|
| 1 | Earthwork in excavation or re-excavation of drainage channels / rivers in all kinds of soil including silt, sand, slush etc. mixed with all sorts of Industrial wastes, sewages, municipal garbage, carcasses, tannery effluents, jungles, bushes, semi-solid / solid campact mass, water hyacinth, cowdung deposits, decomposed vegetations, polythenes, brick bats, gravels, stone ballast, crates, remnant of bullah and bamboo pins etc. by means of suitable excavator mounted on pontoon (min. depth of water 0.75 metre) specially made to suit the site condition in tidal or non-tidal channel / river and carrying of the excavated materials to suitable locations of the channel / river bank from the point of excavation by diesel machine operated boats or similar arrangements in a manner suited for the purpose and placing the excavated materials from the boat etc. on the top of the bank in case of disposal at suitable places arranged by the agency at his own cost, on the bank at available locations having distances from the point of re- excavation as shown below, by means of excavators or any other machines or manually as may be required, including all lifts.. Measurement : By Pre-work and Post- work level sections. Pre-work level for the existing bed of the channel / river is to be taken by displacing water hyacinth and all other floating materials including compact masses, carcasses etc. and for which no extra payment will be made. Post-work level section will be taken only when a stretch of at least 300 metre is completed and the said post-work will be taken within 7 days after completion of excavation in that reach. Note- The cost for the above work includes the cost of hire charges of excavator including all accessories, excavators, diesel machine operated boats, pontoons etc. and including the cost for mobilisation, demobilisation, maintenance, cost of fuel and lubricants, wages of operators and labours and all other incidental charges as may be necessary for the above work and the rate also includes the charges of dismantling and re-erection of machine excavator, pontoon etc., if necessary, in the interest of work or for passing of the machines etc.below the bridges.(a) For distance 0 to 50 metre from the point of re-excavation to the placing point on the bank.Show Less |
| 2 | Earthwork in re-excavation / silt clearance in drainage channel in all kinds of soil including sludge, slush mixed with all sorts of industrial wastes and municipal garbages, polypacks, carcasses, small khatal effluents, night soil etc. by mathor labour as may be necessary and depositing the same in places as directed by the Engineer-in-charge , in such a manner, without causing much hindrance to traffic and posing health hazard and making arrangement to maintain the site in workable condition and rough dressing when dry including making arrangement of bailing out of any seepage water and removal of sand or soil blown from underneath, removal of khatal, temporary latrines, clearing and removing all kinds of semi compact masses formed by water hyacinth, jungles up to 30 cm girth, and burning them to ashes or removing outside Government land in conformity with the Municipal rules, including shoring shuttering as required, nicking out lines etc. (Measurement : By Pre-work and Post-work level section. Pre-work level for the existing bed of the channel/river is to be taken by displacing water hyacinth and all other floating materials including compact masses, carcasses etc. and for which no extra payment will be made. Post work level section will be taken only when a stretch of at least 300mt. is completed and the said post work will be taken within 7 days after completion of excavation in that reach. For distances beyond 50mt. but within 100 mt. from the point of re-excavation to the placing point on the bank. Note-The cost for the above work includes the cost of hire charges of excavator including all accessories, excavators, diesel machine operated boats, pontoons etc. and including the cost for mobilisation, demobilisation, maintenance, cost of fuel and lubricants, wages of operators and labours and all other incidental charges as may be necessary for the above work and the rate also includes the charges of dismantling and re-erection of machine excavator, pontoon etc., if necessary, in the interest of work or for passing of the machines etc.below the bridges. |
| 3 | Earthwork in re-excavation / silt clearance in drainage channel in all kinds of soil including sludge, slush mixed with all sorts of industrial wastes and municipal garbages, polypacks, carcasses, small khatal effluents, night soil etc. by mathor labour as may be necessary and depositing the same in places as directed by the Engineer-in-charge , in such a manner, without causing much hindrance to traffic and posing health hazard and making arrangement to maintain the site in workable condition and rough dressing when dry including making arrangement of bailing out of any seepage water and removal of sand or soil blown from underneath, removal of khatal, temporary latrines, clearing and removing all kinds of semi compact masses formed by water hyacinth, jungles up to 30 cm girth, and burning them to ashes or removing outside Government land in conformity with the Municipal rules, including shoring shuttering as required, nicking out lines etc. (Measurement : Pre-work and Post-work level section. Pre- work section to be taken after removal of water hyacinth and all other floating materials etc.) By manual means within an initial lead of 30 M and an initial lift of 1.5 M |
| 4 | Extra rate for additional lead of earthwork in item No. 3 above.Each additional lead of 15 M or part thereof beyond 30 M up to 90 M |
| 5 | Disposal / carriage of excavated earth / materials outside Government land by truck or by any other conveyance over kancha / pucca road including making access for plying the truck or any other conveyance beyond 300 m and upto a distance of 5.00 Km. from the excavated point including cost of stacking, loading, unloading, transporting, arrangement of land, if required by agency, spreading and levelling as necessary etc. complete. Measurement : By stacks at loading point after deducting voids as per rule. (This item can only be used after obtaining permission from the concerned Superintending Engineer). |
