| 1 | Earth work excavation of foundation in hard or gravelly soil within initial lead of 50m and initial lift of 1.5 m including dressing the sides, leveling the bed and depositing the excavated materials away from the work site, shoring etc if required, complete the item of work in all respect as per direction of the Engineer-in-charge. |
| 2 | Filling foundation and plinth with filling sand laying in layers including ramming, watering, compacting including cost, conveyance and royalty of sand from approved quarry and other taxes if any with all leads, lifts, T&P etc complete the items of work in all respect as per specification and direction of Engineer in charge. |
| 3 | CC (1:4:8) using 40 mm size and down graded crusher broken HG stone metal free from weathered surface of approved quality from approved quarry in foundation and plinth including laying concrete in layers with due compaction, watering and curing including cost, conveyance, royalty and taxes of all materials with all lead, lifts and delifts, T&P etc required for completion of the work in all respect as per direction of the Engineer-in-charge. |
| 4 | C.C (1:2:4) with 12mm size h.g chips including all taxes & royality conveyance etc |
| 5 | Fly Ash Brick Masonary in C.M (I:6) in F&P including cost, conveyance, royalty, taxes of all materials, labour, T&P required for the work complete and as per the direction of the Engineer-in-charge. |
| 6 | Fly Ash Brick work in CM (1:6) in Super Structre with cost,convay etc. complete and as per the direction of the Engineer-in-charge. |
| 7 | RCC work of M-20 grade with 20 mm and down grade black hard granite chips including cost, conveyance, royalty and all taxes of all materials with all leads, lifts, T&P etc including rigid and smooth centering, shuttering and dismantling the same after the curing of RCC work for 28 days complete the item of work in all respect as per specification and direction of Engineer-in-charge Column base & Footing |
| 8 | Plinth Bend |
| 9 | Column & Beam |
| 10 | Roof Slab |
| 11 | Labour charges for straightening coiled or bent up MS rods including cutting, bending and welding if required and tying the grills, laying and placing in proper position as per design including cost, conveyance,taxes etc of tested MS/TS rod with testing data of required specification & cost of binding wires of 18 to 20 gauge, labour, T&P required for the work complete and as per the specification and direction of the Engineer-in-charge. |
| 12 | 16mm thick cement plaster (1:6) in cement mortar finished smooth surface on brick wall after racking out joints including watering curing to required period including cost conveyance, royalty of all materials, T&P complete etc. as per specification and direction of Engineer in charge. |
| 13 | 12mm thick cement plaster (1:6) in cement mortar finished smooth surface on brick wall after racking out joints including watering curing to required period including cost conveyance, royalty of all materials, T&P complete etc. as per specification and direction of Engineer in charge. |
| 14 | Fixing Vetrified Tile in floors, trade or steps & landing on 25 mm thick cement plaster (1:1) jointed with neat cement slurry mixed with pigments to match the shade of the tiles rubing and polishing etc. complete. |
| 15 | Fixing Vetrified Tile tile in dados skirting & riser of steps on 12 mm thick cement plaster (1:3) jointed with neat cement slurry mixed with pigments to match the shade of the tiles rubing and polishing etc. complete. |
| 16 | Weather coating two coats to wall with approved shade over one coat of Wall primer on new work to give on even shade including cost of Weather coat per 1 sqm . |
| 17 | Distempering two coats to wall with distemper |
| 18 | Providing F & F of Mosquito net Veka/UPVC Frame to Door,window,grill,& Ventilation etc with all complete work ( As per local Market ) Please Enable Macros to View BoQ information |