| 1 | Earth work in hard soil or gravelly soil within 50m. Initial lead and 1.5m. Initial lift icluding rough dressing and bracking clods to maximum 5cm to 7cm and laying in layers not exceeding 0.3m. in depth and transportation of excavated earth by mechanical meanse as per the direction of the engineer-in-charge. |
| 2 | Filling in foundation & plinth with sand watered & rammed including cost, conveyance royalty etc., Complete. |
| 3 | C:C: (1:4:8) using 4 cm. size H.G. C.B metal including the cost of all materials, labour carriage, royalty etc complete. |
| 4 | CC work of M20 Grade with 20 mm sizeand down graded black hard granite chips including cost, conveyance and royalty of all materials, cost of all labour,T&P etc. complete |
| 5 | Brick work Fly Ash Brick in C.M (1:6) in Foundation including cost, conveyance and royalty and watering for curing etc complete. |
| 6 | CC work of M25 Grade with 20 mm sizeand down graded black hard granite chips including cost, conveyance and royalty of all materials, cost of all labour,T&P etc. complete |
| 7 | Rigid and Smooth cantering & shutting for R.C.C. Work including false work Dismantling then after casting etc. all complete. A)Column and Beam |
| 8 | B) Roof Slab |
| 9 | Supplying, fitting and placing uncoated HYSD bar reinforcement complete as per drawing and technical specification. |
| 10 | 6 mm. thick C.P (1:4) with all cost, conveyance and royalty etc. all complete. |
| 11 | 12 mm. thick C.P (1:6) with all cost, conveyance and royalty etc. all complete. |
| 12 | Fixing Granite tiles in floors treads or steps and landing on 25mm thick bed of cement mortar 1:1(1cement : 1sand) jointed with neat cement slury mixed with pigment to match the shades of the tiles including rubbing and polishing complete excluding cost of precast tiles etc. all complete. |
| 13 | Fixing Granite tiles in dados skirting and risers of steps on 12mm thick cement plaster (1:3) jointed with neat cement slurry mixed with pigments to match the shade of the tiles including rubbing and polishing complete excluding cost of precast tiles. per 1 sqm . |
| 14 | Priming 1 coat with any appproved Primer (Labour only) including cost of primer etc. complete |
| 15 | Wall painting 2 coats with plastic emulsion paint of approved shade on new work to give an even shade inculding cost of paint (For 10 Sqm.) |
| 16 | Finishing walls with weather coat paint over a primer coat paint. etc. all complete. |
| 17 | Supplying, fitting and fixing of Stainless steel of 304 grade in hand railing using 50mm dia of 2mm thick circular pipe with Balustrade of size 32mm x 32mm x 2mm C* 0.90mtr. C!C and stainless square pipe bracing of size 32mm x 32mm x 2mm in 3 rows in stair case as per approved design and specification, buffing, polishing etc with cost, conveyance, taxes of all materials, labour, T&P etc. required for the complete in all respect. Please Enable Macros to View BoQ information |