| 1 | Electrical work |
| 2 | 1.10.1:Wiring for light point/ fan point/ exhaust fan point/ call bell point with 1.5 sq.mm FRLS PVCinsulated copper conductor single core cable in surface / recessed medium class PVC conduit,with modular switch, modular plate, suitable GI box and earthing the point with 1.5 sq.mm. FRLSPVC insulated copper conductor single core cable etc as required.Group A |
| 3 | 1.10.2:Wiring for light point/ fan point/ exhaust fan point/ call bell point with 1.5 sq.mm FRLS PVCinsulated copper conductor single core cable in surface / recessed medium class PVC conduit,with modular switch, modular plate, suitable GI box and earthing the point with 1.5 sq.mm. FRLSPVC insulated copper conductor single core cable etc as required.Group B |
| 4 | 1.10.3:Wiring for light point/ fan point/ exhaust fan point/ call bell point with 1.5 sq.mm FRLS PVCinsulated copper conductor single core cable in surface / recessed medium class PVC conduit,with modular switch, modular plate, suitable GI box and earthing the point with 1.5 sq.mm. FRLSPVC insulated copper conductor single core cable etc as required.Group C |
| 5 | 1.17.3:Supplying and drawing following sizes of FRLS PVC insulated copper conductor, single core cable in the existing surface / recessed steel/ PVC conduit as required.3 X 1.5 sq.mm |
| 6 | 1.17.12:Supplying and drawing following sizes of FRLS PVC insulated copper conductor, single core cable in the existing surface / recessed steel/ PVC conduit as required.3 x 2.5 sq. mm |
| 7 | 1.17.21:Supplying and drawing following sizes of FRLS PVC insulated copper conductor, single core cable in the existing surface / recessed steel/ PVC conduit as required.3 x 4 sq. mm |
| 8 | 1.21.1:Supplying and fixing of following sizes of medium class PVC conduit along with accessories in surface/ recess including cutting the wall and making good the same in case of recessed conduit as required.20 mm |
| 9 | 1.21.2:Supplying and fixing of following sizes of medium class PVC conduit along with accessories in surface/ recess including cutting the wall and making good the same in case of recessed conduit as required.25 mm |
| 10 | 1.24.1:Supplying and fixing following modular switch/ socket on the existing modular plate & switch box including connections but excluding modular plate etc. as required.5/6 amps switch |
| 11 | 1.24.2:Supplying and fixing following modular switch/ socket on the existing modular plate & switch box including connections but excluding modular plate etc. as required.2 way 5/6 amps switch |
| 12 | 1.24.3:Supplying and fixing following modular switch/ socket on the existing modular plate & switch box including connections but excluding modular plate etc. as required.15/16 amp switch |
| 13 | 1.24.4:Supplying and fixing following modular switch/ socket on the existing modular plate & switch box including connections but excluding modular plate etc. as required.3 pin 5/6 amp socket outlet |
| 14 | 1.24.5:Supplying and fixing following modular switch/ socket on the existing modular plate & switch box including connections but excluding modular plate etc. as required.6 pin 15/16 amp socket outlet |
| 15 | 1.25:Supplying and fixing two module stepped type electronic fan regulator on the existing modular plate switch box including connections but excluding modular plate etc. as required. |
| 16 | 1.26:Supplying and fixing modular blanking plate on the existing modular plate & switch box excluding modular plate as required. |
| 17 | 1.27.2:Supplying and fixing following size/ modules, GI box alongwith modular base & cover plate for modular switches in recess etc as required.3 Module (100mmX75mm) |
| 18 | 1.27.1:Supplying and fixing following size/ modules, GI box alongwith modular base & cover plate for modular switches in recess etc as required.1 or 2 Module (75mmX75mm) |
| 19 | 1.33:Supplying and fixing 3 pin, 5 amp ceiling rose on the existing junction box/ wooden block including connection etc as required. |
| 20 | 1.38:Supplying and fixing call bell/ buzzer suitable for single phase, 230 volts, complete as required. |
| 21 | 1.56:Supplying and fixing suitable size Gl box with modular plate and cover in front on surface or in recess, including providng and fixing 2 Nos. 3 pin 5/6 A modular socket outlets and 2 Nos. 5/6 A modular switches, connection etc. as required. (For light plugs to be used in non residential buildings). |
| 22 | 1.31:Supplying and fixing suitable size GI box with modular plate and cover in front on surface or in recess, including providing and fixing 3 pin 5/6 amps modular socket outlet and 5/6 amps modular switch, connection etc. as required. (For light plugs to be used in non residential buildings). |
| 23 | 1.58:Supplying and fixing PVC batten/ angle holder including connection etc. as required. |
| 24 | 2.3.4:Supplying and fixing following way, single pole and neutral, sheet steel, MCBdistribution board, 240 volts, on surface/ recess, complete with tinned copperbus bar, neutral bus bar, earth bar, din bar, interconnections, powder paintedincluding earthing etc. as required. (But without MCB/RCCB/Isolator)16 way, Double door |
| 25 | 2.10.1:Supplying and fixing 5A to 32 A rating, 240/415 volts, 10 kA, \\"\\"C\\"\\" curve, miniaturecircuit breaker suitable for inductive load of following poles in the existing MCBDB complete with connections, testing and commissioning etc. as required.Single pole |
