| 1 | Details of Supply (A) |
| 2 | PG CLAMP, PANTHER/PANTHER |
| 3 | PG CLAMP, MOOSE/MOOSE |
| 4 | PG CLAMP, MOOSE/PANTHER |
| 5 | FITT, BLTD, SINGLE TENSION,TWIN MOOSE |
| 6 | TERM KIT, CBL, 36KV, 1CX630SQMM,CU |
| 7 | SPACER TWIN MOOSE WITH 250 MM SPACING |
| 8 | SPACER TWIN MOOSE WITH 180 MM SPACING |
| 9 | SPACER TWIN PANTHER WITH 150 MM SPACING |
| 10 | PART-B(1) (63 MVA T/F ERECTION WORK) |
| 11 | Partially drain out the transformer oil from tank, Opening of jumpers of HV/LV side, removal of earthing strips from bushing and dismantling of 40 MVA T/F accessories including radiators, HV/LV Bushings, HV/LV turrets, HV/LV neutral bushings, Bucholz relay, oil pipe from conservator tank to main tank, oil pipe to OLTC and surge relay conservator tank at 132 KV S/S Mintopark with all cost of men, material T&P required for completion of work. |
| 12 | Shifting/Dragging of oil filled 40 MVA T/F from plinth to near open space (Distance about 20 mtr) including turning of main tank if required with all T&P and work required to complete the job satisfactorily. |
| 13 | Additional shifting of 40MVA T/F @every 5mtr |
| 14 | Dismantling of LV side LAs and H Pole structure of 40MVA T/F (Job includes all 03 phase) |
| 15 | Packing of All HV bushings of 40 MVA T/Fs in crates and shifting the bushing from site to store. (Packing material will be provided by contractor at his own cost. |
| 16 | Shifting of 33 KV, 3x300 sq.mm Alumunimum cable from 40 MVA T/F-IV, LV Bushing to interconnected Bay job includes dismantling all cable termination, opening / reclosing of 100 nos. trench cover & proper shifting to store. |
| 17 | Dismantling of 36 KV CT having ratio 800/400/1A. Job includes opening of all jumpers, earthing, nut & bolts, secondary connections etc. & shifting from site to store. |
| 18 | Dismantling of 36 KV Bus Isolator. Job includes opening of jumpers, earthing, nut & bolts etc. & shifting from site to store. |
| 19 | Safely shifting of 63 MVA T/F main tank from unloading place to existing T/F plinth by dragging about 20 Mtrs. Job includes turning of T/F if required, handling & shifting of all accessories of 63 MVA T/F such as radiator, conservator tank, bushing, cooling fan, marshling box, motor drive mechanism of RTCC panel, oil pipe line,t/f oil drum & all associated materials from store / unloading place to erection site as per requirement upto completion of job satisfactorily. |
| 20 | Additional shifting 40Mtr. @ 5mtr/ job |
| 21 | Complete erection of 63 MVA T/F by erection of radiator, conserator tank, all bushing, with their turrets connecting oil pipe lines, cooling fans,, motordrive mechaism of tap changer, RTCC panels etc. to complete the job satisfactorily including topping up of transformer oil in tank, radiators, oil pipe lines, conservator tank etc. and all other associated works for completion of work satisfactorily. All arrangement of T&P and man power will be provided by contractor at his own cost. |
| 22 | Centrifuging of complete T/F oil in T/F by connecting centrifuging pipes circulating the T/F oil through centrifuging machine and taking the BDV , PPM value of the oil periodically (Every hour) till the required value is achieved as per direction of supervising engineer. The work includes all the work related to centrifuging the oil and filling oil in T/F tank. (Operator, centrifuging machine and testing equipment shall be arrange by the Contactor). |
| 23 | Replacement of existing old T/F RTCC panel by new RTCC panel. Job includes opening of control cable, cutting of earthing, laying control cable, making termination, preparation of cable schedule etc. & shifting of dismantled panel to elsewhere as per direction of site incharge including all associated work satisfactorily. |
