| 1 | Material |
| 2 | PP & Clamp with N&B ST Pole SP-55 |
| 3 | IPC with Aluminium bail for earthing 11 KV |
| 4 | 11 KV Cable Ties for PIN insulator |
| 5 | 11 KV AAAC AL-59 (99 sqmm) Covered Conductor (SS4240813 & SS4240814) EN 50397-1:2006 the conductor shall be stranded, round, non compacted and water tight, Non compacted shall be comply with all the requirement of EN 50397-1.2006 The stranded conductor shall be longitudionally water blocked by means of a water blocking material the semi conducting screen inner insulation and outer insulation should be extruted in one step. The outer covering insulation shall be UV stabilized tracking resistant black |
| 6 | 11 KV Tension Clamp with Bail & IPC |
| 7 | Labour |
| 8 | Chemical Earthing |
| 9 | Fabrication of Steel |
| 10 | Excavation of Pit for stay set |
| 11 | Erection of 11 KV stay set |
| 12 | Grouting of Stay Set |
| 13 | Excavation of Pit for Pole |
| 14 | Erection of Single SP-23 Pole |
| 15 | Erection of Single SP-55 Pole |
| 16 | Grouting of Pole |
| 17 | Muffing of Pole |
| 18 | T-off Connection complete 11 KV Line |
| 19 | Cartage of SP-21/23 Pole (21-50) km |
| 20 | Cartage of SP-55 Pole (21-50) km |
| 21 | Cartage of Petty Material (21-50) km |
| 22 | Head Load Cartage SP-21/23 Pole (0-1 km) |
| 23 | Head Load Cartage SP-55 Pole (0-1 km) |
| 24 | Head Load Cartage of Petty material (0-1 km) |
| 25 | Back Carriage of Petty Material (0-20 km) |
| 26 | Fixing of IPC with Al. Bail for earthing |
| 27 | Realignment of Tilted Pole |
| 28 | Opening & Making of Jumpher of Section |
| 29 | Fixing of 11 kV 90 KN Tension Clamp with B&IPC |
| 30 | Fixing of 11 kV suspension ties |
| 31 | Back Head Load Cartage of Petty Material (0-1 km) |
| 32 | Laying, Spreading, Stringing AAAC Conductor |
| 33 | Removing of Old Conductor by Opening Jumper |
| 34 | Looping and Choping of tree branches Fixing of Aluminium Lugs Please Enable Macros to View BoQ information |