Sales : +91-777 804 8217
| Sl. No. | Item Description |
| 1 | Earth work excavation of foundation in hard soil with all leads and lifts including dressing the sides and levelling the bed of foundation including cost of all labour required for the work etc complete with all other T&P required for the work and stacking the excavated materials away from working area as directed by the Engineer-in-charge including 1% cess. Ground Floor |
| 2 | Earth work excavation of foundation in hard soil with all leads and lifts including dressing the sides and levelling the bed of foundation including cost of all labour required for the work etc complete with all other T&P required for the work and stacking the excavated materials away from working area as directed by the Engineer-in-charge including 1% cess. Boundary wall |
| 3 | Earth work excavation of foundation in hard soil with all leads and lifts including dressing the sides and levelling the bed of foundation including cost of all labour required for the work etc complete with all other T&P required for the work and stacking the excavated materials away from working area as directed by the Engineer-in-charge including 1% cess. Concrete road |
| 4 | Earth work excavation of foundation in hard soil with all leads and lifts including dressing the sides and levelling the bed of foundation including cost of all labour required for the work etc complete with all other T&P required for the work and stacking the excavated materials away from working area as directed by the Engineer-in-charge including 1% cess. Concrete drain |
| 5 | Supplying and filling in foundation and plinth with sand well watered & rammed with cost ,conveyance, royality & taxes of all materials and labour required for the work as per specification and including 1% cess as per direction of the Engineer-in-Charge. Ground Floor |
| 6 | Supplying and filling in foundation and plinth with sand well watered & rammed with cost ,conveyance, royality & taxes of all materials and labour required for the work as per specification and including 1% cess as per direction of the Engineer-in-Charge. Boundary wall |
| 7 | Supplying and filling in foundation and plinth with sand well watered & rammed with cost ,conveyance, royality & taxes of all materials and labour required for the work as per specification and including 1% cess as per direction of the Engineer-in-Charge. Concrete road |
| 8 | Supplying and filling in foundation and plinth with sand well watered & rammed with cost ,conveyance, royality & taxes of all materials and labour required for the work as per specification and including 1% cess as per direction of the Engineer-in-Charge. Concrete drain |
| 9 | Cement Concrete of proportion(1:3:6) in foundation and plinth using 4cm size clean hard black granite metal of approved quality from approved quarry including hoisting, lowering and laying in layers not exceeding 15cm thick to the required level, ramming watering and curing etc.complete including cost, conveyance, royalty taxes of all the materials required for the work with all labour, T&P and cess etc. complete in all respect as per specification and direction of the Engineer-in-charge. Concrete road |
| 10 | Cement Concrete of proportion(1:3:6) in foundation and plinth using 4cm size clean hard black granite metal of approved quality from approved quarry including hoisting, lowering and laying in layers not exceeding 15cm thick to the required level, ramming watering and curing etc.complete including cost, conveyance, royalty taxes of all the materials required for the work with all labour, T&P and cess etc. complete in all respect as per specification and direction of the Engineer-in-charge. Concrete drain |
| 11 | Providing Cement concrete (1:4:8) in foundation with 4cm nominal size of crusher broken hard granite stone metal of approved quality from approved quarry including hoisting, lowering and laying in position in layers not exceeding 150 mm thick with proper packing and ramming to proper slope and level including watering , curing with cost , conveyance, royality, taxes , labour, T&P and all other materials required for the work , finishing the exposed surface smooth , providing grooves and beads where ever necessary etc. complete in all respect as per the specification and including 1% cess as per direction of the Engineer-in-charge. Ground Floor |
| 12 | Providing Cement concrete (1:4:8) in foundation with 4cm nominal size of crusher broken hard granite stone metal of approved quality from approved quarry including hoisting, lowering and laying in position in layers not exceeding 150 mm thick with proper packing and ramming to proper slope and level including watering , curing with cost , conveyance, royality, taxes , labour, T&P and all other materials required for the work , finishing the exposed surface smooth , providing grooves and beads where ever necessary etc. complete in all respect as per the specification and including 1% cess as per direction of the Engineer-in-charge. Boundary wall |
| 13 | Fly Ash brick masonary in C:M (1:6) using 25cmx12cmx8 cm size bricks having crushsing strength of not less than 75 Kg. per sq.cm. in Foundation and Plinth including splays cutting, circular, mouldings, and corbelling , champhering and similar such type of work , watering and curing etc . complete including cost , conveyance, royalities and taxes of all materials and cost of all labour with T&P required for the work etc. complete including 1% cess and as per the specification as directed by the Engineer-in-charge. Ground Floor |
