| 1 | Dismantling and clearing away and carefully stacking materials useful for re-use for any thickness of walls a)Corrugated iron sheet |
| 2 | b)Door including remoal of frames and hinges |
| 3 | C)Brickwork |
| 4 | Supplying and erecting steel centering for sides and soffits of Reinforced Cement Concrete surfaces of following categories including strutting for 3.66m height using MS sheet of size 3'x2'(0.90x0.60) 10gauge stiffened with welded MS angle of size 25x25x3mm laid over silver oak of size 10x6.5cm spaced at 90cm c/c and supported by casurina props 10 to 13 cm dia spaced at 75cm c/c as directed by the corporation officers etc complete complying with standard specification |
| 5 | Supplying, fabricating and placing in position of Ribbed tar steel rods for all RCC works including cost of steel and binding wire also in all floors, complete complying with standard specfication. |
| 6 | Reinforced Cement Concrete 1:2:4 (One Cement, Two sand and Four aggregates) using 20mm gauge hard broken granite stone jelly for RCC works excluding centering, shuttering and cost of reinforcement grills in position but including laying curing and finishing and also fixing clamps wherever necessary and as directed by the Corporation Officers etc., complete complying with standard specifications |
| 7 | Brickwork in cement mortar 1:5 (One cement, five sand )using good second class Chamber bricks of size 23x11x7 cm including curing, complying with standard specification.(Masonry projections to obtain elevation shall be done without extra cost ) For Super structure. |
| 8 | Supplying and Fixing UPVC (Un-plasticized polyvinyl chloride) open windows of casement type (open) the profile the size of outer frame 60mm x 45mm, shutters 60mm x 36mm,and upvc beading 16mm x 125mm and 100% corrosion free the profile and reinforcement with G i /7mm multi chambered sections with wall thick 2mm,. the EPDMrubber (black colour) covered with over all the edges of frame and shutters will be provided with espay multi power point loads and also it operates as handles.Radiations free pin headed 4mm clear glass should be provided , should have key ,lockable action ,security protective hinges ,strong loading systems.The window should be fixed to the wall with 100% packing with screw and silicon packing all round the frames. The rate includes Cost and Conveyance of all materials to work site with all Labour and incidental charges for the completion of work in all respects and Fixing the UPVC window in position with window UPVC frames as directed by the Corporation Officers etc., complete. |
| 9 | Providing and fixing casement doors fabricated from un plasticdized polyvinayl chloride (UPVC)sections.Profiles: The profiles should be three chamber system which provides high insulation properties with outer frame 60mm x 55mm with an outer wall thickness of 2.4mm.The window unit should be desined with all corner joints mitred and fusion welded.windows should be steel reinforced with 25x24x25xmmsteel reinforcement with a thickness of 1mm to have dimensional stability.The sash should be of 60x102mm. The mullion should be of 60x74mm. The profiles should have co extruded seals.hardware: All the hardware like friction stays , handles should be screwed with self tapping screws. The handles locks should be designed so that they cannot be released from outside.Glazing The window system should be glazed with 5mm plain float glass/ 6mmbison Iam . Installation : The profiles should be cut to length and welded 45 degrees.The window should be designed such that the water drainage does not pass through the reinforcement chamber.The window system should be fixed directly to the plastered brick wall using self expanding nylon plug and driving ms eletroplated screws into plug. |
| 10 | Supplying and fixing in position of best quality of colour glazed earthenware Oriya type closet with P or S trap laid in position with 40mm brick jelly concrete and finishing the top to give requried slope and including giving connection to the CI or PVC pipes by dismantling masonry and redoing the same without any leakage as directed by the departmental officers etc complete |
| 11 | Supplying and fixing in position best colour without pedastral oval shape wash hand basin of size 560x450mm with a pairr of C.I. Brackets, 15mm dia C.P. Pillar tap, 32mm pvc. Waste water pipe, 32mm dia C.P. Brass waste coupling, plug with chain, 15mm dia PVC connection, 15mm G.M. wheel valve with I.S.I. mark including fixing wash hand basin in position in the granite slabwith white lead, etc., complete without any leakage complying with standard specifications. |
| 12 | FLOORING with scratch proof CERAMIC TILES of approved quality and colour of size 305 x 305 x 6 mm in all floors over 20mm thick cement mortar 1:3 (one cement and three m sand) base above the existing bed concrete and pointing with same colour cement etc., complete complying with standard specification. |
| 13 | DADOOING THE WALLS with white glazed TILES ofapproved quality of size 300 x 200 x 6mm laid in cement mortor 1:2 (One cement and two msand) and pointing with white cement neatly to full depth of tiles in all floors as directed by the departmental officers and complying with standard specification. |
| 14 | Supplying and fixing of FRP Door Shutter with FRP Door Frame made out of FRP Sheets of 3mm thick of over all size 65mm x 50mm with rebate suitably reinforced using ms angle flats cost of holdfasts and solid core FRP Shutter panel of 5mm thick and hollow core frames of 3m wall thickness for styles and rails etc., complete. |
| 15 | Plastering with cement mortar 1:5 (one cement, five sand) 12mm thick in all floors including curing etc., complete complying with standard specification |
| 16 | Supplying and fixing of 8mm thick Gypsum design board false ceiling in bays of size 600mm x 600mm using powder coated GI angle to the wall support and the main frames using powder coated 24x27mm T angle and intermediates with same T angle. The charges includes fixing the GI angles with adjustable steel rods dropping from the roof purlins and truss and fixing the board in position and all costs and taxes etc complete.The Gypsum design board should be got approved before use on work. |
| 17 | Supplying PAINTING TWO COATS with best and approved first quality of plastic emulsion paint (weather shield)in the inner and outer walls overONE primary coat of wall primer including cost of paint and other materials,brushes, scaffolding charges including clearing the existing surface by manual labour as directed by the departmental officers complying with standard spefication etc complete. Please Enable Macros to View BoQ information |