| 1 | Removal of slit/soil/earth, sand, pebbles, 'Malba', debris, rubbish, stone pebbles & obstruction deposited in canal bed up to design line grade and sections having design due to erosion/scour/slips in canal banks/silting with or without bushes and weeds etc. in dry or moist condition from canal bed including dewatering, loading unloading and disposal at suitable place as directed by Engineer in charge with initial lead of 50m. and lift upto 1.5 m with proper dressing on canal bed complete in all respect for depth above 30 cm |
| 2 | Earth work in rough (borrow area) excavation for embankments in hard soil, morrum or highly weathered strata dry or moist, including laying in 20 cm layers (before compaction) and breaking of clods, sorting of grass, pebbles etc. and dressing when compacted by vibro compactor, vibro sheep foot roller, sheep foot roller/pneumatic tyred roller to obtain dry density of at least 98% of Standard Proctor's density with initial lift of 1.5m (Excluding charges for compaction and watering) including loading and un-loading wherever required complete in all respect.Deduction in item no 16 (a) to (d) above if standard proctor density to achive at least 90%With lead beyond 250 m and up to 750 m (½ Km) |
| 3 | Repairs of raincuts, gullies etc. on bunds embankments, canals and other petty works. |
| 4 | Watering of earth including cost of carriage of water when source of water is up to 1 Km |
| 5 | Compaction of earth or highly weathered strataBy manually or plain roller (density 90% of proctor) |
| 6 | Random rubble stone masonry(using R.R. stones where 75% stones should not be less than 15cm in size in any direction and weighing not less than 23kg.) for superstructure including curing all leads of all construction materials including curing etc. complete in cement sand mortar 1:6 |
| 7 | Plaster in cement, sand mortar ( 1:3) including racking of joints, smooth finishing and curing etc. complete including all leads of all construction materials of thickness 20 mm. |
| 8 | Cutting & clearance of jungle, bushes, shrubs Ankra/Ipomoea, Juliflora typna etc. on canal and bunds in dry/moist/slushy conditions including disposal as per instructions of the Engineer-in-charge. Cost of wood has been deducted from rates and thus will be property of contractor after cutting.(b)Thick |
| 9 | Painting standard type gauge with black, red and white un-washable paints including cost of material |
| 10 | Oiling, Greasing work of gate parts like Headstock, Headstock parts, Roller Assembly, Operating Rod, Sealing Frame, Guide Tee with all Labor tools and tackles etc. and Material for vertical lift sliding type/ fix wheel gates excluding cardium compund and gear oil For gates size up to 1.0 m x 1.0m |
| 11 | Oiling, Greasing work of gate parts like Headstock, Headstock parts, Roller Assembly, Operating Rod, Sealing Frame, Guide Tee with all Labor tools and tackles etc. and Material for vertical lift sliding type/ fix wheel gates excluding cardium compund and gear oil For gates size above 1 sqm to 10 sqm |
| 12 | Oiling, greasing work of crest radial gates, Vertical gates and Intake Services well Gates of Dam including all charges of wire rop mwith petrol / diesel and applied cardium compound to wire ropes, oiling and geasing etc complete as per direction of Engineer in charge Rate as per WRD BSR 2026 ch.-12 Page 49 Item no 37 |
| 13 | Providing, Fabrication, machining with straightening work of Guide Tee, Track, Sealing frame, Leaf frame or any part of gate's, complete as per drawing with testing, including cost of all materials, with machinery, labour, tools and tackles cutting, aligning, welding, finishing, cleaning etc., applying one coat of zinc rich epoxy primer and two coats of cold applied coal tar epoxy paint, etc., complete as per specifications and approved drawings with all lead and lifts, including packing & forwarding, transportation charges for structural steel components and other materials. (a) Rate of work with all materials |
| 14 | General maintenance of Diesel Genrator set.( Only for labour charges) |
| 15 | Beldar/Woman Coolie / Chowkidar /Water man / Earth- dresser |
| 16 | Hydraulic excavator/ loader likeJCB/Poclain, Hitachi etc. with all accessories (for actual site working, idle period) having bucket capacity upto 0.40 cum |
| 17 | Hire charges without diesel but with operational staff, M oil, spares, lubricants Tractor upto - 40 H.P. |
| 18 | Tractor trolly two wheeler without hydraulic lift above 2 cum capacity (without staff) |
| 19 | Inspection Vehicles with driver such as Car/Jeep/Bolero or equivalent Model not older than 3 years (Two wheel drive(a) Model not older then 2 years |
| 20 | Supply for diesel at site etc complete Please Enable Macros to View BoQ information |