| 14 | Fly Ash brick masonary in C:M (1:6) using 25cmx12cmx8 cm size bricks having crushsing strength of not less than 75 Kg. per sq.cm. in Foundation and Plinth including splays cutting, circular, mouldings, and corbelling , champhering and similar such type of work , watering and curing etc . complete including cost , conveyance, royalities and taxes of all materials and cost of all labour with T&P required for the work etc. complete including 1% cess and as per the specification as directed by the Engineer-in-charge. Boundary wall |
| 15 | Cement concrete work (1:2:4) using 12 mm to 20 mm size black hard crusher broken granite stone chips of approved quality from approved quarry including hoisting,lowering , laying and compacting concrete watering and curing for 28 days including finishing the exposed surface including cost , conveyance, royalties and taxes of all the materials and cost of all labour, T&P required for the work etc. complete in all respect including 1% cess as per direction of the Engineer-in-charge. Ground Floor |
| 16 | Cement concrete work (1:2:4) using 12 mm to 20 mm size black hard crusher broken granite stone chips of approved quality from approved quarry including hoisting,lowering , laying and compacting concrete watering and curing for 28 days including finishing the exposed surface including cost , conveyance, royalties and taxes of all the materials and cost of all labour, T&P required for the work etc. complete in all respect including 1% cess as per direction of the Engineer-in-charge. Boundary wall |
| 17 | Cement concrete work (1:2:4) using 12 mm to 20 mm size black hard crusher broken granite stone chips of approved quality from approved quarry including hoisting,lowering , laying and compacting concrete watering and curing for 28 days including finishing the exposed surface including cost , conveyance, royalties and taxes of all the materials and cost of all labour, T&P required for the work etc. complete in all respect including 1% cess as per direction of the Engineer-in-charge. Concrete road |
| 18 | Cement concrete work (1:2:4) using 12 mm to 20 mm size black hard crusher broken granite stone chips of approved quality from approved quarry including hoisting,lowering , laying and compacting concrete watering and curing for 28 days including finishing the exposed surface including cost , conveyance, royalties and taxes of all the materials and cost of all labour, T&P required for the work etc. complete in all respect including 1% cess as per direction of the Engineer-in-charge. Concrete drain |
| 19 | Cement concrete work (1:2:4) using 12 mm to 20 mm size black hard crusher broken granite stone chips of approved quality from approved quarry including hoisting,lowering , laying and compacting concrete watering and curing for 28 days including finishing the exposed surface including cost , conveyance, royalties and taxes of all the materials and cost of all labour, T&P required for the work etc. complete in all respect including 1% cess as per direction of the Engineer-in-charge. First Floor |
| 20 | R.C.C. M-25 grade having a minimum compressive strength ( in work test ) 200 kg/ sq. cm in 15 cm cubes at 28 days after mixing and tests conducted in accordance with I.S 456 and I.S 516 using 20 mm and down graded size black hard crusher broken granite chips of approved quality from approved quarry including hoisting, lowering , laying and compacting concrete , watering and curing for 28 days, centring, shuttering , finishing the exposed surface including ceiling smooth, providing grooves , beads where necessary and providing required no of fan hooks as directed including cost, conveyance, royalities and taxes of all the materials and cost of all labour, T&P required for the work etc. complete in all respect including 1% cess as per direction of the Engineer in charge but excluding the cost of M.S rods or Tor steel and binding wire and labour charges for bending, binding and tying the grills as per specification and direction of the Engineer-in-charge. Ground floor Column base |
| 21 | R.C.C. M-25 grade having a minimum compressive strength ( in work test ) 200 kg/ sq. cm in 15 cm cubes at 28 days after mixing and tests conducted in accordance with I.S 456 and I.S 516 using 20 mm and down graded size black hard crusher broken granite chips of approved quality from approved quarry including hoisting, lowering , laying and compacting concrete , watering and curing for 28 days, centring, shuttering , finishing the exposed surface including ceiling smooth, providing grooves , beads where necessary and providing required no of fan hooks as directed including cost, conveyance, royalities and taxes of all the materials and cost of all labour, T&P required for the work etc. complete in all respect including 1% cess as per direction of the Engineer in charge but excluding the cost of M.S rods or Tor steel and binding wire and labour charges for bending, binding and tying the grills as per specification and direction of the Engineer-in-charge. Boundary wall |
