| 1 | BEUTIFICATION OF POND |
| 2 | 5.9.1:Centering and shuttering including strutting, etc. and removal of form for:Foundations, footings, bases of columns, etc for mass concrete |
| 3 | 5.1.3:Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level:1:2:4 ( 1 cement : 2 coarse sand : 4 graded stone aggregate 20 mm nominal size derived from natural sources) |
| 4 | 5.22.6:Steel reinforcement for R.C.C work including straightening, cutting, bending, placing in position and binding all complete upto plinth levelThermo - Mechanically Treated bars of grade Fe-500D or more |
| 5 | 51.2.3:Filling with Quarry Muck <br> Filling up low lying and water logged areas with local material/ quarry muck, spreading in layers, leveling the top at site and consolidation by ramming, etc complete for improving the CBR value of subgrade |
| 6 | OD549528/2025-2026:Providing and laying 60 mm thick factory made cement concrete interlocking paver block of M30 grade made by block making machine with strong vibratory compaction of approved size, desigh & shape , laid in required colour and pattern over and including 50 mm thick compacted bed of 6mm aggregate , filling the joints with fine sand etc all complete as per the direction of Engineer-in- charge. modified data 16.68 |
| 7 | OD547645/2025-2026:PVC WEEP HOLES-Providing weep holes using 75mm dia.PVC pipes working pressure 4kg/sq.cm including cost of materials,coveyance,labour charges etc.complete |
| 8 | 10.16.3:Steel work in built up tubular (round, square or rectangular hollow tubes etc.) trusses etc., including cutting, hoisting, fixing position and applying a priming coat of approved steel primer, including welding and bolted with special shaped washers etc. complete.Electric resistance or induction butt welded tubes |
| 9 | 10.25.1:Item Shifted to Sub head 14 as item 14.73Item Shifted to head 14 as item 14.74Steel work welded in built up sections/framed work, including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer using structural steel etc. as required.In stringers, treads,landings etc. of stair cases, including use of chequered plate wherever required, all complete Please Enable Macros to View BoQ information |