| 24 | Prepairing cable schedule and Dressing, binding and Termination of cable including fixing of cable tray support structure and termination of cable marking and its ferruling as per schedule and inter connection with T/F to C&R panel, RTCC panel, cooling fans ,marshaling box, driving mechanism etc and as per site requirement for completion of job satisfactorily. |
| 25 | Safely carriage of oil tank for above work from 400 KV S/S Masauli or Other S/S to 132 KV S/S Mintopark including loading, unloading & shifting at working place also to and fro distance approx. 2x80=160 km. |
| 26 | Earthing of T/F body, MB, DM box of OLTC, RTCC at two points using 75x10/50x6mm M.S. flat (M.S Flat shall be provided by the department) The job also includes Excavation of soil for connecting main Earth mat (X and Y) and levelling of soil after completion of work. |
| 27 | Painting of various MS Flat by one coat red oxide primer and two coat bus green paint of Nerolac/Burger/Asian make including painting of joints below ground by best quality of non corrosive paint. |
| 28 | Fabrication of radiator guards made of M.S. angle frame (inner angle of size 35x35x4 mm, outer angle of size 50x50x6 mm supporting leg of size 75x75x10 mm) fitted with steel wire mesh, (20x20mm, 08 SWG) for the front and top of the radiator of L.T. side of 63 MVA T/F at 132 KV S/S Mintopark as per the site requirement. All Labour, T&P and materials will be provided by contractor at his own cost. |
| 29 | Fixing of new fabricated radiator guards into the pit of size 2x2x2 feet and ground on earth by 1:2:4 C.C. mixture and making the plinth of 1x1x1 feet above ground level alongwith plastering including the cost of the labour, T&P and materials. |
| 30 | Rubbing and cleaning of radiator guard by sand paper, removing the dust and rust. Providing and applying one coat of red oxide primer and then after two coat of synthetic enamelled good quality paint of Asian/berger/Nerolac make in Grey colour. |
| 31 | Testing of newly erected 63 MVA T/F oil by arranging appropriate equipments. Job includes BDV, PPM, DGA, TAN DELTA resistivity and all assocaited testing as per instruction. |
| 32 | PART-B(2) (63MVA T/F BAY, 132 & 33KV BUS AND BAY STRENTHENING WORK ) |
| 33 | Erection of following equipments as per instruction manual of various equipments including shifting from store to erection site including all other associated work to complete the job satisfactorily:- |
| 34 | 30 KV LA |
| 35 | 36 KV CT including Jn Box |
| 36 | 36 KV Bus Isolator 2000A |
| 37 | Laying of control cable from C&R Panel, RTCC panel to Transformer Marshaling box, D/M Box, CT, PT, Isolator etc. as per site requirement. Job includes preparing cable schedule, Dressing, binding and Termination of cable, fixing of cable tray, support structure and termination of cable, marking and its ferruling as per schedule, inter connection with C&R panel, CT, PT, Isolators etc. as per site requirement for completion of job satisfactorily. |
| 38 | 1.1 KV unarmoured control cable 2Cx2.5 sq.mm. |
| 39 | 1.1 KV unarmoured control cable 4Cx2.5 sq.mm. |
| 40 | 1.1 KV unarmoured control cable 6Cx2.5 sq.mm. |
| 41 | 1.1 KV unarmoured control cable 10Cx2.5 sq.mm. |
| 42 | Laying & erection of 33 KV 1Cx630 sq.mm XLPE copper cable including opening & closing cable trench at 40 MVA T/F-IV LV bushing to interconnected bay as per UPPTCL norms. |
| 43 | Termination of 1Cx630 sq.mm XLPE copper cable joint kit at both end of cable and proper connection with jumper (Termination kit provided by department free of cost). |
| 44 | Erection of H Pole & other structure for erection of 33 KV LA & support for hoisting of 33 KV 1Cx630 sq.mm cable including digging pit & proper concreting with 1:2:4 ratio of Cement, Sand & concrete ballast as per site requirement. |
| 45 | Jumpering of T/F from 132 KV Bus Isolator to HV bushing of 63 MVA T/F with Panther (all 03 phase). |