| 22 | R.C.C. M-25 grade having a minimum compressive strength ( in work test ) 200 kg/ sq. cm in 15 cm cubes at 28 days after mixing and tests conducted in accordance with I.S 456 and I.S 516 using 20 mm and down graded size black hard crusher broken granite chips of approved quality from approved quarry including hoisting, lowering , laying and compacting concrete , watering and curing for 28 days, centring, shuttering , finishing the exposed surface including ceiling smooth, providing grooves , beads where necessary and providing required no of fan hooks as directed including cost, conveyance, royalities and taxes of all the materials and cost of all labour, T&P required for the work etc. complete in all respect including 1% cess as per direction of the Engineer in charge but excluding the cost of M.S rods or Tor steel and binding wire and labour charges for bending, binding and tying the grills as per specification and direction of the Engineer-in-charge.Columns & Beams Ground Floor |
| 23 | R.C.C. M-25 grade having a minimum compressive strength ( in work test ) 200 kg/ sq. cm in 15 cm cubes at 28 days after mixing and tests conducted in accordance with I.S 456 and I.S 516 using 20 mm and down graded size black hard crusher broken granite chips of approved quality from approved quarry including hoisting, lowering , laying and compacting concrete , watering and curing for 28 days, centring, shuttering , finishing the exposed surface including ceiling smooth, providing grooves , beads where necessary and providing required no of fan hooks as directed including cost, conveyance, royalities and taxes of all the materials and cost of all labour, T&P required for the work etc. complete in all respect including 1% cess as per direction of the Engineer in charge but excluding the cost of M.S rods or Tor steel and binding wire and labour charges for bending, binding and tying the grills as per specification and direction of the Engineer-in-charge.Columns & Beams Boundary wall |
| 24 | R.C.C. M-25 grade having a minimum compressive strength ( in work test ) 200 kg/ sq. cm in 15 cm cubes at 28 days after mixing and tests conducted in accordance with I.S 456 and I.S 516 using 20 mm and down graded size black hard crusher broken granite chips of approved quality from approved quarry including hoisting, lowering , laying and compacting concrete , watering and curing for 28 days, centring, shuttering , finishing the exposed surface including ceiling smooth, providing grooves , beads where necessary and providing required no of fan hooks as directed including cost, conveyance, royalities and taxes of all the materials and cost of all labour, T&P required for the work etc. complete in all respect including 1% cess as per direction of the Engineer in charge but excluding the cost of M.S rods or Tor steel and binding wire and labour charges for bending, binding and tying the grills as per specification and direction of the Engineer-in-charge.Columns & Beams First Floor |
| 25 | R.C.C. M-25 grade having a minimum compressive strength ( in work test ) 200 kg/ sq. cm in 15 cm cubes at 28 days after mixing and tests conducted in accordance with I.S 456 and I.S 516 using 20 mm and down graded size black hard crusher broken granite chips of approved quality from approved quarry including hoisting, lowering , laying and compacting concrete , watering and curing for 28 days, centring, shuttering , finishing the exposed surface including ceiling smooth, providing grooves , beads where necessary and providing required no of fan hooks as directed including cost, conveyance, royalities and taxes of all the materials and cost of all labour, T&P required for the work etc. complete in all respect including 1% cess as per direction of the Engineer in charge but excluding the cost of M.S rods or Tor steel and binding wire and labour charges for bending, binding and tying the grills as per specification and direction of the Engineer-in-charge.Columns & Beams Second Floor |
| 26 | R.C.C. M-25 grade having a minimum compressive strength ( in work test ) 200 kg/ sq. cm in 15 cm cubes at 28 days after mixing and tests conducted in accordance with I.S 456 and I.S 516 using 20 mm and down graded size black hard crusher broken granite chips of approved quality from approved quarry including hoisting, lowering , laying and compacting concrete , watering and curing for 28 days, centring, shuttering , finishing the exposed surface including ceiling smooth, providing grooves , beads where necessary and providing required no of fan hooks as directed including cost, conveyance, royalities and taxes of all the materials and cost of all labour, T&P required for the work etc. complete in all respect including 1% cess as per direction of the Engineer in charge but excluding the cost of M.S rods or Tor steel and binding wire and labour charges for bending, binding and tying the grills as per specification and direction of the Engineer-in-charge. Plinth beamsGround Floor |
| 27 | R.C.C. M-25 grade having a minimum compressive strength ( in work test ) 200 kg/ sq. cm in 15 cm cubes at 28 days after mixing and tests conducted in accordance with I.S 456 and I.S 516 using 20 mm and down graded size black hard crusher broken granite chips of approved quality from approved quarry including hoisting, lowering , laying and compacting concrete , watering and curing for 28 days, centring, shuttering , finishing the exposed surface including ceiling smooth, providing grooves , beads where necessary and providing required no of fan hooks as directed including cost, conveyance, royalities and taxes of all the materials and cost of all labour, T&P required for the work etc. complete in all respect including 1% cess as per direction of the Engineer in charge but excluding the cost of M.S rods or Tor steel and binding wire and labour charges for bending, binding and tying the grills as per specification and direction of the Engineer-in-charge. Lintels Ground Floor |
