |
| 11 | M.S or Iron work in plain work such as reinforced concrete or reinforced brick work (When not included in and an over all rates) brought to required shape as necessary of the work and including the suply of steel and its wastage bend, hooks and authorized over lapping shall be measured upto floor to level. (As per Analysis of Rate) |
| 12 | M-150 Brick work in 1:4 Cement and Coarse sand mortar in foundation and plinth including supply of all materials, labour and tools and plants, etc. required for proper completion of the work add extra to item No.1 to 4 above for super structure above plinth level upto floor five level including necessary cutting and moulding of brick work as required and also including honey combed brick work in thickness of wall more than 12cm( PWD SOR 2025-26, chapter-5, SI No. 2+5) |
| 13 | M-150 Brick work in 1:4 Cement and Coarse sand mortar in foundation and plinth including supply of all materials, labour and tools and plants, etc. required for proper completion of the work add extra to item No.1 to 4 above for super structure above plinth level upto floor five level including necessary cutting and moulding of brick work as required and also including honey combed brick work in thickness of wall more than 12cm( PWD SOR 2025-26, chapter-5, SI No. 2+5) |
| 14 | 12 mm thick plaster with cement mortar in proportion of 1:4 cement & fine sand ( Dholpur sand Not less than in 1.25 FM) of single coat for interior plastering upto floor two level...... All complete.(PWD/SOR 2025-26 Chapter No-07 SI No. 2) |
| 15 | providing and laying 6 mm thick ceiling plaster with 1:4 cement and coarse sand mortar. SOR 2025-26 Sl.No. 13-16 |
| 16 | finishing walls with putty approved brand ............................ All complete. (SOR 2025-26 S.No. 31) |
| 17 | finishing walls with Exterior emulsion paint ............................ All complete. (SOR 2025-26 S.No. 31) |
| 18 | providing and laying vitrified floor tiles in different sizes ................................................. All complete. |
| 19 | Providing and fixing 18 mm thick Granite (gang saw cut)mirror polished premoulded and prepolished, machine cut for................................. All complete. |
| 20 | M-15 Brick work in 1:4 Cement and Coarse sand mortar in foundation and plinth including supply of all materials, labour and tools and plants, etc. required for proper completion of the work. (SOR/ PWD 2025-26 Chapter No. 6 SI No. 2) |
| 21 | Providing and laying 80 mm thick I-shaped & zig-zig shaped colour interlocking tiles over 30 mm thick local sand base levelling and dressing of surface required level and Sloepe, filling joints with local ------------------------ all complete. |
| 22 | Applying priming coat over new steel and painting ist coat over priming coat on steel and other meterial ................................................... All complete. |
| 23 | Supply and fixing flush door.............................. All complete. DSR Sl.No. 26.87 |
| 24 | Providing and fixing stainless steel (Grade 304) railing made of hollow tubes channels, plates etc. Alll complete. |
| 25 | providing and laying soap stand including .................................. All complete. |
| 26 | providing and fixing CP brass long body bid cock of approved quality conforming to IS Standards and weighing not less. DSR 2023. S.No. 18.51 |
| 27 | providing and fixing CP brass angle valve approved quality conforming to IS Standards and weighing not less. DSR 2023. S.No. 18.51 |
| 28 | providing and fixing on wall face unplasticised Rigid PVC 110 mm dia meterrain water pipes ...................................... All complete. |
| 29 | Providing and fixing polythelene-alluminum-polyethelene (PE-ALPE) composite pressure pipes confirming to is15450 ............................................ All complete. |
| 30 | Providing and fixing polythelene-alluminum-polyethelene (PE-ALPE) composite pressure pipes confirming to is15450 ............................................ All complete. |
| 31 | Supply and hoisting of Sintex or equivalent high density polythylene seamless of piece moulded water tanks and placing the same in proper position |
| 32 | Wiring point for light with 1.5 sq.mm. PVC insulated single core aluminum conductor cable in heavy guage rigid steel conduit pipe partly concealed in the same as in above .............. All complete. |
| 33 | wiring point for fan/fresh air fan (light duty exhaust fan) with 1.5 sq.mm FRLSH PVC.......................... All complete. |
| 34 | wiring point for plug with 1.5 sq. Mm. fRLSH PVC insulated mult........................ All complete. |
| 35 | supply and fixing of power plug with ..........................all complete. |
| 36 | supply and fixing hexagonal/Round GP fan box................................ All complete. |
| 37 | supply and fixing concealing of 20 mm dia. 2m thick PVC conduit pipe with ISI ...................... All complete. |
| 38 | suppply and fixing danger board fabricated from 10 gauge MS sheet as per I.E Rules. |
| 39 | Supply and fixing MCB (electric S.NO. 1002) 06 t 32 amp......................... All complete. |
| 40 | Supply and fixing of Electroin fan regulator........................................ All complete. |
| 41 | Supply and fixing of LED tube light with batten suitable for up to 1X20 watt LED tube light fitting including tube on surface complete. |
| 42 | supply and fixing of 1200 mm ceilling fan with 2 nos canopy and 1 nos rbber hook including down rod as per requirement |
| 43 | supply and fixing testing 10 watt LED down concealing light with electronic driver. |
| 44 | M.S Speciefication Board including painting & writing |
| 45 | P/F of Inogration Granite stone including writing and Please Enable Macros to View BoQ information |