| 46 | Dismatnling of existing 33 KV bus bar of moose conductor including opening of old jumpers from 33 KV Bus bar and all connected feeders then Shfiting of above dismantled materials from site to S/S store including proper stacking etc. |
| 47 | Stringing of 33 KV Bus bar twin moose conductor (length approx 12 mtr.) by using suitable hardware, Spacer and Disc Insulator including shifting of materials from S/S store to site in limited shutdown period. |
| 48 | Providing jumper of Double moose conductor with Spacer clamp from 33 KV Main Busbar to 33 kv Bus isolator in various feeder & other equipment as per site requirement. Job includes cutting, bending, proper tightening with clamp within limited S/D period, required materials carriage from store to site & extra/waste materials to sub station store. |
| 49 | Providing jumper of Twin panther conductor with Spacer Clamp from 33 KV Busbar to various Bay bus isolator and other equipments as per site requirement. Job includes cutting, bending proper tightening with clamp, required materials carriage from store to site & extra/waste materials proper stored in Sub station store. |
| 50 | Providing jumper of panther conductor from 33 KV Busbar to 33 KV Bus PT & station T/F and other equipments as per site requirement including cutting, bending proper tightening with clamp, required materials carriage from store to site & extra/waste materials proper stored in Sub station store. |
| 51 | Supply & Fixing of decorative recessed Energy Efficient LED fitting of size 600x600mm of 36 Watt Havells / Crompton make. |
| 52 | Providing & Fixing of 160 /150 Watt LED Light (Make - CGL/Havell's) AC Voltage 90-300 V, 50 Hz, along with 1 mrter long steel bend pipe & clamp with Nuts & Bolts for fixing on S/S gantry and connection of supply cable between LTDB panel to Light including all associated works for completion of Job satisfactorily. |
| 53 | Providing and fixing of Juction Box on Column of size 100 X 200 X 150 mm .Tne Box consists of one number 6A MCB and Bakelite terminal strip of 04 No. terminal fixed inside the Box.The fixing clip and Nut,Bolt and washer will be arranged by Contractor as his own cost . |
| 54 | Providing & fixing of name plate made of 3 mm aluminum composite panel of size 300x200 mm to be covered with 3 M hip retro reflective sheeting with detail of equipment made by the computer typing in the sheet & fixing it on structure with the help of nut & bolts. All t& p labour nut & bolt shall be provided by the contractor. |
| 55 | Providing & fixing bay name display board of MS Sheet 16 gase size 400x250 mm with the help of MS pipe having inner frame approx. size 2\\"x1\\" with welding of two legs of MS angle of 03 feet and writing name of bay black colour after painting sheet with 02 coat of red primer & 01 coat yellow colour both side of display board including digging, grounting, concreating (1:2:4 Ratio), 1.5 feet from ground level & all associated work to installed Bay name display board satisfactorily. |
| 56 | Carriage of misslacllaneious matterial from different substation to 132 KV S/S Minto Park including loading, unloading & shifting (distance 100 Km. approx). |
| 57 | Checking and rectification of the status of HV & LV Bus Isolaters for proper signal/status sending from isolators to C&R panel. The work includes checking all the isolators ON/OFF status from switchyard to C&R panel installed in control room. Rectify the false signals receiving from Isolators by replacing auxiliary contacts. terminal blocks, or laying another control cable from switchyard to C&R panel in place of defective cable if found. The job includes all associated work to make isolators status fuctional. (All required material to complete the job satisfactorily, will be provide by contractor at his own cost.) [ Please Enable Macros to View BoQ information |