| 1 | Item No.1:- Clearing and grubbing road land including uprooting rank vegetation, grassl nisjes, shrubsm saplings and trees girth up to 300mm, removal opf stumps of trees city earlier etc. |
| 2 | Item No.2:- Excavation in soft rock without blasting including boulders up to 0.6 m dia. (0.113Cum) for canal, seating of embankment, filter drain / catch water drains etc., and placing the excavated soft rock neatly in dump area of for formation of service road including cost of all materials, machinery, labour,dressing bed & sides to required level and profile etc. complete with l;eads as below and all lifts as directed. |
| 3 | Item No.3:- Excavation in hard rock of all toughness by Breaker including boulders above 0.6 m dia. (0.113Cum) minimising damage to side slopes of excavation in water prism area by adopting any one or combination of line drilling / pre-spliting / smooth blasting techniques and placing the excavated rock neatly in approved dump area as directed including cost of all materials, machinery, labour, levelling bed etc |
| 4 | Item No.4:Providing and fixing anchor bar of 25 mm diameter 3.375 m length with resin bond cement capsule anchorage thorough adit/itself including driling holes, inserting grout capsule, driving anchor, cost of all materials, machinery, labour, ventilation, lighting, drainage and other ancillary operations etc. complete with all lifts as Directed etc. |
| 5 | Item No.5:- Providing and laying in situ C.C. of grade M - 15 of trap / granite / gneiss / quartzite graded metal for foundation And Bedding with Batching plant and Transit Mixer including placing, compacting, curing etc. Complete with |
| 6 | Item No.6:- Providing and laying in situ C.C. of grade M - 20 of trap / granite / gneiss / quartzite graded metal for RCC works of gallery, sluice, spillway crest, spillway, downstream face, energy dissipating structures, intake structures, training walls, piers, abutments, slab etc. with Batching plant and Transit mixer including centering, shuttering, scaffolding, placing, compacting, curing etc. complete with all lifts etc. complete as directed. |
| 7 | Item No.7:- Providing and fixing M.S. chequerred plate flooring of following thickness supported on M.S. anfles (25x25x5 mm size) including welding, cutting and fabricating the plates to the required square of rounding shape, etc. |
| 8 | Item No.8:- Dewatering by pumping out water collected with 10 to 19 HP Diesel & Electyrical pumps including cost of all materials, machinery, labour, providing sump and all other ancillary operations whernever necessary etc. complete under specific and indispensable circumstances with prior approval from competent authourity with authentic evidence3 fo records justifying dewatering etc. complete as directed. |
| 9 | Item No.9 :- Providing & fixing in position steel reinforcement of verious diameters for RCC pile caps, footings, foundations, slabs, beams, columns, staining walls, etc. as per detailed drawings, designs & schedules. Including cutting bending, hooking & binding with wires etc. completed |
| 10 | Item No.10- Making provision for Royalty Chargs etc complete |
| 11 | Item No.11- Providing And Fixing in position Name Board of the work showing details of the Scheme etc complete |
| 12 | Insuranch Charges |
| 13 | GST Please Enable Macros to View BoQ information |