| 1 | Cutting uprooting and clearing jungles including shrubs, water weeds, bushes, trees, plants ,upto 30cm. Girth including removing as directed by Engineer-in-charge. |
| 2 | Earth work in excavation in all kinds of soil for making embankments, repairs to the embankment, closing breaches etc. as per profile including supply and transporting the earth by truck or tractor or any other mechanical means on land, including loading, transporting, unloading and stacking with all lifts both ways and headload where necessary and depositing the same on embankments, clannels, filling depressions in requisite profile, levelling as per direction of the Engineer-in-charge within a lead ofNB :- Measurement to be taken on the basis of stack measurement / pre-post work section measurement after deduction of void as per norms. No extra payment will be made for stacking.B) Beyond 1.00 km and upto 2.00 km |
| 3 | Earth work in excavation of foundation of structures as per drawing and technical specification, including setting out, removing, spreading or stacking of spoils within a lead of 150 m. as directed and including trimming the sides of the trenches, leveling, dressing and ramming the bottom, and backfilling with approved material complete as per direction of the Engineer-in-Charge .I. In all sorts of soil excluding marshy soil & rocks (soft or hard) by manual means.a) upto 3 m depth(iv) Without pumping out water and shoring |
| 4 | Supply of stone / laterite boulder at site including Royalty (Royalty certificate in original from competent authority are to be submitted along with the bill, otherwise amount due towards Royalty of stone/laterite boulder will be deducted from the bills of works) . a) Panchami source (Each weighing 25 kg & above)Carriage from Panchami stone mine to khiraiboni site =142.00KM. |
| 5 | Labour charges for bouIder pitching on top and slope by placing required boulders (each weighing 25 Kg. and above within lead of 100 metres and all lifts) including filling the interstices with fragments as required, preparing sub-grade by cutting or filling the earth on slope upto 7.5 cm. depth, watering and ramming where necessary complete as per direction of the Engineer-in-charge.a) Over Jhama Khoa / metal filter/ Geo-textile filter. |
| 6 | Supplying at site and laying in position UV stabilized polypropylene woven geotextile of 430 gsm as filter, as per specification, including cost of preparing the bed, placing the geotextile as per profile with at least 15cm lapping, wherever required and anchorage at top, sewing / welding the overlapped portion, storage and transportation by all means, complete as per direction of the Engineer-in-charge.Note: 1. Payment to be made on measurement of finished surface without lapping, but including anchoring length at top.2. Payment will be made subject to the result of 3rd Party Testing, to be done by the Engineer-in-charge departmentally. Paragraphs 2.7.7, 2.7.9 and 2.7.10 under the Chapter of “Specification for Works” in the USoR shall be reproduced and included in the tender document as “Specification & Special Terms & Conditions for Geotextile” in case of use of this item in the estimate.3. This particular item is to be used in special cases, either in continuation of previous usage or after offering adequate justification from techno-economical angles. |
| 7 | Providing & fixing Concrete Sign Board as per IRC specification of size 900 x 750 x 37 mm. thick made with RCC 1:1½:3 with pakur variety stone chips reinforced with double layer IRC febric (75 x 75 mm. mesh) and fixed with necessary nuts & bolts on two RC precast posts 100 mm. x 150 mm. of height 2.65 m. of which top 750 mm. is of section 100 x 13 mm. and 1.90 metre above GL & 0.75 metre below GL including digging hole, repacking the same with cement concrete 1:3:6 with jhama khoa or with local stone chips etc. complete including painting two coats on both faces lettering sign marks etc. as per direction of the Engineer-in-Charge. (The rate is inclusive of cost of reinforcement, concrete, shuttering, nuts & bolts, washer etc. complete.) |
| 8 | Supplying Nylon cage netting 1 metre x 1 metre x 1 metre size with knot having mesh size 17.5 cm x 17.5 cm constructed with nylon thread (210 x 24) having tensile strength not less than 250 Kg. / sq. cm. including carriage, delivery and stacking at site inclusive of all taxes complete. |
| 9 | Labour charges for dumping and placing in position properly filled in Nylon crates with filled in HDPE bags (minimum 21 nos.having capacity 50 kg) with local earth or sand, sewing and tying the crate with nylon wire within a lead of 150 m. and all lifts in river slope or bed by cutting trenches upto 50 cms depth, if necessary, or by boat including cost of hire charges of boat, boatmen and other necessary equipments and also including cost of bags, carriage and charge of filling bags with earth / sand but excluding cost of nylon crate as per direction of the Engineer – in – Charge.NB:- Volume of each earth/ sand filled HDPE bags should not be less than 0.0328 m3. Size of Nylon crate is 1metre X 1metre X 1metre.(a) Where boats are not necessary. |
| 10 | Supplying, fitting, fixing end pieces for rectangular / square / circular sausages at the ends, with 10 SWG / 8 SWG G I wire net of different mesh sizes tying & sewing the same maintaning a lap langth of 150 mm all around with 12 SWG G I wire complete, including the cost of supply of wire netting,fitting etc, complete as per direction of the Engineer - in - charge.b). Mesh size 125 mm x 125 mm with 10 SWG wire. |
| 11 | Making rectangular sausage cage with 10 SWG galvanized iron wire of 125mm. x 125mm. mesh wire netting with proper lapping of minimum 150 mm. including sewing the joints with 12 SWG G I wire and supply of all materials and equipments including placing the sausage cage in position, filling the same with boulder or lump agreegates complete asper direction of the Engineer-in-charge but excluding the cost of boulder / lump aggregates and its carriage upto site.(Cost is excluding the cost of end pieces ).d) 0.90 metre x 0.60 metre nominal section |
| 12 | i) 3.00 metre x 0.46 metre nominal section (for apron only) Please Enable Macros to View BoQ information |