| 1 | Earth work excavation of foundation in hard or gravelly soil within initial lead of 50m and initial lift of 1.5 m including dressing the sides, leveling the bed and depositing the excavated materials away from the work site, shoring etc if required, complete the item of work in all respect as per direction of the Engineer-in-charge. |
| 2 | Filling foundation and plinth with filling sand laying in layers including ramming, watering, compacting including cost, conveyance and royalty of sand from approved quarry and other taxes if any with all leads, lifts, T&P etc complete the items of work in all respect as per specification and direction of Engineer in charge. |
| 3 | CC (1:3:6) using 40 mm size and down graded crusher broken HG stone metal free from weathered surface of approved quality from approved quarry in foundation and plinth including laying concrete in layers with due compaction, watering and curing including cost, conveyance, royalty and taxes of all materials with all lead, lifts and delifts, T&P etc required for completion of the work in all respect as per direction of the Engineer-in-charge. |
| 4 | R.R.H.G Stone Masonary in C.M (I:6) in F&P including cost, conveyance, royalty, taxes of all materials, labour, T&P required for the work complete and as per the direction of the Engineer-in-charge. |
| 5 | W.B.C.B brick massnary in C.M. (1:6) in Super Structre with cost,convay & royalty etc. complete and as per the direction of the Engineer-in-charge.GROUND FLOOR |
| 6 | FIRST FLOOR |
| 7 | RCC work of M-20 grade with 20 mm and down grade black hard granite chips including cost, conveyance, royalty and all taxes of all materials with all leads, lifts, T&P etc including rigid and smooth centering, shuttering and dismantling the same after the curing of RCC work for 28 days complete the item of work in all respect as per specification and direction of Engineer-in-charge.GROUND FLOOR Column base & Footing |
| 8 | Plinth Bend |
| 9 | Column & Beam |
| 10 | Lintel Bend |
| 11 | Chhaja |
| 12 | Roof Slab |
| 13 | Stair case excluding landing slab |
| 14 | FIRST FLOOR Column & Beam |
| 15 | Lintel Bend |
| 16 | Chhaja |
| 17 | Roof Slab |
| 18 | Stair case excluding landing slab |
| 19 | Labour charges for straightening coiled or bent up MS rods including cutting, bending and welding if required and tying the grills, laying and placing in proper position as per design including cost, conveyance,taxes etc of tested MS/TS rod with testing data of required specification & cost of binding wires of 18 to 20 gauge, labour, T&P required for the work complete and as per the specification and direction of the Engineer-in-Rcharge.GROUND FLOOR |
| 20 | FIRST FLOOR |
| 21 | Providing 25mm thick grading concrete in C.C. (1:2:2) laid in proper slope over terrace roof slab by using two part of sand, one part of cement and two parts of 6mm size black FIRST FLOOR |
| 22 | 20 mm thick C.P. in CM (1:6) over Stone masonary including cost, conveyance, royalty, taxes of all materials & complete work. |
| 23 | 16mm thick cement plaster (1:6) in cement mortar finished smooth surface on brick wall after racking out joints including watering curing to required period including cost conveyance, royalty of all materials, T&P complete etc. as per specification and direction of Engineer in charge.GROUND FLOOR |
| 24 | FIRST FLOOR |
| 25 | 12mm thick cement plaster (1:6) in cement mortar finished smooth surface on brick wall after racking out joints including watering curing to required period including cost conveyance, royalty of all materials, T&P complete etc. as per specification and direction of Engineer in charge.GROUND FLOOR |
| 26 | FIRST FLOOR |
| 27 | 6mm thick C.P. in CM (1:4) to RCC surfaces finished smooth including closed deep chiping and slurry treatment with cost, conveyance, royalty, taxes of all materials & complete work. GROUND FLOOR |
| 28 | FIRST FLOOR |
| 29 | Fixing Vetrified tiles in dado, skirting & riser of steps on 12mm thick cement plaster (1:3) joined with neat cement slurry mixed with pigment to match the shade of the tiles including rubbing and polishing etc. complete.GROUND FLOOR |
| 30 | FIRST FLOOR |
| 31 | Fixing Vetrified tiles in floors, treads on steps and landing on 20mm thick bed of cement mortar 1:4 (1 cement: 4 sand) joined with neat cement slurry mixed with pigment to match the shade of the tiles including rubbing and polishing etc. complete.GROUND FLOOR |
| 32 | FIRST FLOOR |
| 33 | Fixing glazed tiles in floors, treads on steps and landing on 25mm thick bed of cement mortar 1:1 (1 cement: 1 sand) joined with neat cement slurry mixed with pigment to match the shade of the tiles including rubbing and polishing, cost, conveyance, royalty, taxes of all materials, labour, T&P required for the work complete and as per the direction of the Engineer-in-charge.GROUND FLOOR |
| 34 | FIRST FLOOR |
| 35 | Fixing glazed tiles in dado, skirting and risers of steps on 12mm thick cement plaster (1:3) joint with neat cement slurry mixed with pigment to match the shade of the tiles including cost, conveyance, royalty, taxes of all materials, labour, T&P required for the work complete and as per the direction of the Engineer-in-charge.GROUND FLOOR |
| 36 | FIRST FLOOR |
| 37 | Weather coating two coats to wall with approved shade over one coat of Wall primer on new work to give on even shade including cost of Weather coat per 1 sqm .GROUND FLOOR |
| 38 | FIRST FLOOR |
| 39 | Distempering two coats to wall with distemper of approved shade on new work. GROUND FLOOR |
| 40 | FIRST FLOOR |
| 41 | Supplying of MS grill gate, MS angle chowkhat of approved specification for doors and windows welded with MS sheet shutters of 18 to 20 gauge thick, openable and electrically welded with all necessary fittings including cost of all materials, labour, T&P, transportation to worksite etc all complete in all respect. |
| 42 | Labour for fitting and fixing of MS doors and windows, MS grill gate as per approved design & all complete. |
| 43 | Painting two coats of synthetic enamel paint over a coat of primer of approved quality, brand and shade including smoothening the surface by sand paper and filler etc complete with cost, conveyance, royalty, taxes of all materials, labours T&P required as per specification and direction of Engineer-in-charge.GROUND FLOOR |
| 44 | FIRST FLOOR Please Enable Macros to View BoQ information |