| 1 | Brickwork (Fly Ash Brick) in cement morter (16) In super structure having crushing strength not less than 75.00 kg/cm2 immersing the bricks in water not less than six hours before use in masonагу |
| 2 | Brick work (Fly Ash Brick) in cement meter (1:4) in superstructure having crushing strength not less than 150.00 kg/cm² hours befucr use in masonary. immerging the bricks in water not less than six hour before use in masonary |
| 3 | Providing and Laying reinforce coment concrete M-20 Grade20 mm nominal size C.B chips including cost all materials.labours,T & Pcuring etc complete (excluding the cost ofLintel |
| 4 | Chaja |
| 5 | Roof slab |
| 6 | Roof beam |
| 7 | Stair case |
| 8 | Cutting, bending, binding and tying the grills and placing in potion of steel reinforcement. |
| 9 | 16 mm thick cement Plaster (1:6) over brick work including racking out joints finishing smooth with proper plumb and line watering |
| 10 | 6 mm thick cement Plaster (1:4) to celling including racking out joints finishing smooth with proper plumb and line watering curing |
| 11 | 12 mm thick cement Plaster (1:6) uver brick work including racking out joints finishing smooth with proper plumb and line watering curlag etc complete. |
| 12 | Cement washing one coat including scaffolding and cleaning the surface before application. |
| 13 | Finishing exterior wall with weather coat paint (Anti-fugal) of approved shade on new work of two coats over a coat of wall primer including cost of paint and labour charges including scaffolding and cleaning the surface before application etc complete. |
| 14 | Wall painting 2 coats with plastic paint of apprimedal primering including ont of all material labour complete |
| 15 | Finishing plasterid surfaces of walls with Berger Synthetic patty (Interior) & marking smooth to receive painting |
| 16 | Factory made Solid WPC door frame of size 95emma55eum fabricated The dust frame consist of four segments which are provided with plug-in-sochet arrangement in-site in the mondd. The segments are plugged in and arv joined together by means of screw. The WPC frame shall he provided with The material and process for manufacturing the door frames shall confarin to Redevent LS.specification. The finish of door frame will be plain sour white hury Beiger Light grey Golden brown/Mahogans Teak/ wood/sand stone/champagne /paste blue or any other |
| 17 | Factory made single leaf Sulid WPC (Woof polymer) composite door shutter of 25mm thickcompacted with wood grain finish structural foem panel of 29mm thickness ami a density of 20kg/cu.mtr shall be used as core material for fitting the metal fittings such as tower bolts, akdrops, handles etc shall be provided. A structured adhesive compatible with (EPS) foam shall hall be used for bending the core material. The material and process for manufacturing the door shutters shall conform to RV-TIFAC. composites Design Centre's standards and specifications and the door shutters Conforming to relevant 15.specification. The finish of door shutter will be plain colour white/ Ivory/ Beige/ Light grey |
| 18 | Supplying, fitting and fizing of two track UPVC sliding window of approved make with 6mm thick glass of approved quality complete with frame shutters and all Fitting and flatures etc. complete as per direction of Engineer-in-charge at all theirs and all heights |
| 19 | Supplying, fitting & fixing of Vetrifed Tile in flours of size 600mm x 600mm of approved make conforming to 15: 13755 laid on 20 mm thick cement mortar and filling joints with white cement of approved quality including cost of all materiah, labour T&P etc required for the worka all complete as per direction of Engineer-in-charge. (Fur new work only) Hall |
| 20 | Floor tile flooring in Tollets over cement plaster 1:1 25mm thick bed with cost of all materials, labours T & P etc.complete |
| 21 | Providing and fixing ceramic tiles of approved size in dado & Skirting over cement plaster 1:3, 12 mm thick jointed with neat cement slurry including cost of all material labour T & P etc. |
| 22 | Supply and fixing of M.S grill in window.as per the direction of EIC |
| 23 | Painting two coats of enamel paint over a coat of priming complete |
| 24 | Fitting &fixing Of Stainless steel hand rail For stair case |
| 25 | Brick work (Fly Ash Brick) in cement mortar (1:6) in super structure having crushing strength not less than 75.00 kg/cm2 immerging the bricks in water not less than six hours before use in masonary |
| 26 | Providing and Laying reinforce cement concrete M-20 Grade20 mm nominal size C.B chips including cost all materials, labours, T & P,curing etc complete (excluding the cost ofLintel |
| 27 | Chaja |
| 28 | Roof slab |
| 29 | Roof Beam |
| 30 | Cutting, bending, hinding and tying the grills and placing in position of steel reinforcement. |
| 31 | 16 mm thick cement Plaster (1:6) over brick work including racking out joints finishing smooth with proper plumb and line watering |
| 32 | 6 mm thick cement Plaster (1:4) to ceiling including racking out joints finishing smooth with proper plumb and line watering curing |
| 33 | 12 mm thick cement Plaster (1:6) over brick work including racking out joints finishing smooth with proper plumb and line watering curing etc compl |
| 34 | Cement washing one coat including scaffolding and cleaning the surface before application. |
| 35 | Finishing exterior wall with weather coat paint (Anti-fugal) of approved shade on new work of two coats over a coat of wall primer including cost of paint and labour charges including scaffolding and cleaning the surface before application etc complete |
| 36 | Wall painting 2 coats with plastic emulsion paint of approved shade over a cont of primering including cost of all materiallabour etc. complete |
| 37 | Finishing plastered surfaces of walls with Berger Synthetic putty (interior) & marking smooth to receive painting |
| 38 | Supply and fixing of M.S grill in window.as per the direction of EIC |
| 39 | Painting two coats of enamel paint over a coat of priming complete Please Enable Macros to View BoQ information |