| 1 | Excavation for foundation / pipe trenches in earth, soils of all types, sand, gravel and soft murum, including removing the excavated material upto a distance of 50 metres and lifts as below, stacking and spreading as directed, normal dewatering, preparing the bed for foundation and excluding backfilling, etc. complete.(MJP CSR 2023-24. I.No.1/Bd-A-1/259)) |
| 2 | Lift upto |
| 3 | Excavation for foundation / pipe trenches in hard murum, including removing the excavated materials upto a distance of 50 metres and lift as below, stacking and spreading as directed, normal dewatering shoring and strutting, preparing the bed in gradient & alignment as per site rails for lowering, laying of pipe line including making provision for guarding trenches as per site condition for safety and excluding back filling etc complete.Lift 0 to 1.5 metres.(MJP CSR 2023-24. I.No.2/Bd-A-2/259)) |
| 4 | Lift upto |
| 5 | Excavation for foundation / pipe trenches in hard murum and boulders, W.B.M. road including removing the excavated material upto a distance of 50 M beyond the area and lifts as below, stacking and spreading as directed by Engineer-in-charge, normal dewatreing, preparing the bed for foundation and excluding backfilling, etc. complete.(MJP CSR 2023-24. 3.No.1/Bd-A-3/259)) |
| 6 | Lift upto |
| 7 | Excavation for pipe trenches in soft rock & old cement & lime masonary foundation asphalt road including removing the excavated material upto a distance of 50 m beyond area & list as below stacking as directed by Engineer-in-charge, normal dewatering / preparing the bed for foundation & excluding back filling etc. complete & refilling the trenches with available excavated staff with soft material first over pipeline & then hard material in 15 cm layer with all leads & lifts excluding back filling etc. complete. (MJP CSR 2023-24. 5.No.1/Bd-A-4/259)) |
| 8 | Lift upto |
| 9 | Excavation for foundation / pipe trenches in hard rock and concrete road by chiselling, wedging, line drilling, by mechanical means or by all means other than blasting including trimming and levelling the bed, removing the excavated material upto a distance of 50 metres beyond the area and lifts as below, stacking as directed by Engineer-in-charge, normal dewatering, excluding backfilling, etc. complete by all means.(MJP CSR 2023-24. I.No.7/Bd-A-1/259)) |
| 10 | Lift upto |
| 11 | Refilling the trenches with available excavated stuff with soft materials first over pipeline and then hard material in 15 cm layers with all leads and lifts including consolidation, surcharging etc., complete.(MJP CSR 2023-24. I.No.1Sec E)) |
| 12 | Providing Dl Pipes (push on joints pressure pipes of Dl of following class & Dia meters conforming to the lndian Standard Specification inclusive cost of jointing materials (Rubber Gasket of EPDM Quality) including all statutory duties & taxes such as GST levied by GOI & GOM in all respect, Third Party lnspection charges of TPI agency approved by the MJP including transit insurance, Railway freight, unloading from railway wagon, loading in to the truck, transportation to departmental store / site of work, unloading, stacking etc. completed as directed by Engineer-in-Charge (lS:1536:2001 for pipes& lS:158:1969 & 15:12820:1989 or latest edition / revision with amendments for rubber gaskets). (lS:8329:2000 latest version)(MJP CSR 2023-24. Sr.No.30)) DI K7 100 mm |
| 13 | Lowering laying and jointing with SBR ruber gaskets C.I. S/S pipes of various classes with CI / MS specials of following diameter in proper position, grade and alignment as directed by Engineer-in- charge including conveyance of material from stores to site of work, including cost of jointing materials and rubber rings labour, etc. complete.(MJP CSR 2023-24)100 mm dia |
