| 1 | Earth work in excavation including lead up to 30 meter lift upto 1.50 meter with proper disposal of earth, manual compaction & dressing to profile. As per direction in engineer in charge. |
| 2 | Centering & Shuttering for C.C. blocks and concrete including all cost of materials , labour and T&P etc complete. |
| 3 | Laying of C.C in (1:3:6) with stone ballast (20mm to 40mm) size and coarse sand FM not less than 2 including all cost of materials labour and T&P complete. |
| 4 | Laying of C.C in (1:2:4) with stone ballast of proper size and coarse sand FM not less than 2 including all cost of labour and T&P complete. |
| 5 | Providing, laying and fixing of jointing RCC hume pipe 150mm Dia including all cost of material labour T& P etc for complete work. |
| 6 | Ist Class Brick Masonary work (1:4) with coarse sand F.M. Not less than 2, including cost of all materials, labour and T&P etc with all leads and lift for proper completion of work as directed by Engineer-in-Charge as per drawing and I.D. specification. |
| 7 | 10mm to 15 mm thick Cement Plaster (1:4) cement mortar including all cost of material labour T&P etc for complete work. |
| 8 | Laying C.C. (1:1.5:3) with coarse sand F.M. Not less than 2, Crushed Stone Aggregate of size (12.5 mm to 20 mm)including all cost of material, labour and T&P etc. |
| 9 | Providing and laying TMT Steel Reinforcement of Grade Fe 500 including cost of steel, carriage, bending, binding, cutting and placing in position with cost of all materials, labour and T&P etc complete |
| 10 | Reinforced cement concrete (1:1.5:3) in all RCC work with Coarse sand having F.M. Not less than 2, Crushed Stone Aggregate of size (12.5 mm to 20 mm) Mechanically mixed and properly compacted by Vibrator including cost of all materials labours T&P etc. |
| 11 | Finishing of walls with two coat of water proofing cement paint of approved quality such as super Snowcem, Durrocem, Robiacem, Guttucem, supreme quality of required shade on uncoated wall surface after thoroughly brushing the surface to remove all dirt and remain of loose powdered materials including curing and cost of all materials. |
| 12 | Printing letter above 8CM and upto 15CM size complete including supply of all material ,Labour and T&P etc. |
| 13 | Making and Fixing Sign board during construction work at site including cost of all materials, labour and T&P etc. complete work as directed by Engineer-in-Charge as per I.D. specification. Please Enable Macros to View BoQ information |