| 1 | Stringing of 1.1 kV Aerial bunched cable of size 3 x 70+ 1 x 16+1x 50 sqmm with bare/insulated Messengerthrough existing poles |
| 2 | Labour charges for loading LT PSC pole from thestacking place and unloading the same at work site(transportation by any vehicle). |
| 3 | Renewal of existing damaged/old LT PSC/RCC (single phase line) pole with new PSC pole in place including excavation of pole pit, erection of new pole, backfilling pit and refitting ofall items except street light fitting etc. and conveyance ofall materials except pole. |
| 4 | Providing Strut using LT PSC pole including digging and back filling pit in ordinary soil. |
| 5 | Renewal of existing damaged/old LT stay with new stay in place including excavation of stay pit, erection of new stay, backfilling pit and refitting of all items and conveyance ofall materials. |
| 6 | Insertion of one LT PSC pole in existing three phase OHline including digging &back filling pit in ordinary soil, fitting cross arm, insulator, binding etc. excluding transportation ofpoles |
| 7 | Providing Stay for LT poles including digging & backfilling pit in ordinary soil |
| 8 | Reconductoring (changing) one km LT single phase 2wire OH Copper/old AAC/ACSR conductor line with new ACSR Rabbit conductor including conveyance of materials toand from the stacking place. |
| 9 | Providing concrete muffing of size 0.45x0. 45x1.5m(0.5m above GL and 1m below GL). Excavation 0.45x0.45x1m, concrete (1:3:6, 20mm) 0.45x0.45x1.5m, Plastering (1:3) 12mm 0.45x0.45mx5sides. |
| 10 | Transporting poles by hired vehicle to a distance upto 5km and carrying upto 4 numbers of poles excluding loading& unloading charges. |
| 11 | Dismantling (without damage) one km LT three phase 4 wire OH line conductor by dismantling cross arms, insulators andstacking the conductors inrolls properly |
| 12 | Dismantling (without damage) one km LT single phase 2 wire OH line conductor by dismantling cross arms, insulators andstacking the conductors in rolls properly. |
| 13 | Erecting one LT PSC Pole in position including digging & back filling pit in ordinary soil. |
| 14 | Providing one Coil Earth using No.8 GI-earth wire (50mm dia, 115 turns) including digging separate pit (0.45x0.45x1.5m) at standard distance away from the pole/structure in ordinary soil& backfilling. |
| 15 | Erection of Anchor clamp / dead end clamp for LT ABCof any size |
| 16 | Erection of suspension clamp for LT ABC of any size |
| 17 | Installation of Pre-insulated straight through joints for 16sqmm cable |
| 18 | Installation of Pre-insulated straight through joints for 50sqmm cable |
| 19 | Installation of Pre-insulated straight through joints for 70sqmm cable |
| 20 | Transporting LT ABC by hired vehicle to a distance upto 5 km and carring up to 2 drum including loading and un loading using crane |
| 21 | Stringing of 1.1 kV Aerial bunched cable of size 3 x 70 + 1 x 16+1x 50 sqmm with bare/insulated Messenger through existing poles |
| 22 | Installing One No. 4 way Satellite Connector of size Main :16 to 95, Tap:4 to 35 Sq.mm to the LT AB cable of Standard size |
| 23 | Installation of Insulation piercing connector for main to service line main :16-95 sqmm, Tap 16-95 sqmm Please Enable Macros to View BoQ information |