| 28 | R.C.C. M-25 grade having a minimum compressive strength ( in work test ) 200 kg/ sq. cm in 15 cm cubes at 28 days after mixing and tests conducted in accordance with I.S 456 and I.S 516 using 20 mm and down graded size black hard crusher broken granite chips of approved quality from approved quarry including hoisting, lowering , laying and compacting concrete , watering and curing for 28 days, centring, shuttering , finishing the exposed surface including ceiling smooth, providing grooves , beads where necessary and providing required no of fan hooks as directed including cost, conveyance, royalities and taxes of all the materials and cost of all labour, T&P required for the work etc. complete in all respect including 1% cess as per direction of the Engineer in charge but excluding the cost of M.S rods or Tor steel and binding wire and labour charges for bending, binding and tying the grills as per specification and direction of the Engineer-in-charge. Lintels First Floor |
| 29 | R.C.C. M-25 grade having a minimum compressive strength ( in work test ) 200 kg/ sq. cm in 15 cm cubes at 28 days after mixing and tests conducted in accordance with I.S 456 and I.S 516 using 20 mm and down graded size black hard crusher broken granite chips of approved quality from approved quarry including hoisting, lowering , laying and compacting concrete , watering and curing for 28 days, centring, shuttering , finishing the exposed surface including ceiling smooth, providing grooves , beads where necessary and providing required no of fan hooks as directed including cost, conveyance, royalities and taxes of all the materials and cost of all labour, T&P required for the work etc. complete in all respect including 1% cess as per direction of the Engineer in charge but excluding the cost of M.S rods or Tor steel and binding wire and labour charges for bending, binding and tying the grills as per specification and direction of the Engineer-in-charge. Chajja Ground Floor |
| 30 | R.C.C. M-25 grade having a minimum compressive strength ( in work test ) 200 kg/ sq. cm in 15 cm cubes at 28 days after mixing and tests conducted in accordance with I.S 456 and I.S 516 using 20 mm and down graded size black hard crusher broken granite chips of approved quality from approved quarry including hoisting, lowering , laying and compacting concrete , watering and curing for 28 days, centring, shuttering , finishing the exposed surface including ceiling smooth, providing grooves , beads where necessary and providing required no of fan hooks as directed including cost, conveyance, royalities and taxes of all the materials and cost of all labour, T&P required for the work etc. complete in all respect including 1% cess as per direction of the Engineer in charge but excluding the cost of M.S rods or Tor steel and binding wire and labour charges for bending, binding and tying the grills as per specification and direction of the Engineer-in-charge. Chajja First Floor |
| 31 | R.C.C. M-25 grade having a minimum compressive strength ( in work test ) 200 kg/ sq. cm in 15 cm cubes at 28 days after mixing and tests conducted in accordance with I.S 456 and I.S 516 using 20 mm and down graded size black hard crusher broken granite chips of approved quality from approved quarry including hoisting, lowering , laying and compacting concrete , watering and curing for 28 days, centring, shuttering , finishing the exposed surface including ceiling smooth, providing grooves , beads where necessary and providing required no of fan hooks as directed including cost, conveyance, royalities and taxes of all the materials and cost of all labour, T&P required for the work etc. complete in all respect including 1% cess as per direction of the Engineer in charge but excluding the cost of M.S rods or Tor steel and binding wire and labour charges for bending, binding and tying the grills as per specification and direction of the Engineer-in-charge. Chajja Second Floor |
| 32 | R.C.C. M-25 grade having a minimum compressive strength ( in work test ) 200 kg/ sq. cm in 15 cm cubes at 28 days after mixing and tests conducted in accordance with I.S 456 and I.S 516 using 20 mm and down graded size black hard crusher broken granite chips of approved quality from approved quarry including hoisting, lowering , laying and compacting concrete , watering and curing for 28 days, centring, shuttering , finishing the exposed surface including ceiling smooth, providing grooves , beads where necessary and providing required no of fan hooks as directed including cost, conveyance, royalities and taxes of all the materials and cost of all labour, T&P required for the work etc. complete in all respect including 1% cess as per direction of the Engineer in charge but excluding the cost of M.S rods or Tor steel and binding wire and labour charges for bending, binding and tying the grills as per specification and direction of the Engineer-in-charge. Roof Slab Ground Floor |