| 6 | Supplying Jhaw / Eucalyptus bullah piles at work site, including dressing and making one end pointed.15 cm av. Diameter |
| 7 | Labour for driving Jhaw / Eucalyptus bullah piles by monkey in all sorts of soil including hoisting and placing piles in position, protecting the pile head with iron ring and cutting and shaping heads before and after driving and including hire and labour for necessary driving appliances and all tackles.15 cm av. Diameter |
| 8 | Supplying, fitting and fixing with iron nails half split bullah wailing pieces and cross pieces etc. complete with cost of all materials and carriage to site.Width of thinner end above 10 cm. and less than 15 cm.Jhaw / Eucalyptus. |
| 9 | Coal tarring with 5% pitch including cost of material and labour complete as per direction of the Engineer-in-charge b) Two coats |
| 10 | Fitting, fixing bitumen drum sheet to bullah piling and wailing pieces including cutting straightening drum sheet fixing with country nails @ 20cm c/c at top & bottom and bolts& nuts at top & bottom at every joint of drum sheet with a laping of 15 cm, including supply of drum sheet, fixture all complete as per direction of the Engineer - in - charge. |
| 11 | Supplying, dressing and stacking at site bamboo pins above 5 c.m. diameter and upto 7.5 cm. diameter. (Dia. to be measured at mid length). |
| 12 | Driving bamboo pins in standing or flowing water including scaffolding and driving appliancesWhere boats are not necessary |
| 13 | Supplying, fitting and fixing with iron nails half split bamboo wailing pieces (av. dia. of bamboo not less than 5.0 cm.) |
| 14 | Taking out old bamboo pins from piling and stacking the same within 150 metre from the site of work.Where boats are not necessary. |
| 15 | Taking out bamboo wailing pieces after removing iron nails and stacking the same within 150 metre from the site of work.Where boats are not necessary |
| 16 | Supplying to site empty cement polythene bags (capacity 50kg) in good condition including stacking, incedental charges etc. all complete (capacity 50 kg). |
| 17 | Labour charges for filling empty cement gunny bag / polythene bag(capacity 50 kg) with all kinds of earth (wet or dry), sand or agreegates(stone / brick) and sewing as done in case of cement bags ,(tying with a knot after filling will not be accepted ) , and stacking within a lead of 30 metre as per direction of Engr-in-charge (cost is excluding the cost of any types of filling materials). NB:- Volume of earth/ sand filled bags should not be less than 0.028 cum/ bag. |
| 18 | Dumping in position earth / sand filled gunny / poly bags (capacity 50 kg) within a lead of 30 metre inclusive of all lifts. |
| 19 | Removing earth/sand filled poly bags/gunny bags from the channel bed/slope and initially depositing the same near channel bank at a place as directed by the Engineer-in Charge for measurement of Bag. & then disposing off the same at a distance not less than 150 metre from the channel site. |
| 20 | Earthwork in excavation in all kinds of soil for making embankments, repairs to the embankment, closing breaches etc. as per profile including supply and transporting the earth by truck or tractor or any other mechanical means on land , including loading, transporting, unloading and stacking with all lifts bothways and head load where necessary and depositing the same on embankments, clannels, filling depressions in requisite profile, levelling as per direction of the Engineer-in-charge within a lead of, NB :- Measurement to be taken on the basis of stack measurement / pre- post work section measurement after deduction of void as per norms. No extra payment will be made for stacking.Beyond 500 metre and upto 1.00 km |
| 21 | Dismantling of existing structures like culverts, bridges, retaining walls and other structure comprising of masonry, cement concrete, steel work, including T&P and scaffolding wherever necessary, sorting the dismantled material, disposal of unserviceable material and stacking the serviceable material with all lifts and lead of 1000 m as per Technical Specifications Clause 202 for Rural Roads of MORD.By Manual MeansCement Concrete |
| 22 | Box cutting or filling in Road embankment in all sorts of soil including spreading the spoils properly over the flank as necessary or on berm to approximate grade & camber and rolling the sub-grade with power roller to proper camber and grade as per direction and satisfaction of Engineer-in-charge including uprooting and removing plants and jungles when and where necessary.Depth up to 150 mm |
| 23 | Sand filling in foundation trenches and at the back of abutments, wing-walls etc. with good local sandfree from earth in layers not exceeding 15 cm. including inundating each layer by profuse water and poking and ramming layer by layer complete including supply of sand. Quality of sand is to be approved by the Engineer-in-charge. |
| 24 | Single Brick Flat Soling of picked jhama bricks including ramming and dressing bed to proper level and filling joints with local sand. |
| 25 | Ordinary Cement concrete (mix 1:1.5:3) with graded stone chips (20 mm nominal size) excluding shuttering and reinforcement if any, in ground floor as per relevant IS codes including cost and carriage of all materials complete. (i) Pakur Variety. |
| 26 | Hire and labour charges for shuttering with centering and necessary staging upto 4m using approved stout props and thick hard wood planks of approved thickness with required bracing for concrete slabs, beams and columns, lintels curved or straight including fitting, fixing and striking out after completion of works (upto roof of ground floor) (When the height of a particular floor is more than 4 m the equivalent floor height shall be taken as 4 m and extra for works beyond the initial 4 m ht. shall be allowed under 36 (e) for every 4 m or part thereof)25 mm to 30 mm shuttering without staging in foundation Please Enable Macros to View BoQ information |