| 1 | Dismantling and removing 2.5 cm thick grading concrete from roof slab cleaning the surface lowering and removing the debris within 50m lead.First Floor |
| 2 | Dismantling and removing 2.5 cm thick A.S Flooring from roof slab cleaning the surface lowering and removing the debris within 50m lead. GROUND FLOOR |
| 3 | First Floor |
| 4 | Clearing and grubbing road land including uprootig rank vegetation,grass,bushes, sapling and trees girth uo to 300mm ,removal of stumps of frees cut earlier and disposal of unserviceabe materils and stacking of serviceable materils to be used or quctioned,up to alead of 1000 maters including removal and disposal of top organic soil not exceeding 150mm in thicknees. of |
| 5 | Filling foundation and plinth with excavated materials etc. complete. |
| 6 | Earth work excavation of foundation in hard or gravelly soil within initial lead of 50m and initial lift of 1.5 m including dressing the sides, leveling the bed and depositing the excavated materials away from the work site, shoring etc if required, complete the item of work in all respect as per direction of the Engineer-in-charge. |
| 7 | Filling foundation and plinth with filling sand laying in layers including ramming, watering, compacting including cost, conveyance and royalty of sand from approved quarry and other taxes if any with all leads, lifts, T&P etc complete the items of work in all respect as per specification and direction of Engineer in charge. |
| 8 | CC (1::3:6) using 40 mm size and down graded crusher broken HG stone metal free from weathered surface of approved quality from approved quarry in foundation and plinth including laying concrete in layers with due compaction, watering and curing including cost, conveyance, royalty and taxes of all materials with all lead, lifts and delifts, T&P etc required for completion of the work in all respect as per direction of the Engineer-in-charge. |
| 9 | Cement concrete of proportion (1:2:4) using 12mm size hard granite chips of approved quality from approved quarry including hoisting, lowering and laying concrete and compacting in layers not exceeding 15cm thick with proper packing and ramming each layer of concrete by means of vibrator including watering and curing etc.complete including cost, conveyance, royalty taxes of all the materials required for the work with all labour, T&P and cess etc. complete in all respect as per specification and direction of the Engineer-in-charge. |
| 10 | R.R.H.G Stone Masonary in C.M (I:6) in F&P including cost, conveyance, royalty, taxes of all materials, labour, T&P required for the work complete and as per the direction of the Engineer-in-charge. |
| 11 | Flyash brick masonry in cement mortar (1:6) in super structure using Flyash bricks of 23x11x8cm size having a crushing strength of not less than 75 kg./sq.cm including splays cutting, circular moulding, chamfering and cur belling, watering and curing etc. complete including cost, conveyance, royalty, taxes of all the materials required for the work with all labour, T&P and cess etc. complete in all respect as per specification and direction of the Engineer-in-charge.GROUND FLOOR |
| 12 | RCC work of M-20 grade with 20 mm and down grade black hard granite chips including cost, conveyance, royalty and all taxes of all materials with all leads, lifts, T&P etc including rigid and smooth centering, shuttering and dismantling the same after the curing of RCC work for 28 days complete the item of work in all respect as per specification and direction of Engineer-in-charge.GROUND FLOOR Column base & Footing |
| 13 | Plinth Bend |
| 14 | Column & Beam |
| 15 | Labour charges for straightening coiled or bent up MS rods including cutting, bending and welding if required and tying the grills, laying and placing in proper position as per design including cost, conveyance,taxes etc of tested MS/TS rod with testing data of required specification & cost of binding wires of 18 to 20 gauge, labour, T&P required for the work complete and as per the specification and direction of the Engineer-in-charge.GROUND FLOOR |
| 16 | Providing 4cm thick grading concrete in C.C. (1:2:2) laid in proper slope over terrace roof slab by using two part of sand, one part of cement and two parts of 6mm size black First Floor |
| 17 | 20mm Thick C.P in C.M (1:6) over stone massonaryafter racking out joints including watering curing to required period including cost conveyance, royalty of all materials, T&P complete etc. as per specification and direction of Engineer in charge. |
| 18 | 12mm thick cement plaster (1:6) in cement mortar finished smooth surface on brick wall after racking out joints including watering curing to required period including cost conveyance, royalty of all materials, T&P complete etc. as per specification and direction of Engineer in charge.Ground floor |
| 19 | 12 mm cp 1:6 with neat punning |
| 20 | Providing fitting and fixing of mosquito net with UPVC frame to door and window with all complete work. (As per Market Rate) GROUND FLOOR & FIRST FLOOR |
| 21 | Fixing Vetrified tiles in dado, skirting & riser of steps on 12mm thick cement plaster (1:3) joined with neat cement slurry mixed with pigment to match the shade of the tiles including rubbing and polishing etc. complete.GROUND FLOOR |
| 22 | FIRST FLOOR |
| 23 | Fixing Vetrified tiles in floors, treads on steps and landing on 20mm thick bed of cement mortar 1:4 (1 cement: 4 sand) joined with neat cement slurry mixed with pigment to match the shade of the tiles including rubbing and polishing etc. complete.GROUND FLOOR |
| 24 | FIRST FLOOR |
| 25 | Weather coating two coats to wall with approved shade over one coat of Wall primer on new work to give on even shade including cost of Weather coat per 1 sqm .GROUND FLOOR Please Enable Macros to View BoQ information |