| 33 | R.C.C. M-25 grade having a minimum compressive strength ( in work test ) 200 kg/ sq. cm in 15 cm cubes at 28 days after mixing and tests conducted in accordance with I.S 456 and I.S 516 using 20 mm and down graded size black hard crusher broken granite chips of approved quality from approved quarry including hoisting, lowering , laying and compacting concrete , watering and curing for 28 days, centring, shuttering , finishing the exposed surface including ceiling smooth, providing grooves , beads where necessary and providing required no of fan hooks as directed including cost, conveyance, royalities and taxes of all the materials and cost of all labour, T&P required for the work etc. complete in all respect including 1% cess as per direction of the Engineer in charge but excluding the cost of M.S rods or Tor steel and binding wire and labour charges for bending, binding and tying the grills as per specification and direction of the Engineer-in-charge. Roof Slab First Floor |
| 34 | R.C.C. M-25 grade having a minimum compressive strength ( in work test ) 200 kg/ sq. cm in 15 cm cubes at 28 days after mixing and tests conducted in accordance with I.S 456 and I.S 516 using 20 mm and down graded size black hard crusher broken granite chips of approved quality from approved quarry including hoisting, lowering , laying and compacting concrete , watering and curing for 28 days, centring, shuttering , finishing the exposed surface including ceiling smooth, providing grooves , beads where necessary and providing required no of fan hooks as directed including cost, conveyance, royalities and taxes of all the materials and cost of all labour, T&P required for the work etc. complete in all respect including 1% cess as per direction of the Engineer in charge but excluding the cost of M.S rods or Tor steel and binding wire and labour charges for bending, binding and tying the grills as per specification and direction of the Engineer-in-charge. Roof Slab Second Floor |
| 35 | R.C.C. M-25 grade having a minimum compressive strength ( in work test ) 200 kg/ sq. cm in 15 cm cubes at 28 days after mixing and tests conducted in accordance with I.S 456 and I.S 516 using 20 mm and down graded size black hard crusher broken granite chips of approved quality from approved quarry including hoisting, lowering , laying and compacting concrete , watering and curing for 28 days, centring, shuttering , finishing the exposed surface including ceiling smooth, providing grooves , beads where necessary and providing required no of fan hooks as directed including cost, conveyance, royalities and taxes of all the materials and cost of all labour, T&P required for the work etc. complete in all respect including 1% cess as per direction of the Engineer in charge but excluding the cost of M.S rods or Tor steel and binding wire and labour charges for bending, binding and tying the grills as per specification and direction of the Engineer-in-charge. Lofts/shelves Ground Floor |
| 36 | R.C.C. M-25 grade having a minimum compressive strength ( in work test ) 200 kg/ sq. cm in 15 cm cubes at 28 days after mixing and tests conducted in accordance with I.S 456 and I.S 516 using 20 mm and down graded size black hard crusher broken granite chips of approved quality from approved quarry including hoisting, lowering , laying and compacting concrete , watering and curing for 28 days, centring, shuttering , finishing the exposed surface including ceiling smooth, providing grooves , beads where necessary and providing required no of fan hooks as directed including cost, conveyance, royalities and taxes of all the materials and cost of all labour, T&P required for the work etc. complete in all respect including 1% cess as per direction of the Engineer in charge but excluding the cost of M.S rods or Tor steel and binding wire and labour charges for bending, binding and tying the grills as per specification and direction of the Engineer-in-charge. Lofts/shelvesFirst Floor |
| 37 | R.C.C. M-25 grade having a minimum compressive strength ( in work test ) 200 kg/ sq. cm in 15 cm cubes at 28 days after mixing and tests conducted in accordance with I.S 456 and I.S 516 using 20 mm and down graded size black hard crusher broken granite chips of approved quality from approved quarry including hoisting, lowering , laying and compacting concrete , watering and curing for 28 days, centring, shuttering , finishing the exposed surface including ceiling smooth, providing grooves , beads where necessary and providing required no of fan hooks as directed including cost, conveyance, royalities and taxes of all the materials and cost of all labour, T&P required for the work etc. complete in all respect including 1% cess as per direction of the Engineer in charge but excluding the cost of M.S rods or Tor steel and binding wire and labour charges for bending, binding and tying the grills as per specification and direction of the Engineer-in-charge. Stair case Ground Floor |
