|
| 1 | Electrical Items : |
| 2 | PG CLAMP 70-70 SQ.mm. |
| 3 | STAY CLAMP FOR SP-21 WITH NUT & BOLT |
| 4 | STAY CLAMP FOR SP-23 WITH NUT & BOLT |
| 5 | SUSPENSION CLAMP EYE HOOK LT ABC CABLE |
| 6 | DEAD END CLAMPS WITH I HOOK AND N/B INS |
| 7 | STAY INSULATOR |
| 8 | Piercing Connector 16-16sqmm |
| 9 | Piercing Connector for 120-95 mm² |
| 10 | LT Distribution Box 3Phase 4Wire |
| 11 | Piercing Connector 120 to 35 sq. mm |
| 12 | LT XLPE Cable 1x35 sqmm |
| 13 | LT XLPE AB CABLE 3X95+1X50 SQ.MM. |
| 14 | LT XLPE AB CABLE 1CX16+25 SQ.MM. |
| 15 | LT ARIAL BUNCH CABLE 3X120+ 1X70 SQMM |
| 16 | AL. CRIMPING TYPE LUGS 70 SQ.mm |
| 17 | SERVICE (LABOUR) |
| 18 | ERECTION OF EARTHING ROD |
| 19 | EXCAVATION OF PIT FOR STAY SET |
| 20 | ERECTION OF 11 KV STAY SET |
| 21 | GROUTING OF STAY SET |
| 22 | EXCAVATION OF PIT FOR POLE |
| 23 | ERECTION OF SINGLE SP-21 POLE |
| 24 | ERECTION OF SINGLE SP-23 POLE |
| 25 | GROUTING OF POLE |
| 26 | DISMANTLING OF SP-21/SP-23 SINGLE POLE |
| 27 | DISMANTLING OF LT LINE 3 P 5 W(WEASEL) |
| 28 | CARTAGE SP-21/23 POLE, 0-20 KM |
| 29 | CARTAGE OF PETTY MATERIAL,0-20 KM |
| 30 | HEADLOAD CARTAGE SP-21/23 POLE(0-1 KM) |
| 31 | HEADLOAD CARTAGE OF MATERIAL(0-1 KM) |
| 32 | DISCONNECTION & RECONNECTIONOF CONsumer |
| 33 | LAYING OF AB CABLE 1X16+25 MM |
| 34 | BACK CARTAGE OF PETTY MATERIAL,71-100 KM |
| 35 | INSTALLATION OF LT DISTRIBUTION BOX |
| 36 | LAYING AND FIXING OF 1X35SQMM XLPE CABLE |
| 37 | BACK HEAD LOAD CART. OF PETTY MAT. 0-1KM |
| 38 | RELAYING RESAGGING 3x95SQ.MM. AB CABLE |
| 39 | RELAYING RESAGGING 3x120 SQ.MM AB CABLE Please Enable Macros to View BoQ information |