| 1 | Demolishing brick work manually/ by mechanical means includingstacking of serviceable material and disposal of unserviceable materialwithin 50 metres lead as per direction of Engineer-in-charge.In cement mortar |
| 2 | Demolishing R.C.C. work manually/ by mechanical means including stacking of steel bars and disposal of unserviceable material within50 metres lead as per direction of Engineer - in- charge. |
| 3 | Dismantling tile work in floors and roofs laid in cement mortar including stacking material within 50 metres lead.For thickness of tiles above 25 mm and up to 40 mm |
| 4 | Disposal of moorum/building rubbish/ malba/ similar unserviceable, dismantled or waste material by mechanical transportincluding loading, transporting, unloading to approved municipal dumping ground for lead upto 10 km for all lifts, completeas per directions of Engineer-in-charge. |
| 5 | Reinforced cement concrete work in beams, suspended floors, roofs having slope up to 15° landings, balconies, shelves, chajjas, lintels, bands, plain window sills, staircases and spiral stair cases above plinthlevel up to floor five level, excluding the cost of centering, shuttering, finishing and reinforcement with 1:1.5:3 (1 cement : 1.5 coarse sand(zone-III) derived from natural sources : 3 graded stone aggregate20 mm nominal size derived from natural sources). |
| 6 | Centering and shuttering including strutting, propping etc. and removal of form for Lintels, beams, plinth beams, girders, bressumers and cantilevers. |
| 7 | Reinforced cement concrete work in beams, suspended floors, roofs having slope up to 15° landings, balconies, shelves, chajjas, lintels, bands, plain window sills, staircases and spiral stair cases above plinthlevel up to floor five level, excluding the cost of centering, shuttering, finishing and reinforcement with 1:1.5:3 (1 cement : 1.5 coarse sand(zone-III) derived from natural sources : 3 graded stone aggregate20 mm nominal size derived from natural sources). |
| 8 | Centering and shuttering including strutting, propping etc. and removal of form for Suspended floors, roofs, landings, balconies and access platform |
| 9 | Steel reinforcement for R.C.C. work including straightening, cutting,bending, placing in position and binding all complete upto plinth level. Thermo-Mechanically Treated bars of grade Fe-500D or more. (TMT Bars) Fe-500 |
| 10 | Brick work with common burnt clay F.P.S. (non modular) bricks of classdesignation 7.5 in superstructure above plinth level up to floor V level inall shapes and sizes in : |
| 11 | GST Extra as per applicable Please Enable Macros to View BoQ information |