| 38 | R.C.C. M-25 grade having a minimum compressive strength ( in work test ) 200 kg/ sq. cm in 15 cm cubes at 28 days after mixing and tests conducted in accordance with I.S 456 and I.S 516 using 20 mm and down graded size black hard crusher broken granite chips of approved quality from approved quarry including hoisting, lowering , laying and compacting concrete , watering and curing for 28 days, centring, shuttering , finishing the exposed surface including ceiling smooth, providing grooves , beads where necessary and providing required no of fan hooks as directed including cost, conveyance, royalities and taxes of all the materials and cost of all labour, T&P required for the work etc. complete in all respect including 1% cess as per direction of the Engineer in charge but excluding the cost of M.S rods or Tor steel and binding wire and labour charges for bending, binding and tying the grills as per specification and direction of the Engineer-in-charge. Stair case First Floor |
| 39 | R.C.C. M-25 grade having a minimum compressive strength ( in work test ) 200 kg/ sq. cm in 15 cm cubes at 28 days after mixing and tests conducted in accordance with I.S 456 and I.S 516 using 20 mm and down graded size black hard crusher broken granite chips of approved quality from approved quarry including hoisting, lowering , laying and compacting concrete , watering and curing for 28 days, centring, shuttering , finishing the exposed surface including ceiling smooth, providing grooves , beads where necessary and providing required no of fan hooks as directed including cost, conveyance, royalities and taxes of all the materials and cost of all labour, T&P required for the work etc. complete in all respect including 1% cess as per direction of the Engineer in charge but excluding the cost of M.S rods or Tor steel and binding wire and labour charges for bending, binding and tying the grills as per specification and direction of the Engineer-in-charge. Drain Cover |
| 40 | Cutting, Straightening the bend up M.S./Tor Rods bending, binding welding, jointing if necessary and tying the grills and placing in position as required for R.C.C. works and for providing required no of fan hooks hoisting , lowering, laying including cost,conveyance and taxes of M.S. Rods or Tor steel and binding wires of 18 to 20 guage required for the work bending, binding and tying the grills in all floors ( payment will be made on weight of M.S. rods or Tor steel only and no separate payment will be made towards the weight of binding wires) including 1% cess as per direction of the Engineer-in-charge. Ground Floor |
| 41 | Cutting, Straightening the bend up M.S./Tor Rods bending, binding welding, jointing if necessary and tying the grills and placing in position as required for R.C.C. works and for providing required no of fan hooks hoisting , lowering, laying including cost,conveyance and taxes of M.S. Rods or Tor steel and binding wires of 18 to 20 guage required for the work bending, binding and tying the grills in all floors ( payment will be made on weight of M.S. rods or Tor steel only and no separate payment will be made towards the weight of binding wires) including 1% cess as per direction of the Engineer-in-charge. Boundary wall |
| 42 | Cutting, Straightening the bend up M.S./Tor Rods bending, binding welding, jointing if necessary and tying the grills and placing in position as required for R.C.C. works and for providing required no of fan hooks hoisting , lowering, laying including cost,conveyance and taxes of M.S. Rods or Tor steel and binding wires of 18 to 20 guage required for the work bending, binding and tying the grills in all floors ( payment will be made on weight of M.S. rods or Tor steel only and no separate payment will be made towards the weight of binding wires) including 1% cess as per direction of the Engineer-in-charge. First Floor |
| 43 | Cutting, Straightening the bend up M.S./Tor Rods bending, binding welding, jointing if necessary and tying the grills and placing in position as required for R.C.C. works and for providing required no of fan hooks hoisting , lowering, laying including cost,conveyance and taxes of M.S. Rods or Tor steel and binding wires of 18 to 20 guage required for the work bending, binding and tying the grills in all floors ( payment will be made on weight of M.S. rods or Tor steel only and no separate payment will be made towards the weight of binding wires) including 1% cess as per direction of the Engineer-in-charge. Second Floor |
| 44 | Fly Ash brick masonary in C:M (1:6) using 25cmx12cmx8 cm size bricks having crushsing strength of not less than 75 Kg. per sq.cm. including splays cutting, circular, mouldings, and corbelling , champhering and similar such type of work , watering and curing etc . complete including cost , conveyance, royalities and taxes of all materials and cost of all labour with T&P required for the work etc. complete including 1% cess and as per the specification as directed by the Engineer-in-charge. In Super structure Ground Floor |
| 45 | Fly Ash brick masonary in C:M (1:6) using 25cmx12cmx8 cm size bricks having crushsing strength of not less than 75 Kg. per sq.cm. including splays cutting, circular, mouldings, and corbelling , champhering and similar such type of work , watering and curing etc . complete including cost , conveyance, royalities and taxes of all materials and cost of all labour with T&P required for the work etc. complete including 1% cess and as per the specification as directed by the Engineer-in-charge. In Super structure Boundary wall |
