| 1 | Chipping the existing wall surface and roughening the floor surface and disposing the debris away from the site as directed by the department Engineer in-charge including cost of all labour charges, lead, lift, etc., complete. |
| 2 | Dadooing the walls with ceramic glazed tiles approved make, colour and quality size of 300x450x8mm over 10mm thick C.M 1:3 bedding and pointing with same coloured cement in for toilet walls including cutting chase in walls wherever required finishing neat, cost of all materials, labour charges, lead, lift, etc., complete. |
| 3 | Providing floor finish with vitrified ceramic anti-skid tiles of approved make, colour, quality and required size and the thickness shall not be less than 6mm over 10mm thick CM1:3 bedding and pointing with same coloured cement in all floors for toilet including cutting chase in walls wherever required, finishing neat, including cost of all materials, labour charges, lead, lift, etc., complete and as directed by the Engineer at site |
| 4 | Supplying, fabricating and placing in position of M.S.Plain Sheeted (18 Gauge) Steel door of required size using M.S.Angle 25x25x5mm for outer frame 35x35x5mm for shutter frame and bracing, shutter with 18 Gauge M.S.Sheet, including hinges, aldrops, cost of all materials, labour charges, transporting, lead, lift, etc., complete. |
| 5 | Plastering in CM 1:5, 12mm thick for surfaces neatly as directed by the Engineer in-charge at site includng cost of all materials, labour charges, lead, lift, etc, complete. |
| 6 | Painting one coat (excluding priming coat) on previously painted steel with Enamel paint including cleaning the surface of all dirt, dust and foreign matter as directed by the Engineer at site including cost of all materials, labour charges, safety appliances, lead, lift, etc., complete. |
| 7 | Painting with one coat of primer and two coats on new steel metal surfaces with enamel paint including cleaning the surface of all dirt, dust and foreign matter as directed by the Engineer at site including cost of all materials, labour charges, safety appliances, lead, lift, etc., complete. |
| 8 | Colour washing two coats of OBD over one coat of primer using white cement for inner and outer surfaces of walls including cost of materials, labour charges, cleaning the surfaces, scaffolding charges, lead, lift, etc., complete as directed by the department engineer at site. |
| 9 | Supplying and fixing thermo cool sheet false ceiling of 25 mm thick with anodized aluminium grid construction consisting of 38x38x2mm anodized aluminium \\"T\\" angle for forming 1000 mm x 500 mm panels at intermediate and 25x25x2mm \\"L\\" angle at corner of the grid mounted into the walls by rawl plugs of approved make providing opening for light if necessary and finishing neatly as per departmental specification including aluinium angle cleats with necessary C.P brass/ stainless steel sunk screws, rawl plugs, RTS 8mm dia rods for supporting the false ceiling, thermocool sheet, aluminium sections, all other required materilas for this work, transport charges, labour charges, lead, lift, etc., complete. (Power supply will be given by department at free of cost) |
| 10 | Supplying and fixing of white colour glazed wash basin of approved make and size of 550mm x 400mm with necessary fixtures such as 1 No. CP Nose pillar cock, waste coupling, 32mm waste hose, 1No.gate valve, 1/2” connecting hose and bottle trap etc., finishing the disturbed masonry neatly including cost of all materials, transporting, all labour, all lead & lift, etc., complete and as directed by the Engineer at site. |
| 11 | Replacing the existing Indian water closet and supplying and fixing in position of new white glazed European water closet of best quality and approved make with 100mm \\"P\\" or \\"S\\" trap with double flapped riigd PVC seat cover with CP brass hinges, etc., as directed by the Engineer at site including all lead, lift etc., complete., |
| 12 | Replacing the existing damaged glasses in the windows with new 4 mm thick plain glass of approved quality as directed by the Engineer at site including cost of glass, glass putty, all labour charges for lifting and fixing in position of Glass panels, disposing the Broken glasses to the nearest Dustbin, all leads, etc., complete. Please Enable Macros to View BoQ information |