|
| 1 | Earth work excavation of foundation in hard or gravelly soil within initial lead of 50m and initial lift of 1.5 m including dressing the sides, leveling the bed and depositing the excavated materials away from the work site, shoring etc if required, complete the item of work in all respect as per direction of the Engineer-in-charge. |
| 2 | CC (1:4:8) using 40 mm size and down graded crusher broken HG stone metal free from weathered surface of approved quality from approved quarry in foundation and plinth including laying concrete in layers with due compaction, watering and curing including cost, conveyance, royalty and taxes of all materials with all lead, lifts and delifts, T&P etc required for completion of the work in all respect as per direction of the Engineer-in-charge. |
| 3 | Fly Ash Brick work in CM (1:6)) in Super Structre with cost,convayance etc complete. |
| 4 | 16 mm thick C.P in C.M (1:6) over brick work with cost,convayance & royalty etc complete. |
| 5 | RCC work of M-20 grade with 20 mm and down grade black hard granite chips including cost, conveyance, royalty and all taxes of all materials with all leads, lifts, T&P etc including rigid and smooth centering, shuttering and dismantling the same after the curing of RCC work for 28 days complete the item of work in all respect as per specification and direction of Engineer-in-charge GROUND FLOOR Plinth Bend |
| 6 | Roof Slab |
| 7 | Labour charges for straightening coiled or bent up MS rods including cutting, bending and welding if required and tying the grills, laying and placing in proper position as per design including cost, conveyance,taxes etc of tested MS/TS rod with testing data of required specification & cost of binding wires of 18 to 20 gauge, labour, T&P required for the work complete and as per the specification and direction of the Engineer-in-charge.GROUND FLOOR |
| 8 | Distempering two coats to wall with distemper GROUND FLOOR |
| 9 | FIRST FLOOR |
| 10 | Wall painting two coats with weather coat paint with one coat of primer. GROUND FLOOR |
| 11 | FIRST FLOOR |
| 12 | Painting two coats of synthetic enamel paint over a coat of primer of approved quality, brand and shade including smoothening the surface by sand paper and filler etc complete with cost, conveyance, royalty, taxes of all materials, labours T&P required as per specification and direction of Engineer-in-charge.GROUND FLOOR |
| 13 | FIRST FLOOR |
| 14 | Providing fitting and fixing of mosquito net with UPVC frame to door and window with all complete work. (As per Market Rate) Please Enable Macros to View BoQ information |