| 46 | Fly Ash brick masonary in C:M (1:6) using 25cmx12cmx8 cm size bricks having crushsing strength of not less than 75 Kg. per sq.cm. including splays cutting, circular, mouldings, and corbelling , champhering and similar such type of work , watering and curing etc . complete including cost , conveyance, royalities and taxes of all materials and cost of all labour with T&P required for the work etc. complete including 1% cess and as per the specification as directed by the Engineer-in-charge. In Super structure First Floor |
| 47 | Fly Ash brick masonary in C:M (1:6) using 25cmx12cmx8 cm size bricks having crushsing strength of not less than 75 Kg. per sq.cm. including splays cutting, circular, mouldings, and corbelling , champhering and similar such type of work , watering and curing etc . complete including cost , conveyance, royalities and taxes of all materials and cost of all labour with T&P required for the work etc. complete including 1% cess and as per the specification as directed by the Engineer-in-charge. In Super structure Second Floor |
| 48 | 20mm thick Cement plaster in C.M. (1:4) in grading plaster over roof slab including cost of all labour, materials etc. complete in all respect including 1% cess as per direction of Engineer-in-charge. First Floor |
| 49 | 20mm thick Cement plaster in C.M. (1:4) in grading plaster over roof slab including cost of all labour, materials etc. complete in all respect including 1% cess as per direction of Engineer-in-charge. Second Floor |
| 50 | 12mm thick Cement plaster in C.M (1:4) over brick work including cement punning and bitumen painting over top of wall finished smooth including watering curing and scaffolding with cost, conveyance, royalty, taxes of all the materials required for the work with all labour, T&P and cess etc. complete in all respect as per specification and direction of the Engineer-in-charge.Ground Floor |
| 51 | 12mm thick Cement plaster in C.M (1:4) over brick work including cement punning and bitumen painting over top of wall finished smooth including watering curing and scaffolding with cost, conveyance, royalty, taxes of all the materials required for the work with all labour, T&P and cess etc. complete in all respect as per specification and direction of the Engineer-in-charge.First Floor |
| 52 | 12mm thick Cement plaster in C.M (1:4) over brick work including cement punning and bitumen painting over top of wall finished smooth including watering curing and scaffolding with cost, conveyance, royalty, taxes of all the materials required for the work with all labour, T&P and cess etc. complete in all respect as per specification and direction of the Engineer-in-charge.Second Floor |
| 53 | 16 mm thick cement plaster in C.M. (1:6) over brick masonry finished smooth after racking out of the joints including watereing and curing with cost, conveyance, royality and taxes of all materials and cost of all labour and T&P required for the work including 1% cess as directed by the Engineer-in-charge. Ground Floor |
| 54 | 16 mm thick cement plaster in C.M. (1:6) over brick masonry finished smooth after racking out of the joints including watereing and curing with cost, conveyance, royality and taxes of all materials and cost of all labour and T&P required for the work including 1% cess as directed by the Engineer-in-charge. Boundary wall |
| 55 | 16 mm thick cement plaster in C.M. (1:6) over brick masonry finished smooth after racking out of the joints including watereing and curing with cost, conveyance, royality and taxes of all materials and cost of all labour and T&P required for the work including 1% cess as directed by the Engineer-in-charge. First Floor |
| 56 | 16 mm thick cement plaster in C.M. (1:6) over brick masonry finished smooth after racking out of the joints including watereing and curing with cost, conveyance, royality and taxes of all materials and cost of all labour and T&P required for the work including 1% cess as directed by the Engineer-in-charge. Second Floor |
| 57 | 12 mm thick cement plaster in C.M. (1:6) over brick masonry finished smooth after racking out of the joints including watereing and curing with cost, conveyance, royality and taxes of all materials and cost of all labour and T&P required for the work including 1% cess as directed by the Engineer-in-charge. Ground Floor |
| 58 | 12 mm thick cement plaster in C.M. (1:6) over brick masonry finished smooth after racking out of the joints including watereing and curing with cost, conveyance, royality and taxes of all materials and cost of all labour and T&P required for the work including 1% cess as directed by the Engineer-in-charge. Boundary wall |
| 59 | 12 mm thick cement plaster in C.M. (1:6) over brick masonry finished smooth after racking out of the joints including watereing and curing with cost, conveyance, royality and taxes of all materials and cost of all labour and T&P required for the work including 1% cess as directed by the Engineer-in-charge. First Floor |
| 60 | 12 mm thick cement plaster in C.M. (1:6) over brick masonry finished smooth after racking out of the joints including watereing and curing with cost, conveyance, royality and taxes of all materials and cost of all labour and T&P required for the work including 1% cess as directed by the Engineer-in-charge. Second Floor |
| 61 | Wall priming one coat with approved primer with brush to wall surface including all cost, conveyance, taxes of all the materials , all labour and T&P required for the work etc. complete including 1% cess as per direction of the Engineer-in-charge.Ground Floor |
