| 1 | Earth work in hard soil or gravelly soil within 50m. Initial lead and 1.5m. Initial lift icluding rough dressing and bracking clods to maximum 5cm to 7cm and laying in layers not exceeding 0.3m. in depth and as per the direction of the engineer-in-charge. |
| 2 | Filling in foundation & plinth with sand watered & rammed including cost, conveyance royalty etc., Complete. |
| 3 | C:C: (1:4:8) using 4 cm. size H.G. C.B metal including the cost of all materials, labour carriage, royalty etc complete. |
| 4 | RCC work of M20 Grade with 20 mm sizeand down graded black hard granite chips including cost, conveyance and royalty of all materials, cost of all labour,T&P etc. complete |
| 5 | Rigid and smooth centering and shuttering for CC works including false work and dismentalling then after casting including cost of materials complete in ground floor. A) plinth Band |
| 6 | B) Column and Beam |
| 7 | C) Lintel |
| 8 | D) Chhajja & Roof Slab |
| 9 | Brick work with Flyash bricks 23cm x 11cm x 8cm size having crushing strength not less than 75 Kg/cm2 with dimensional tolerance ±8 percent in cement mortar (1:6) in foundation and plinth. |
| 10 | Brick work with Flyash bricks 23cm x 11cm x 8cm size having crushing strength not less than 75 Kg/cm2 with dimensional tolerance ±8 percent in cement mortar (1:6) in Add for superstructure extra labour for scaffolding |
| 11 | 6 mm. thick C.P (1:4) with all cost, conveyance and royalty etc. all complete. |
| 12 | 12 mm. thick C.P (1:6) with all cost, conveyance and royalty etc. all complete. |
| 13 | 16 mm. thick cement plaster (1:6) over brick or stone masonry. per 1 Sqm |
| 14 | Fixing Vitrified tiles (AGL wooden (Mat Finish) 600x600mm)in floors treads of steps and landing on 25mm thick bed of cement mortar (1:1) jointed with neat cement slurry mixed with pigment to match the shades of the tiles including rubbing and polishing etc. complete. Data for 10 Sqm |
| 15 | Fixing Granite tiles in floors treads of steps and landing on 25mm thick bed of cement mortar (1:1) jointed with neat cement slurry mixed with pigment to match the shades of the tiles including rubbing and polishing etc. complete. Data for 10 Sqm |
| 16 | Priming 1 coat with any appproved Primer (wood) including cost of primer etc. complete |
| 17 | Finishing walls with Weather Coat of approved shade on new work two coat to give an even shade inculding cost of paint. Per 1 Sqm. |
| 18 | Wall painting 2 coats with plastic emulsion paint of approved shade on new work to give an even shade inculding cost of paint (For 10 Sqm.) |
| 19 | UPVC WINDOW |
| 20 | Supplying, fitting and fixing of M.S Iron Door & window etc. all complete. |
| 21 | Supplying, fitting and placing uncoated HYSD bar reinforcement complete as per drawing and technical specification. |
| 22 | Electrification |
| 23 | Fixing of Display Board Please Enable Macros to View BoQ information |