| 1 | Taking down cement plaster on stone/brick/concrete surfaces including racking out joint, hacking for key, scrubbing down with water complete all as specified and as directed. |
| 2 | Dismantling floor, hearth or wall tiling including cement mortar bedding (but not backing), removing serviceable tiles to store and rubbish off the premises complete all as specified and directed. |
| 3 | Demolition of cement concrete(unreinforced) in ground floors and paving not exceeding 15 cm thickness (below or above ground level) complete all as specified and as directed. |
| 4 | Demolition of cement concrete (unreinforced) of any description and in any position not otherwise specifically provided for complete all as specified and as directed. |
| 5 | Demolition of brick work or stone/boulder masonry, built in cement mortar including all quoins, arches, pillars, etc, but excluding ashlar facings, dressed stonework and precast concrete articles complete all as specified and as directed. |
| 6 | Dismantling of cast iron, PVC pipe or reinforced concrete drain pipes of size 75mm /100 mm jointed in cement mortar and taking out from walls,floors or from trenches, if required complete all as specified and as directed. |
| 7 | Taking up or down 15 mm bore of steel tubing and connections, including cleaning for refixing or removal to store or taken on schedule of credit complete all as specified and as directed. |
| 8 | Taking up or down 20 mm bore of steel tubing and connections, including cleaning for refixing or removal to store or taken on schedule of credit complete all as specified and as directed. |
| 9 | Dismantling water tanks capacity exceeding 250 litres but not exceeding 500 Litres and removing to store complete all as specified and as directed. |
| 10 | Dismantling water tanks capacity exceeding 500 litres but not exceeding 1000 Litres and removing to store complete all as specified and as directed. |
| 11 | Taking down wooden chowkhats or frames with shutters (without taking off shutters from the frames) area not exceeding 1.50 sqm each complete all as specified and as directed. |
| 12 | Taking down wooden chowkhats or frames with shutters (without taking off shutters from the frames) area exceeding 1.50 sqm but not exceeding 4.00 sqm each complete all as specified and as directed. |
| 13 | Taking down wooden door shutter area exceeding 2.00 sqm each incl iron mongary and removing to store complete all as specified and as directed. |
| 14 | Taking down and refixing in same opening wooden door shutter area exceeding 1.00 but not exceeding 2.00 sqm each including resecuring or easing & adjusting complete all as specified and as directed. |
| 15 | Dismantling of wrought or mild steel work of any description not otherwise described into primary parts complete all as specified and directed. |
| 16 | Demolition of stone slabs and tiles of any description or thickness laid, bedded and pointed in any mortar in floors, aprons etc.complete all as specified and as directed. |
| 17 | Taking down existing treatment of any description such as PCC padding, lime concrete, mud phuska etc. and any numbers of layers upto any thickness from roof including scraping and roughening old by picking, sweeping clean and washing down and removing debris outside MD land complete all as specified and as directed. |
| 18 | M & L for cement concrete M15 (Nominal Mix) using 12.5 mm nominal size coarse aggregate in roof kerbs or mud stops,padding, rounded or chamfered on edges complete all as specified and as directed. |
| 19 | M & L for brushing neat cement slurry with 3.0 kg of cement per square meter complete all as specified and as directed. |
| 20 | Material & labour for rendering 15 mm thick in cement mortar 1:4 over RCC Roof mixed with water proofing compound @ 150ml per bag of cement or manufacturer instruction complete all as specified and as directed. (Note;- water proofing compound shall be measured and paid separately as supply only) |
| 21 | Supply only liquid water proofing compound complete all as specified and directed. Please Enable Macros to View BoQ information |
| 22 | Supply only liquid water proofing compound complete all as specified and directed. Please Enable Macros to View BoQ information |