Name of Work:- Construction work of passenger rest area in Arrai Gram Panchayat, Karchhna Development Block LOT-3
Sl. No.
Item Description
1
Earth Work in Excavation in foundation in ordinary soil(Loam clay or sand) including lift up to 1.50 m and lead 30.00m. Including fitting watering and ramming of exacavated earth into trenches of into the space between the building and the side of foundation trenches or into the plinth and removal&disposal as per SI. No. 251
2
Concrete with 40mm guge brick bllast, fine local sand 1.25 fineness modulous and cement in proportion of 8:4:1 in foundtion and under floors including supply of all material labour and T&P etc. required for comletion of the work.
3
M-150 brick work in 1:6 cement & coars sand (1.25 F.M) mortar in foundation and plinth SI No 303.
4
M-150 brick work in 1:6 cement & coars sand (1.25 F.M) mortar in superstructure tincluding all complete of work.SI No 305
5
12 mm thick cement plaster in 1:4 cement & fine sand mortor.As per SI no 597c
6
Providing and laying of 2.5 cm thick p.c.c 1:2:4 (without base concrete) with cement coarse sand and 20 mm gauge stone grite including all ISI No 601A
7
R.c.c. work with cement approved coarse sand and 2cm gauge approved stone grit in propottions of 1:2:4 in slab of door and windows excluding supply of reinforcement and its bending but including its fixing and binding the same with 24 B.W.G.G.I. Binding wire and including necessary centering and shuttering etc. and supply of all materials, labour, T&P etc required for proper completion of the work including cost of binding wire. The rate excludes making of drip course which shall be paid extra excluding GST. SI.No. 283
8
R.c.c. work with cement approved coarse sand and 2cm gauge approved stone grit in propottions of 1:1.5:3 in slab of door and windows excluding supply of reinforcement and its bending but including its fixing and binding the same with 24 B.W.G.G.I. Binding wire and including necessary centering and shuttering etc. and supply of all materials, labour, T&P etc required for proper completion of the work including cost of binding wire. The rate excludes making of drip course which shall be paid extra excluding GST. SI.No. 284
9
M.S. (tor steel or plain) in plain work such as Rcc or R.B. work including supply of steel & its wastage bend, hooks and authorised overlapping shall be measured and including cost of binding wire. Exculding GST. SI No. 504
10
Finishing Wall with water proof cement paint of approved make and quality on new work with two coat to give an even shade including supply of all materials, labour , tools and plants etc. reqired for proper completion of the work SI No 660+661
11
Supply and fixing tiles in flooring or in skirting or dado laid with 1:3 cement and approved coarse sand mortar finished with white cement slurry,jointing and polishing complete, including supply of all materials, labour and tools & plants etc. required for proper completion of the work .SI No 628
12
Deduction 05% = 28929.76 Please Enable Macros to View BoQ information
We takes all possible care for accurate & authentic tender information, however Users