| 1 | Please enter GST in Percentage on Total amount of BoQ2 (Part A: Manpower Related Service [Wage Component]) |
| 2 | Please enter GST in Percentage on Total amount of BoQ3 (Part B: Comprehensive Maintenance Services) |
| 3 | Part A: Manpower Related Services (Wage Component) |
| 4 | Providing services for cleaning & repair of Facade of Jubilee Tower and Info-Hub Building which include the deployment of 02 nos of resources (01 Engineer & 01 Supervisor) Highly Skilled category as per SCC and SOW and direction of EIC. (THIS ITEM IS NOT TO BE QUOTED BY BIDDER) |
| 5 | Providing services for cleaning & repair of Facade of Jubilee Tower and Info-Hub Building which include the deployment of 04 nos of resources (4 Operators) Skilled category as per SCC and SOW and direction of EIC. (THIS ITEM IS NOT TO BE QUOTED BY BIDDER) |
| 6 | Providing services for cleaning & repair of Facade of Jubilee Tower and Info-Hub Building which include the deployment of 04 nos of resources (4 Cleaners) Semi-Skilled category as per SCC and SOW and direction of EIC. (THIS ITEM IS NOT TO BE QUOTED BY BIDDER) |
| 7 | Provision for Bonus @8.33% of basic wages to the contract workers paid by contractor and will be reimburshed to the contractor on submission of copy of proof of disburshment. (THIS ITEM IS NOT TO BE QUOTED BY BIDDER) |
| 8 | Provision for EC Policy + Floater Medical Policy (of Rs 3 Lakhs covering along self, Spouse & 2 dependent children) (Rates as per budgetary quotation) where ESIC is not applicable (1 Highly skilled and 6 Skilled Person). (THIS ITEM IS NOT TO BE QUOTED BY BIDDER) |
| 9 | Provision for reimbursement of Leave Wages @ 4.81% as per factory ACT / Rules to the contract workers paid by contractor and will be reimburshed to the contractor on submission of copy of proof of disburshment. (THIS ITEM IS NOT TO BE QUOTED BY BIDDER) |
| 10 | Safety kit & liveries (Rs 4000 per set per person) 2 set per year. The same shall be reimburshed to the contractor on distribution of safety kit & liveries (2 pairs of shirt, trousers, socks & one pair of safety shoes per year as per safety norms of GAIL. After submission of bill.(THIS ITEM IS NOT TO BE QUOTED BY BIDDER) |
| 11 | Premium for PMSBY (Pradhan Mantri Suraksha Bima Yojana) @ Rs. 20 per person per year. (THIS ITEM IS NOT TO BE QUOTED BY BIDDER) |
| 12 | Premium for PMJJBY (Pradhan Mantri Jeevan Jyoti Bima Yojana) @Rs. 436 per person per year. (THIS ITEM IS NOT TO BE QUOTED BY BIDDER) |
| 13 | Provision for premium for Group Personal Accident Insurance Policy with a coverage of 5 Lakhs (for Death/Permanent Disability + partial disability). (THIS ITEM IS NOT TO BE QUOTED BY BIDDER) |
| 14 | In addition to above components, Provision for Death Gratuity as per prevalent regulations, to the resource deployed by the Contractor and payable only in case of death/permanent disablement shall be paid extra at actuals when become due against documentary evidence, during currency of the contract. (THIS ITEM IS NOT TO BE QUOTED BY BIDDER) |
| 15 | In addition to above components, Provision for revision of minimum wages including components(PF, ESI) as per applicable Minimum Wages Notification shall be paid extra at actuals when become due against documentary evidence during currency of the contract. (THIS ITEM IS NOT TO BE QUOTED BY BIDDER) |
| 16 | Part B: Comprehensive Maintenance Services |
| 17 | Providing services for Facade cleaning including Repair and Maintenance work of Façade for GAIL Jubilee Tower, GAIL Info-hub Building, Security Room/Cabins at Entry and Exit Gates, Electrical Panel Room, Glass Canopy etc, through cleaning including Repair and deployment of Resources inclusive of all Cleaning Agents, Consumables, Spares, Tools and Tackles etc. (Indecative list of chemicals/cleaning agents as per SOW clause no. 2.3 (a) & (b)) as per SCC, Scope of work and directions of EIC.Note:(a) Repair and Maintenance including assistance in Fixing of Broken panels/DGU, tightening of nuts and hold sealing using Silicone Sealant (White, Clear and Black colour) etc. Includes replacement of defective/damaged Trolley Steel Rope if required. (b) Façade material required to be replaced viz, ACP Sheet/DGU shall be provided by GAIL. |
| 18 | Providing Services of Comprehensive Maintenance of 2 Nos. of Facade Cleaning Trolleys installed at GAIL Jubilee Tower, Noida, complete with all resources, spares, consumables, tools and tackles etc. as per SCC, Scope of work and directions of EIC. |
| 19 | Providing Services of Safety Inspection and compliance report submission (CHARGES PER INSTANCE OF INSPECTION OF ONE WORK) through Authorised/Approved Third Party Inspection Agency for any major repair/repalcement work carried out at site/as and when required, as per SCC, Scope of Work and Directions of the EIC. |
| 20 | Providing services for Load Testing (YEARLY ONCE) including furnishing of compliance certificate/report for the 2 Nos. of Façade Cleaning Trolleys installed at GAIL Jubilee Tower, Noida, through Authorised/Approved Third party Inspection Agency as per SCC, Scope of Work and Directions of the EIC. |
| 21 | Motor & Other Major Parts |
| 22 | Providing and FixingPower Climber Traction Hoist Titan PI 403 IP 54 Capacity 400Kg including Magnetic gear motor 0.37kw (3 phase) and Gear Box for Mgm 0.37kw motor as per direction of the EIC. |
| 23 | Providing and Fixing Magnetic gear motor 0.37kw (3 phase) as per direction of the EIC. |
| 24 | Providing and Fixing Gear Box for Mgm 0.37kw motor as per direction of the EIC. |
| 25 | Providing and Fixing T.T. motor as per direction of the EIC. Please Enable Macros to View BoQ information |