| 26 | 2.11:Supplying and fixing single pole blanking plate in the existing MCB DB complete etc. as required. |
| 27 | 2.12.1:Supplying and fixing following rating, double pole, 240 volts, isolator in the existing MCB DB complete with connections, testing and commissioning etc. as required.40 amps |
| 28 | 2.14.2:Supplying and fixing following rating, double pole, (single phase and neutral),240 volts, residual current circuit breaker (RCCB), having a sensitivity current 30 milli amperes in the existing MCB DB complete with connections, testing and commissioning etc. as required.40 amps |
| 29 | 2.16:Supplying and fixing DP sheet steel enclosure on surface/ recess along with 25/32amps 240 volts \\"C\\" curve DP MCB complete with connections, testing and commissioning etc. as required. |
| 30 | 5.3:Earthing with G.I. earth plate 600 mm X 600 mm X 6 mm thick including accessories, and providing masonry enclosure with cover plate having locking arrangement and watering pipe of 2.7 metre long etc. (but without charcoal/ coke and salt ) as required. |
| 31 | 5.17:Providing and fixing 4.00 mm dia copper wire on surface or in recess for loop earthing as required. |
| 32 | 5.13:Providing and laying earth connection from earth electrode with 4.00 mm dia copper wire in 15mm dia G.I. pipe from earth electrode including connection with copper thimble excavation and re-filling as required. |
| 33 | 5.14:Providing and fixing 25 mm X 5 mm copper strip on surface or in recess for connections etc. as required. |
| 34 | 90.16.5.4:Supply of superior quality copper earth socket for the following size of earth conductor including crimping etc. as required.4.00 mm (8 SWG) |
| 35 | 90.10.3.15:Supply and Fixing the following modular switches & accessories in the existing front plates and giving necessary connections as required (RoHS compliant )32A DP switch with indicator |
| 36 | 90.4.1:Supply and installation of suitable size MS rod type fan clamp in the RCC slab as per IS 732 as required. |
| 37 | 90.4.5.4:Supply, Installation, testing and commissioning of ceiling fan of following sizes including wiring the down rods of standard length (up to 30 cm) with 1.5 sq. mm FRLS PVC insulated, copper conductor, single core cable etc. as required.1200mm sweep - ceiling fan complete with service value minimum 4.0(cub meter/minute/Watt), Air delivery minimum 210(cubic meter/minute), Copper winding suitable for 230V/240V single phase AC supply |
| 38 | 90.6.6.2:Supply and drawing FRLS PVC insulated & sheathed 650/1100 V grade 3 core copper conductor flat cable for submersible pump motor conforming to IS 694 part I 1990 as required including giving necessary connections of the following sizes.2.50 sq mm |
| 39 | OD7779/2025-2026:Supply and installation of 9W LED Lamp Preferred Make Philips, osram, luker or equivalent. |
| 40 | 90.3.19.3:Supply conveyance, installation, testing and commissioning the light fittings of following types made from CRCA sheet 0.5mm thickness with all accessories and lamps directly on wall and giving connections with 16/0.20 mm 3 core PVC insulated and sheathed round copper conductor flex wire or extending the original wiring and giving connections as required1200 mm 1X20W LED Lamp with box type fixture |
| 41 | OD7781/2025-2026:Supply and installation of LED Bulk Head fitting 10W with Aluminum die-cast housing and polycarbonate optic materials including connection etc. as required. The luminaire shall have IP66 protection, luminous flux 1100 lm, luminous efficiency 110 lumens/watt, cool daylight color and 6500k color temperature PHILIPS Endura LED Bulk Head model WT202W LED10S CW PSU S3 PC or equivalent |
| 42 | OD7846/2025-2026: Supply and providing 25x6 mm brass bolt and nut with washers on the existing MS box / earth bus etc. as required including drilling necessary holes as required. |
| 43 | OD7847/2025-2026:Providing and fixing 12 SWG insulated GI wire for service wire binding along with service linecomplete with all accesaries complete as required. |
| 44 | OD7849/2025-2026:Engaging Labour charges for dismounting of existing light fittings, conduit and other electrical accessories from the existing wall or ceiling including all accessories complete as required. |
| 45 | OD7833/2025-2026:Supply and installation of wall mounting cubicle type CAPE make BRES 64 or equivalent Glass Fibre Reinforced Polyester energy meter enclosure IP66 ,1K 10 with hinged door 600 X400 X 230 mm with supply and fixing of with Base Plate for fixing 1Phase KSEB meter, cut out and neutral link with sufficient holes for fixing KSEB electronic energy meter, cut outs and neutral link supply and provide 1 no 25 amp HRC fuse link and 1 no 25 amp 2 way neutral link in the meter portion necessary holes are to be provide in the box for entry and exit of wire. including Supply and installation of 20A ,10kA DP MCB, C Curve,-1 NO Necessary inter connection should be done using 4 sq mm copper wire. Necessary holes are to be provided in the box for entry and exit of wire and sealed the joint with suitable sealing agent etc and all fixing accessories complete as required. |
| 46 | OD43/2026-2027:Documentation Charges for KSEB meter shifting Please Enable Macros to View BoQ information |