| 1 | Earthwork in Excavation of foundation in ordinary soil including all lift & lead and including back filling, watering and ramming excavated earth into the trenches or into the space between the structure and the side of foundation trenches with removal and disposal of surplus earth as direction of engineer-in-charge from the foundation trenches including cost of labour, all T & P, leads and lift etc. |
| 2 | Providing and Laying A40M-10 (C.C.1:3:6) cement concrete including cost of all materials, labour T & P, all lifts and leads etc. complete. |
| 3 | Providing and Laying first class M-150 brick work in 1:4 Cement Mortar including cost of all materials, labour T & P, all lifts and leads etc. for proper completion of work. |
| 4 | Providing and Laying R.C.C. M-20 (1:1:5:3) cement concrete including cost of all materials,, labour, T&P, all lifts and leads etc. complete. |
| 5 | Providing and fixing steel reinforcement including cost of steel, binding wire, bending, binding, welding, cutting, placing in proper position, all lifts and leads, all labour and T&P etc. |
| 6 | Providing and fixing Centering & shuttering for R.C.C. works (form work of concrete) including cost of all material, labour, T&P, all lifts and leads, etc for proper completion of work. |
| 7 | Providing and fixing Centering & shuttering for C.C. works (form work of concrete) including cost of all material, labour, T&P, all lifts and leads, etc for proper completion of work. |
| 8 | providing and Laying 12 mm Thick Plaster in 1:4 Cement mortor including cost of all material, labour, T&P, Curing etc complete for proper completion of work |
| 9 | Providing and Laying brick khadanja using M-150 brick including making subgrade, alingment and filling joints by local sand including all lift and leads with cost of all material labour and T&P all lift and leads etc, complete as per direction of Engineer-in-Charge |
| 10 | Providing and Laying 1200 mm dia C.C. pipe including all lift and leads with cost of All materials, Labour, T&P etc. required for Proper completed of work. |
| 11 | Earth work in Filling in embankment in ordinary soil including ramming and dressing the surface to be required levels and slopes and also including all lift and Lead upto 1 km distance including cost of all Labour T&P etc complete as directed by Engineer-in- charge. Please Enable Macros to View BoQ information |