|
| 1 | Dismantling and chipping the floor finish and dadooring in cement mortar with glazed tiles |
| 2 | DADOOING THE WALLSwith colour glazed TILES of approved quality of size 300 x 450 x6 mm laid in cement mortor 1:2 ( one cement and two sand ) and pointing with white cement neatly to full depth of tiles in all floors as directed by the departmental officers and complying with standard specification . |
| 3 | FLOORING with scratch proof CERAMIC TILES of approved quality and colour of size 305 x 305 x6 mm in all floors over 20 mm thick cement mortar 1:3 ( One cement and three sand ) base above the existing bed concrete and pointing with same colour cement etc., complete complying with standard specification |
| 4 | Plastering in cement mortar 1:5 (one cement and Five M.sand)12mm thick in all floors and curing Neat finishing etc complete complying with standard specification etc,. Complete |
| 5 | Supplying and fixing soild PVC door Shutter using 19 gauge 19 mm MS Square tubes for styles and outer frames. 15 mm MS square tubes for top , lock and bottom rails . The Steel tubes shall be covered with 5 mm Thick solid pvc sheets . Shutter using 5mm Thick solid PVC Sheet for panelling shall rigidly fixed in position including necessary furniture and fittings. The Over all size of styles shall be 50 mm x 30mm . The over all size of top rail , lock rail and bottom rail shall be 75 mm x30 mm . The Over all size of frames shall be 50 mm x 45 mm with suitable rabate for housing the shutter |
| 6 | Supplying and fixing in position COLOUR glazede EUROPEAN WATER CLOSET with 'p' Trap and double flapped seat cover , 12.50 liters capacity P.V.C .low level FLUSHING TANK including all internal fittings fixed on C.I.brackets, 12 mm PVC or brass nipple , chromium plated brown headed stopcock ,12 mm nylon connection with necessary teakwood plugs, clamps, screws to the portion coming with walls and floors, including dismantling masonry and redoing the same to the original condition |
| 7 | Renewing supplying and fixing in position best white glazed earthen ware ORIYA TYPE INDIAN WATER CLOSET of approved quality of size 584 mm with 'p' or 's' trap and embedding the closet with trap to shape in position with 40 mm bricks jelly concrete 1:2:5 ( One lime ,Two Sand and Five brick jelly ) and finishing the top[ to the required slope and including giving connection to the C.I Soil stracks by dismantling the masonry floor or RCC works and redoing the same to the original condition without anyleakage etc., complete as directed by the deparmendal officers .( The water closet should be got approved by the executive engineer before use on work ) |
| 8 | Lipped mouth porcelain flat back uirnal with all accessories such as 32 mm dia bell mouth PVC connection ,15 mm dia GM Wheel valve ,15 mm dia 'B' Class GI Waste water pipe ,15 mm Dia nylon connection ,15 mm dia brass nipple etc. |
| 9 | Supplying PAINTING TWO Coats in the best approved first quality of plastic emelsion paint in the wall over one primery coat of wall primer including cost of paint and other materials, brushes, scaffolding charges etc.,including clearing the existing surface by manual labour etc.,complete complying as directed by the departmental officers as per standard spefication. |
| 10 | Dismantling ,clearing away and carefully stacking materials useful for re- use for any thckness of wall AC Sheet roofing without roof timbers (P28) W-0025 |
| 11 | Roofing and side cladding with Galvalum sheet 0.47mm thick(pre painted Al-ZN alloy coated steel sheet) including cost of all materials fixed earth self drilling 55mmand 25mm screw SD/ST every crest portion (overlapping and bottom full 55mm screws remaning area alternatively) as directed by the deparmental officers etc complete.(over lapping must be 150mm) |
| 12 | FLOORING with Double charged nano VERTIFIED TILES of approved quality and colour of size 600x600x8 mm in all floors over 20mm thick cement mortar 1:3 (one cement and three sand) base above the existing bed concrete and pointing with same colour cement added with colouring pigments complete complying with standard specification. |
| 13 | Providing UPVC (Un-Plasticized Polyvinyl Chloride) Door: Providing and fixing casement doors fabricated from un-plasticized polyvinyl chloride (UPVC) sections. Profiles: The profiles should be three chamber system which provides high insulation properties with outer frame 60mmx55mm with an outer wall thickness of 2.4mm. The window unit should be designed with all cirner hoints mitred and fusion welded. Windows should be steel reinforced with 25x24x25mm steel reinforcemnet with a thickness of 1mm to have dimensional stability. The sash should be of 60x74mm. The profiles should have co-extruded seals. Hardware: all the hardware like friction stays, handles should be screwed with self tapping screws. The handles, locks should be designed so that they cannot be released from outside. Glazing: The window system should be glazed with 5mm plain float glass/6mm bison lam. Installation: The profiles should be cut to length and welded 45 degrees. The window should be designed such that the water drainage does not pass through the reinforcement chamber. The window system should be fixed directly tot he plastered brick wall using self expanding nylon plug and driving MS electroplated screws into plug. |
| 14 | Supplying and fixing UPVC windows and casement type (open) from the profile the size of outer frame 60mm x 58mm and the shutter profile are reinforcement with GI /1mm 125GSM and 100% corrosion free, the profiles are multi chambered section wall thick of 2mm. The EPDM rubber (Black colour) covered with over all the edges of frames and shutter the shutter will be provided with ESpag multi unit power locks also operate it as handle. The corners and joints should be welded and cleaned. Radiation free pin headed plain or brown colour glass 4mm thick should be provided to the shutter and it should not allow laekage of water even atmost ranging stroms and should has key lockable action , security protective hinges, strong locking system and as per size for arresting noise and energy loss. The connecting mechanism betwenn sash and outer frame that enables the opening of the windows. The windows should be fixed to the wall with 100% packing with screw and silicon packing all round the frames. The windows should be got approved from the executive engineer before use on work. Please Enable Macros to View BoQ information |