|
| 1 | Jungle clearance with cutting of behya/sarpat gondi and elephant grass. |
| 2 | Earth work in correcting section of canal by Piclain/JCB machines including side slope cutting at requried slope with all lead & lifts in all type of soils with disposal on daula and top & outer slope of banks including spreading and partial dressing as per direction by Engineer in charge. |
| 3 | Excavation of foundation in ordlanary soll/sandy loam, clay or sand including lift upto 1.5M and lead upto 30M and including filling, watering, ramming of excatated earth into the trenches or upto the space and sides of the foundation trenches or into the plinth and removal and disposal of surplus earth as per direction by Engineer in charge upto a distance of 30M from the foundation trenches. |
| 4 | M 150 class brick work in 1:4 CM with coarse sand FM not less than 2 including cost of all material, labour and T&P etc. Complete. as per direction by Engineer in charge. |
| 5 | M 150 class brick work in 1:3 CM with coarse sand FM not less than 2.5 including cost of all material, labour and T&P etc. Complete. as per direction by Engineer in charge. |
| 6 | Cement pointing in 1:2 CM (Stuck deep) including all cost of labour, material and T&P etc complete. |
| 7 | Centering and shuttering including cost of all materials, labours and T&P etc. |
| 8 | Laying C.C. (1 : 1.5 : 3) with coarse sand F.M. Not less than 2, Crushed Stone Aggregate of size (10 mm to 20 mm)including all cost of material, labour and T&P etc. as per direction of Engineer in charge. |
| 9 | C.C in 1:2:4 for bed floor including all cost of labour,material and T&P etc complete.as per direction by Engineer in charge. |
| 10 | Finishing walls with water proofing cement paint of approved quality make such as super snowcem in two coat over one coat of white cement primer including brushing the surface curing and cost of all materials. |
| 11 | Laying of C.C in (1:3:6) with stone ballast (20mm to 40mm) size and coarse sand FM not less than 2 including all cost of materials labour and T&P complete.as per direction by Engineer in charge. |
| 12 | 12 mm thick cement plaster work with 1:4CM coarse sand FM not less than 2 including all cost of material, labour and T&P etc. Complete.as per direction by Engineer in charge. |
| 13 | Bending, binding ,cutting,placing in position steel reinforcement including materials with cost of binding wire and tack welding for proper completion of work. As per direction of Engineer in Charge. |
| 14 | RCC 1:1.50:3 in casting of wheel guard including all cost of labour,material and T&P etc complete. |
| 15 | Fixing of wheel guard |
| 16 | Providing and laying R.C.C. NP2 Hume Pipe dia. 150 mm as per drawing in direction of engineer in charge Please Enable Macros to View BoQ information |