| 1 | Dismantling GS sheet roofing including ridges, hips ,valleys, gutters wind ties etc. including dismembering and stacking of serviceable materials and unserviceable materials separately with all lifts and upto a lead of 50 m etc. complete as per direction of the Engineer-in –charge |
| 2 | Dismantling old plaster or pointing , raking out joints, cleaning and preparing the surface for re-plastering or re-pointing including disposal of rubbish to the dumping with all leads and lifts etc. complete as per direction of the Engineer-in-charge |
| 3 | Labour charges for corrugated G.S sheet roofing including vertical/curved surface fixed with polymer coated J or L hooks, bolts and nuts 8mm diameter with bitumen and G.I limpet washer filed with lead and i/c a coat of approved steel primer and two coats of approved paints on overlaping of sheets complete (upto any pitch in horizontal vertical or curvrd surface) ex/c the cost of purlins, rafters and trusses and i/c cutting to size and shape wherever required (1) 0.63 mm thick with zinc coated not less than 275gm/m2 |
| 4 | Providing and fixing PVC false ceiling providing SPUF 142-D-01 (Different design 10 mm thick 150 mm width and necessary length) approved colour concelled type penneled carrier T section (EWUF 106:40X63.5 mm and L section (EWUF 405:40X68 mm) with necessary screws, hold fast, wooden beading and M.S pipe structured 48 mm dia @ 1200 mm c/c including cutting holes and making good walls etc. complete as per direction of Engineer-in-Charge |
| 5 | Providing and laying in position cement concrete of specified grade excluding the cost of centring and shuttering -All work upto plinth level: 1:2:4 (1 Cement: 2 fine sand : 4 graded well burnt brick aggregate 20 mm nominal size |
| 6 | Half brick masonry work with first class bricks in superstructure upto floor five level including cost of all materials as required complete: a) In cement mortar 1:4 (1 cement : 4 fine sand) |
| 7 | Steel work in built up tubular (round, square or rectangular hollow tubes etc.) trusses etc. including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer, including welding and bolted with special shaped washers etc. complete. a) Hot finished welded type tubes |
| 8 | Supply & installation of pre-painted Galvalume sheets for roofing/cladding (size, shape and pitch of corrugation as approved by Engineer-in-charge) in 550mpa steel grade, made out of Cold Rolled Steel coated with Zinc-Aluminium alloy coating of 43.5% Zn, 55% AI and 1.5% Silicon confirming to ASTM A792/A792M and AS1397, Alloy coating AZ150/AZ70,colour coated with high quality Polyester coating, top coated of modified polyester of 20 micron, back side coat of 5 micron, having epoxy prime coat of 5 micron on both side. Sheet should have protective guard film of 25 microns minimum to avoid scratches while transportation and should be supplied in single length upto 12 metre or as desired by Engineer-in-charge. The sheet shall be fixed using self drilling/self tapping screws of size (5.5x 55mm) with EPDM washers filled with white lead complete upto any pitch in horizontal/vertical or curved surfaces excluding the cost of purlins, rafters, and trusses and including cutting to size and shape wherever required and as per direction of Engineer-in-charge. i) 0.50 mm thickness |
| 9 | Supply & installation of pre-painted Galvalume sheets roofing accessories in 550mpa steel steel grade, made out of Cold rolled steel coated with Zinc-Aluminium alloy coating of 43.5% Zn, 55% AI and 1.5% Silicon confirming to AASTM A792/A792M and AS1397, Alloy coating AZ150/AZ70, colour coated with high quality polyester coating, top coated of modified polyester of 20 micron, back side coat of 5 micron, having epoxy primer coat of 5 micron on both side etc. complete as per direction of Engineer-in-charge. Sheet should have protective guard film of 25 microns minimum to avoid scratches while transportation. Sheet should have protective guard film of 25 microns minimum to avoid scratches while transportation. The sheet shall be fixed using self drilling / self tapping screws with EPDM washers complete for Ridges/Valley/Gutter/Flashing of width 610mm : i) 0.50mm thickness |
| 10 | Steel work welded in built up section/framed work including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer using steel etc. complete as required: i) In grating, frames, guard bar, railing, brackets, gates and similar works, all complete |
| 11 | 12 mm cement plaster of mix (1) In cement mortar 1 : 4 (1 cement : 4 fine sand) |
| 12 | 12 mm cement plaster of mix in/c net cement punnig a) In cement mortar 1 : 4 (1 cement : 4 fine sand |
| 13 | 15 mm cement plaster on the rough side of single or half brick wall of mix: a) In cement mortar 1: 4 (1 cement : 4 fine sand) in/c net cement punnig |
| 14 | Distempering with 1st quality acrylic distemper (ready mixed) having VOC content less than 50 grams/litre, of approved brand and manufacture to give an even shade (Payment shall be made after submission of Test Certificate issued by the Manufacture) : New work (two or more coats) over and including water thinnable priming coat with cement primer |
| 15 | Finishing walls with acrylic smooth exterior paint of required shade of approved brand and manufacture (Payment shall be made after submission of Test Certificate issued by the Manufacturer) : New work (two or more coats applied @ 1.67 litre/10 sqm over and including priming coat of exterior primer applied @ 2.20 kg/10 sqm) |
| 16 | Painting with synthetic enamel paint of approved brand and manufacture of required colour to give an even shade (Payment shall be made after submission of Test Certificate issued by the Manufacture) : Two or more coats on new work over an under coat of suitable shade with ordinary paint (prime) of approved brand and manufacture |
| 17 | Painting on G.S sheet with synthetic enamel paint of approved brand and manufacture of required colour to give an even shade (Payment shall be made after submission of Test Certificate issued by the Manufacture) : a) New work (two or more coats) including a coat of appropriate steel prime but excluding a coat of mordant solution Please Enable Macros to View BoQ information |