| 14 | Providing and supplying ISI standard C.I. flanged / S & S Specials excluding GST GOI & GOM in all respect Railway freight, insurance, unloading from railway wagon, loading into truck, transport to departmental. Store/site, unloading, stacking etc. complete.D/F Specials:- |
| 15 | Providing double flange sluice valve confirming for IS-2906/14846 including worn gear arrangements as per test pressure stainless steel spindle, caps including all taxes transportation etc. complete. Sluice valves - PN -1 without byepass arrangement - 100 mm |
| 16 | Lowering, laying and jointing in position following C.I.D/F Reflex valves, Butterfly valves and Sluice valves including cost of all labour jointing material, including nut bolts and giving satisfactory hydraulic testing etc. complete. (Rate for all class of valves.)100 mm dia |
| 17 | Supply of C.I. mechanical compression collar coupling suitable for C.I. spun pipes (as per IS-1536/2001) and complete with sealing rubber gasket of SBR, C.I., follower glands and M.S. nut bolts. The whole assembly should be mechanically and hydraulically tested to the provisions as laid down in IS:1538/1993).100 mm |
| 18 | Supply of C. I. Mechanical Compression Flanged / Socket Tailpiece(Popularly known as I TM Flanged / Socket Tailpiece) suitable for making flanged connection with the plain barrel of C. I. Spun Pipes ( as per - IS - 1536 /2001) and D. I. Pipes ( as per IS: 8329 / 2000).The Tailpiec to be supplied complete with sealing rubber gasket of S.B.R,.C.I.. Follower Glands and M.S. Nut Bolts.The whole assembly should be mechanically and hydraulically tested to the provisions as laid down in IS:1538 /1993. The rates are inclusive of cost of material, forwarding charges,including all statutary duties and taxes such as GST levied by Gol and GoM in all respect, loading, transportation and unloading at departemental store etc. complete as directed. Consignee but exclusive of octroi.Tail Piece 700 mm |
| 19 | Tail Piece 600 mm |
| 20 | Tail Piece 500 mm |
| 21 | Tail Piece 400 mm |
| 22 | Tail Piece 150 mm |
| 23 | Providing and laying Cast in situ/Ready Mix cement concrete in M20 of trap/granite/quartizite/gneiss metal for bed bolcks, foundation blocks and such other items including bailing out water, Steel centering formwork, laying/pumping, compacting, roughening them if special finish is to be provided, finishing uneven and honeycombed surface and curing etc complete. The Cement Mortar 1:3 plaster is considered for rendering uneven and honeycomnbed surface only. Newly laid concrete shall be covered by gunny bag, plastic, tarpaulin etc. (Wooden centering will not be allowed.) with fully authomatic micro processor based PLC with SCADA enabled reversible Drum Type Mixer /concrete Batch Mix plant (Pan mixer) etc complete. .. With fine aggregate (Crushed sand VSI Grade)NMC PWD CSR 2023-24, BDE-5 - 24.15, Item Sr.No. 392) |
| 24 | Providing and fixing heavy duty inter locking concrete Coloured paving blocks of 80 mm thickness of having a strength of 300 kilogram/Sq.cm of approved quality and shape on a bed of crushed sand of 25 to 30 milimeter thick including striking joints and cleaning etc. complete (using 100% crushedl sand)NMC PWD CSR 2022-23, BDM-33.52, Item Sr.No. 595, Page No. 78 |
| 25 | Construction of granular sub-base by providing close graded Material, mixing in a mechanical mix plant at OMC, carriage of mixed Material to work site, spreading in uniform layers with motor grader/ Paver on prepared surface and compacting with vibratory roller to achieve the desired density, complete as per clause 401 -- Plant Mix Method and Grading - I Material |
| 26 | Filling in plinth and floors with contractors material/brought from outside and approved by Engineer incharge in layer of 15 cm to 20 cm including watering and compaction etc. complete.NMC PWD CSR 2022-23, BDA - 11 - 21.37, Item Sr.No. 365, Page No. 54 |
