| 1 | Earthwork in excavation by mechanical means (Hydraulic excavator) / manual means in foundation trenches or drains (not exceeding 1.5m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, for all lift, including getting out the excavated soil and disposal of surplus excavated soil as per direction of Engineer-in-charge, within a lead of 50m - all kinds of soil |
| 2 | Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - all work upto plith level - 1:4:8 (1 cement : 4 fine aggregate : 8 graded stone aggregate 40mm nominal size) |
| 3 | Centring and shuttering including strutting , propping etc. and removal of form work for - retaining walls, return walls, walls (any thickness) including attached pilasters, buttresses, plinth and string courses fillets, kerbs and steps etc. |
| 4 | Providing and laying cement concrete in retaining walls, return walls, walls (any thickness) including attached pilasters, columns, piers, abutments, pillars, posts, struts, buttresses, string or lacing courses, parapets, coping,bed blocks, anchor blocks, plain window sills, fillets, sunken floor etc. upto floor five level, excluding the cost of centering ,shuttering and finishing - 1:3:6 (1 cement : 3 fine aggregate : 6 graded stone aggregate 20mm nominal size) |
| 5 | 12mm cement plaster of mix -1:4 ( 1 cement : 4 fine aggregate) |
| 6 | Pointing and laying of precast cement concrete blocks for revetment of size 0.30x0.30x0.15m in cement concrete |
| 7 | Pointing on stone work with cement mortar 1:3 (1 cement : 3 fine aggregate) - flush/ruled pointing |
| 8 | Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundations etc. in layers not exceeding 20cm in depth, consolidating each deposited layer by ramming and watering, lead upto 50m and all lift |
| 9 | Clearing and cleaning of jungle and bushes on the inspection track at Kaliyankatti on LB of Vanjiyar river at Kalaingar nagar in Nedungadu commune by using JCB machine. The rate includes of hire charges of JCB machine, tools and plants, labour, fuel and operation charges etc., complete as checked by the Engineer-in-charge Please Enable Macros to View BoQ information |