| 1 | Providing UPVC (Un-Plasticized Polyvinyl Chloride) Door: Providing and fixing casement doors fabricated from un-plasticized polyvinyl chloride (UPVC) sections. Profiles: The profiles should be three chamber system which provides high insulation properties with outer frame 60mmx55mm with an outer wall thickness of 2.4mm. The window unit should be designed with all cirner hoints mitred and fusion welded. Windows should be steel reinforced with 25x24x25mm steel reinforcemnet with a thickness of 1mm to have dimensional stability. The sash should be of 60x74mm. The profiles should have co-extruded seals. Hardware: all the hardware like friction stays, handles should be screwed with self tapping screws. The handles, locks should be designed so that they cannot be released from outside. Glazing: The window system should be glazed with 5mm plain float glass/6mm bison lam. Installation: The profiles should be cut to length and welded 45 degrees. The window should be designed such that the water drainage does not pass through the reinforcement chamber. The window system should be fixed directly tot he plastered brick wall using self expanding nylon plug and driving MS electroplated screws into plug. |
| 2 | Supplying and fixing UPVC windows and casement type (open) from the profile the size of outer frame 60mm x 58mm and the shutter profile are reinforcement with GI /1mm 125GSM and 100% corrosion free, the profiles are multi chambered section wall thick of 2mm. The EPDM rubber (Black colour) covered with over all the edges of frames and shutter the shutter will be provided with ESpag multi unit power locks also operate it as handle. The corners and joints should be welded and cleaned.Radiation free pin headed plain or brown colour glass 4mm thick should be provided to the shutter and it should not allow laekage of water even atmost ranging stroms and should has key lockable action , security protective hinges, strong locking system and as per size for arresting noise and energy loss. The connecting mechanism betwenn sash and outer frame that enables the opening of the windows. The windows should be fixed to the wall with 100% packing with screw and silicon packing all round the frames. The windows should be got approved from the executive engineer before use on work. |
| 3 | Painting the ceiling /wall surface with one coat of cement painting with white cement over plain surface including labour cost of paint, brush etc..Complete as standard specification. |
| 4 | Supplying and PAINTING the old wall surface with two coat of synthetic enamel paint over the existing priming coat. The rate is inclusive of cost of all materials and labour, brushes etc.. complying with standard specification. |
| 5 | Supplying and PAINTING OLD plastered wall surfaces in all floors with TWO coats approved quality and colour of Emultion paint over priming one coat with white cement. The rate is inclusive of cost of all materials and labour, brushes etc complying with standard specification. As directed by the departmental officers. |
| 6 | FLOORING with scratch proof CERAMIC TILES (colour with design) of approved quality and colour of size 305x305x6mm in all floor over 20mm thick cement mortar 1:3 (one cement, three sand) base above the existing bed concrete and pointing with same colour cement added with coloring pigment etc., complete, complying with standard Specification. As directed by the departmental officers. |
| 7 | REDADOOING THE WALLS With white colour GUAZED TILES of size 300*200*6mm of best approved quality ion cement motor 1:2 (one cement and two stand )and pointing with the same colour cement neatly to full death of tiles in all floors as directed by the dapartmental officers and complying with standard specifacition. the colour of the tiles should be the tiles should be got approvrd by the departmental officers before execution |
| 8 | Supplying and fixing in position best white glazed earthenware Oriya type INDIAN WATER CLOSET of approved quality of size 584mm with 'P' or 'S' trap and embedding the closet with trap to shape in position with 40mm brick jelly concrete 1:2:5 (One lime, two sand and five brick jelly) and finishing the top to the required slope and including giving connection to the C.I. soil stacks by dismantling the masonry floor or RCC works and redoing the same to the original condition without any leakage etc., complete as directed by the departmental officers.( The water closet should be got approved by the departmental officer before use on work ) |
| 9 | double flapped seat cover 12.50 lits capacity pvc low lavel flshing tank inculding all internal fittings fixed on c i brackets 12mm pvc or brass nipple cromium plated brown headed stop cock ,12mm niylon connection with nessary teekwood plges ,cews to the portion coming with walls and floors,including dismantling masnory and redoing the to the original condition etc., complete as directed by the departmental officers.( The water closet should be got approved by the departmental officer before use on work ) |
| 10 | Supplying and eraction of Air conditioner , stabilizer , double pole MCB wityh box , single pole MCB with box ,20AMPS 3 CORE 205sq.mmcable wire 4x20 sq.mm Alu. Ug cable,63 ampsTPN Main switch etc., complete as per standared specification |
| 11 | Supplying and fixing for ceuilling fan with regulator as per standared specification etc., complete. |
| 12 | Supplying and fitting for window screen as per stadared specipication etc., complete. |
| 13 | Supplying and fitting for tube light fittings as per standared specification and as per corporation officers Please Enable Macros to View BoQ information |