| 27 | Providing dry trap / granite / quartzite / gneiss, rubble stone soling in 15cm to 20 cm thick layers (including hand packing and compacting), etc. complete.NMC PWD CSR 2022-23, BDA - 12 - 21.38, Item Sr.No. 366 |
| 28 | Providing and fixing in position TMT - FE - 500 bar reinforcement of various diameters for R.C.C. pile caps, footings, foundations, slabs, beams columns, canopies, staircase, newels, chajjas, lintels pardis, copings, fins, arches etc. as per detailed designs, drawings and schedules. including cutting, bending, hooking the bars, binding with wires or tack welding and supporting as required complete.NMC PWD CSR 2022-23, BDF 17, Sr.No. 427 |
| 29 | Manufacturing,providing and supplying spirally welded / ERW / SAW / fabricated M.S.pipes (CommercialQuality) including procurements of plates,gascutting to requried size rolling, tackweldingassembling insuitable lengths to form pipes,welding on automatic welding machine and forming‘V’ edge on both ends of pipes including railway freight, insurance,unloading from railway wagon, loading into truck, transport tostores,unloading,stacking excluding GST levied by GOI & GOM in all respect, etc, complete as per IS-3589 and IS-5504 as applicable asperspecifications (Nonegative tolerance in thickness is permissible)(B) Dia of Pipe:200 mm(O.D.) Thickness of pipe:10 mm |
| 30 | Providing, fabricating and fixing expansion joints for pipelines as per the drawing. The rate to include machining the strakes and steel ring as shown in the drawing and welding on either automatic welding machine or manually, Rate includes plates and flats required for expansion joint and all other materials such as synthetic rubber, rubber ring, etc. including packing as per specifications, grease, bolts and nuts, local handling, excluding GST levied by GOI & GOM in al lrespect etc.complete.Expansion joints suitable for pipe diameters700 mm dia |
| 31 | 1000 mm dia |
| 32 | 1200 mm dia |
| 33 | Lowering, laying inposition to correct lineand level including M. S. pipes with / without any out coating on pedestals or chairs upon prepared formation. The rate to include loading, unloading, hoisting, marginal cutting wherever required, assembling and tack welding, and transportation upto 500M.etc.completed as specified.(Ref.MJP CSR 2023-24-Sect.I(XVI)M.S.Pipe Laying Sr.No.1 Page No.182)From 750 mm Upto 1000 mm dia |
| 34 | Above 1000 mm Upto 1250 mm dia |
| 35 | Above 1250 mm Upto 1500 mm dia |
| 36 | Welding inall positionswithrequirednumberof runs, for M.S.pipes internally and /or externally including gauging wherever necessary, fixing appurtenances and other accessories in connectionwith pipe layingwork as per specification.(Ref.MJP CSR 2023-24-Sect.I(XVI)M.S.Pipe Laying Sr.No.7 Page No.186)10 mm dia |
| 37 | Gas cutting (either square cut or V cut) pipes, plates, etc. Of thickness.(Ref.MJP CSR 2023-24-Sect.I(XVI)M.S.Pipe Laying Sr.No.12 Page No.187)Above 5 mm Upto 10 mm |
| 38 | Providing and fixing 100mm diameter water meter with non-return valve including strainer, sockets/ union nut and including water meter box making locking arrangements and lock. [Without chamber].NMC PWD CSR 2022-23, BDV 7, I.No. 41.32, Sr.No. 884 |
| 39 | Providing & Constructing B.B. Masonary Chamber with 100 mm thick 1:3:6 PCC for bed on 100 mm thick oversizer soling with 80 mm metal including excavation, 23 Cm thick B.B. masonary in C.m. 1: 6 inside plaster in C.M. 1:6 20mm thick and outside plaster.NMC PWD CSR 2022-23 Item No. 1138, Page No. 122Chamber size 0.9MX0.6MX0.45 M |
| 40 | Add for Extra Depth 0.15M |
| 41 | Transportation of Material obtained from debris of various sorts including necessary excavation/loosing including loading, unloading and conveying and disposing as directed (Ref. NMC PWD CSR 2020-21 I.No. NSR Sr.No. 342, Page No. 51)5 KM(Total of Item No. 3,4 & 5) |
| 42 | Providing complete set of Fire Hydrant Please Enable Macros to View BoQ information 4464042.0 535685.04 4999727.04 4464041.95 535685.034 |