| 1 | Oiling, Greasing work of gate parts like Headstock, Headstock parts, Roller Assembly, Operating Rod, Sealing Frame, Guide Tee with all Labor tools and tackles etc. and Material for vertical lift sliding type/ fix wheel gates excluding cardium compund andFor gates size up to 1.0 m x 1.0m |
| 2 | Cutting & clearance of jungle, bushes, shrubs Ankra/Ipomoea, Juliflora typna etc. on canal and bunds in dry/moist/slushy conditions including disposal as per instructions of the Engineer-in-charge. Cost of wood has been deducted from rates and thus will be property of contractor after cutting.Thick |
| 3 | Earth work in rough (borrow area) excavation for embankments in hard soil, morrum or highly weathered strata dry or moist, including laying in 20 cm layers (before compaction) and breaking of clods, sorting of grass, pebbles etc. and dressing when compacted by vibro compactor, vibro sheep foot roller, sheep foot roller/pneumatic tyred roller to obtain dry density of at least 98% of Standard Proctor's density with initial lift of 1.5m (Excluding charges for compaction and watering) including loading and un-loading wherever required complete in all respect.With lead beyond 250 m and up to 750 m (½ Km) |
| 4 | Repairs of raincuts, gullies etc. on bunds embankments, canals and other petty works. |
| 5 | Watering of earth including cost of carriage of water when source of water is up to 1 km |
| 6 | compaction of earth or highly weathered strata by manuallu or plain roller (density 90% of proctor) |
| 7 | Providing, Fabrication, machining with straightening work of Guide Tee, Track, Sealing frame, Leaf frame or any part of gate's, complete as per drawing with testing, including cost of all materials, with machinery, labour, tools and tackles cutting, aligning, welding, finishing, cleaning etc., applying one coat of zinc rich epoxy primer and two coats of cold applied coal tar epoxy paint, etc., complete as per specifications and approved drawings with all lead and lifts, including packing & forwarding, transportation charges for structural steel components and other materials. A Rate of work with all materialsRate of work with all materials |
| 8 | Side shuttering including propping etc. complete (to achieve finish F2 forRetaining wall, counterfort, abutment, wingwall supstream or down-stream slope facings of dams and open faces of construction joints etc. |
| 9 | providing and laying in position of Cement concrete nominal mix (1:1.5:3) including leads of all construction materials, curing compaction and finishing with rendering in cement sand mortar 1:3 (1 cement :3 course sand )and making good the joints excluding the cost of centering , shuttering and reinforcement .well graded Crusher broken stone aggregate of maximum size upto 20mm. Please Enable Macros to View BoQ information |