|
| 1 | Cutting & clearance of jungle, bushes, shrubs Ankra/Ipomoea, Julicflora typna etc. on canal and bunds in /moist/slushy conditions including disposal as per instructions of the Engineer-in-charge. Cost of wood has been deducted from rates and thus will be property of contractor after cutting. thick.of contractor after cutting. thick. |
| 2 | Excavation including loading, unloading, disposal and dressing of excavated rock within initial lead of 50m and lift up to 1.5m in dry or moist including dressing of excavated area, dewatering wherever required complete in all respect.(a) Soft/ Disintegrated rock |
| 3 | Excavation including loading, unloading, disposal and dressing of excavated rock within initial lead of 50m and lift up to 1.5m in dry or moist including dressing of excavated area, dewatering wherever required complete in all respect.(b) Hard rock not requiring blasting |
| 4 | Excavation including loading, unloading, disposal and dressing of excavated earth within initial lead of 50m and lift up to 1.5m including dressing of excavated area, dewatering wherever required complete in all respect.(a) Hard/ dense soil |
| 5 | Excavation including loading, unloading, disposal and dressing of excavated earth within initial lead of 50m and lift up to 1.5m including dressing of excavated area, dewatering wherever required complete in all respect.(b) Hard soil mixed with Kankar/ boulders, Morrum |
| 6 | Preparation of foundation of structure including removal of all loose stone , silt and final washing by manual labour. |
| 7 | Dismantling old plaster or skirting, racking out joints and cleaning the surface for plaster including disposal of rubbish to the dumping ground within 50 m lead, inclusive of de-watering wherever required. |
| 8 | Providing and Laying in position of Cement concrete Nominal mix (1:3:6) including leads of all construction materials, curing, compaction and finishing with rendering in cement sand mortar 1:3 (1 cement : 3 coarse sand) and making good the joints excluding the cost of centering, shuttering and reinforcement. Well graded crusher broken stone aggregate of maximum size upto 20 mm |
| 9 | Random rubble stone masonry (using R. R. stones where 75 % stones to be not less than 15 cm in size in any direction and weighing not less than 23 kg.) for super structure including curing all leads of all construction materials including curing etc. complete.In cement sand mortar 1:6 |
| 10 | Providing and Laying in position of Cement concrete Nominal mix (1:2:4) including leads of all construction materials, curing, compaction and finishing with rendering in cement sand mortar 1:3 (1 cement : 3 coarse sand) and making good the joints excluding the cost of centering,shuttering and reinforcement. Well graded crusher broken stone aggregate of maximum size upto 20 mm |
| 11 | Side shuttering including propping etc. complete (to achieve finish F 2 for : Retaining wall, counterfort, abutment, wing walls up stream or downstream slope facings of dams and open faces of construction joints etc. |
| 12 | Plaster in cement sand mortar 1:3 including racking of joints, smooth finishing & curing etc. complete including all leads of all construction materials of thickness: 20mm |
| 13 | Providing and laying cement concrete coping in (1:2:4) with maximum size of crusher broken aggregate up to 20 mm including shuttering etc. with all leads of material complete in all respect in thickness of: 50mm |
| 14 | Earth work in rough (borrow area) excavation for embankments in hard soil, morrum or highly weathered strata dry or moist, including laying in 20 cm layers (before compaction) and breaking of clods, sorting of grass, pebbles etc. and dressing when compacted by vibro compactor, vibro sheep foot roller, sheep foot roller/pneumatic tyred roller to obtain dry density of at least 98% of Standard Proctor's density with initial lift of 1.5m (Excluding charges for compaction and watering) including loading and un-loading wherever required complete in all respect. With lead beyond 250 m and up to 750m (½ km)- Rs. 137.50. [Deduct in item no. 16 (a) to (d) above if standard proctor's density to be achived is at least 90%- Rs. 19.00] |
| 15 | Watering of earth including cost of carriage of water when source of water is (b) Beyond 250 m but up to 1 Km |
| 16 | Labour charges including watering for puddle work to obtain minimum dry density as 90% of M.D.D. |
| 17 | Supplying of M.S. reionforcement including labour charges for bending binding and placing in position all reinforcement as per drawing including cost of binding wire and all leads and lifts using Tor or ribbed bars (IS :1786-1985) Please Enable Macros to View BoQ information |