| 1 | Excavation of pole pit for pole upto 8.00m length by using JCB/Manual |
| 2 | Erection of RCC, REC, PSC poles upto 8.00m length by using Crane / Manual |
| 3 | Excavation of pole pit for pole above 8.00m length by using JCB/Manual |
| 4 | Erection of RCC, REC, PSC poles above 8.00m length by using Crane / Manual |
| 5 | Excavation of Stay pit of 4.5 ' to 5 ' depth using JCB / Manual |
| 6 | Erection of stay set complete with fixing up stay wire Eye, Bow, Guy Shackle, Binding etc.. |
| 7 | Fixing of Tapping X-Arm/Guarding X-Arm/V cross arm |
| 8 | Fixing of HT/LT TI Fittings |
| 9 | Fixing of LT 3 phase cross arm |
| 10 | Fixing of LT 1 phase cross arm |
| 11 | Fixing of 11 KV Strain Disc with Metal Parts |
| 12 | Fixing of 11 KV Pin Insulator/Polymer Pin Insulator |
| 13 | Paving and stringing of conductors of sizes upto 7/2.59 mm ACSR or other equivalent conductor |
| 14 | Paving and stringing of conductors of sizes above 7/2.59 mm ACSR or other equivalent conductor |
| 15 | Fixing of LT Shackle |
| 16 | Fixing of Alu Knob |
| 17 | Fixing of LT Pin Insulator |
| 18 | Erection of 11 KV Single Pole Structure including erection of DT complete with centre support including fixing of MCD box |
| 19 | Loading and Unloading of Distribution Transformer (i) Upto 100 KVA |
| 20 | Loading and Unloading of line materials |
| 21 | Transporting of Distribution Transformer/line materials from stores to office /site upto 10 KM distance by engaging 1 Ton Capacity Minidor (Lorry) |
| 22 | Transporting of Distribution Transformer/line materials from stores to office /site Above 10 KM distance by engaging 1 Ton Capacity Minidor (Lorry) (5 X 75 =Rs.375) |
| 23 | Transportation of all type of poles by bullock cart or other vehicle (for all sizes of poles including loading and unloading) (i) For a lead upto 5 KM |
| 24 | Transportation of all type of poles by bullock cart or other vehicle (for all sizes of poles including loading and unloading) (ii) Above 5 KM (9 X 75 = Rs.675) including square pole |
| 25 | Transporting of conductors of all sizes from road side to pit locations upto one KM of Conductor |
| 26 | Dismantling of RCC,REC,PSC & metal pole of all sizes including the closing of the pit |
| 27 | Concreting with 1:4:8 mix using 40 mm Jelly including curing(Material + labour) (i) Mass concreting of poles |
| 28 | Earthing of Pole |
| 29 | Erection of DP structure with stay as per TNEB standard including of top channel, cross bracing, concreting, painting, colour washing etc.., (i) With 11 KV AB Switch using all types of poles of size 9 m and above length |
| 30 | Dismantling of Double Pole Transformer structure materials complete set and transporting the same from the location to the road side |
| 31 | Dismantling of conductor upto 7/3.35 mm including stocking of coils to the nearest road side including stocking of coils |
| 32 | G.S.T. @18% should be Entered by the Bidder Please Enable Macros to View BoQ information |