| 1 | Chipping of Plain cement concrete lime softner tank and floor including debris disposing away from the site as directed by the department Engineer in-charge including cost of all labour charges, lead, lift, etc, complete. |
| 2 | Earthwork excavation in soft disintegrated rock, laterite, soft rock or kankar, not requiring blasting with an initial lead of 10m and lift of 2m without damaging the nearby structure and dumping the excavated earth in the Engineer at site including cost of all materials, all lead & lift, T&Pโs etc., Complete. |
| 3 | Providing Brick work in CM 1:4 using chamber burnt class II bricks of size 9\\"x41/2\\"x3\\" as directed by the Engineer incharge including cost of all materials, labour charges, materials, curing, lead, lift, T&P's, etc., complete. |
| 4 | Plastering in CM 1:5, 12mm thick for wall surfaces neatly as directed by the Engineer in-charge at site includng cost of all materials, labour charges, lead, lift, etc, complete. |
| 5 | Laying acid proof tiles lining with one coat of anti corrosive primer followed by laying12mm thick acid resistance mastic and laying 200x100x20mm tiles with rotex cement S powder and cement K solution 3:1 ratio mortor for joints pointed with CSNL powder and CSNL syrup in the ratio of 3:1 including cost of all materials, all labour charges, all leads, lift, etc., completed. |
| 6 | Supplying and fixing in position of coloured or plain interlocking cement concrete paver blocks M20 grade of 60mm thick with antiskid surface texture over M sand bed with well watered and consolidated by earth rammer in all levels including cost of all labour charges, T&P's etc., complete. |
| 7 | Painting two coats of old iron work with enamel paint over one coat of red oxide primer of good and standard approved quality to the steel work including cost of all materials, brushes, lead, lift, etc., Complete. |
| 8 | Colour washing two coats of add colouring pigment primer using white cement for exterior surfaces of walls including cost of materials, labour charges, cleaning the surfaces, scaffolding charges, lead, lift, etc., complete as directed by the department engineer at site. Please Enable Macros to View BoQ information |