| 62 | Wall priming one coat with approved primer with brush to wall surface including all cost, conveyance, taxes of all the materials , all labour and T&P required for the work etc. complete including 1% cess as per direction of the Engineer-in-charge.First Floor |
| 63 | Wall priming one coat with approved primer with brush to wall surface including all cost, conveyance, taxes of all the materials , all labour and T&P required for the work etc. complete including 1% cess as per direction of the Engineer-in-charge. Second Floor |
| 64 | Finishing Surface of walls with cement based wall putty (water base)of approved make and finished smooth and even surface to receive painting including cost of scaffolding, staging charges with cost of all materials taxes,labour etc.Complete in all respect as per specification and direction of the engineer-in-charge. Ground Floor |
| 65 | Finishing Surface of walls with cement based wall putty (water base)of approved make and finished smooth and even surface to receive painting including cost of scaffolding, staging charges with cost of all materials taxes,labour etc.Complete in all respect as per specification and direction of the engineer-in-charge. First Floor |
| 66 | Distempering two coats to wall with approved distemper of approved shade ncluding cost, conveyance and taxes of all the materials, labour etc complete including 1% cess as per specification and direction of the Engineer-in-charge. Ground Floor |
| 67 | Distempering two coats to wall with approved distemper of approved shade ncluding cost, conveyance and taxes of all the materials, labour etc complete including 1% cess as per specification and direction of the Engineer-in-charge. First Floor |
| 68 | Distempering two coats to wall with approved distemper of approved shade ncluding cost, conveyance and taxes of all the materials, labour etc complete including 1% cess as per specification and direction of the Engineer-in-charge. Second Floor |
| 69 | Weather coat two coats including cost, conveyance, taxes of all materials all labour and T & P required for the work etc complete including 1% cess as per direction of the Engineer in charge.Ground Floor |
| 70 | Weather coat two coats including cost, conveyance, taxes of all materials all labour and T & P required for the work etc complete including 1% cess as per direction of the Engineer in charge. First Floor |
| 71 | Weather coat two coats including cost, conveyance, taxes of all materials all labour and T & P required for the work etc complete including 1% cess as per direction of the Engineer in charge. Second Floor |
| 72 | Finishing walls with water proofing cement paint of approved shade on new work two coats to give an even shade with cost, conveyance, taxes of all the materials required for the work and labour, T&P and cess etc. complete in all respect as per specification and direction of the Engineer-in-charge. Boundary wall |
| 73 | Providing, fitting and fixing Steel Angle Iron Door frame manufactured from standard rolled steel angle section 40 mmx 40 mmx 6 mm size with cornered of the frame duly metered and electrically welded with fish tailed hold fasts made out of M.S. flats of size 200 mm x 50 mm x 30 mmx 5 mm thick welded to the frame at the rate of 6 nos per frame with 10 mm dia M.S round bar to be welded at the bottom at the bay with M.S. hinges of size 100 mm & 14SWG thick at the rate of 3 nos & 50 mm size one no for single leaf shutter aldrop, staple & tower bolt hinges duly welded to the frame with one coat of anticorrosive red oxide zinc chrome primer including 1% cess as per direction of Engineer in charge. Ground Floor |
| 74 | Providing, fitting and fixing Steel Angle Iron Door frame manufactured from standard rolled steel angle section 40 mmx 40 mmx 6 mm size with cornered of the frame duly metered and electrically welded with fish tailed hold fasts made out of M.S. flats of size 200 mm x 50 mm x 30 mmx 5 mm thick welded to the frame at the rate of 6 nos per frame with 10 mm dia M.S round bar to be welded at the bottom at the bay with M.S. hinges of size 100 mm & 14SWG thick at the rate of 3 nos & 50 mm size one no for single leaf shutter aldrop, staple & tower bolt hinges duly welded to the frame with one coat of anticorrosive red oxide zinc chrome primer including 1% cess as per direction of Engineer in charge. First Floor |
| 75 | Providing, fitting and fixing Steel Angle Iron Door frame manufactured from standard rolled steel angle section 40 mmx 40 mmx 6 mm size with cornered of the frame duly metered and electrically welded with fish tailed hold fasts made out of M.S. flats of size 200 mm x 50 mm x 30 mmx 5 mm thick welded to the frame at the rate of 6 nos per frame with 10 mm dia M.S round bar to be welded at the bottom at the bay with M.S. hinges of size 100 mm & 14SWG thick at the rate of 3 nos & 50 mm size one no for single leaf shutter aldrop, staple & tower bolt hinges duly welded to the frame with one coat of anticorrosive red oxide zinc chrome primer including 1% cess as per direction of Engineer in charge. Second Floor |
| 76 | Providing, fitting and fixing Steel Angle Iron Door frame manufactured from standard rolled steel angle section 40 mmx 40 mmx 6 mm size with cornered of the frame duly metered and electrically welded with fish tailed hold fasts made out of M.S. flats of size 200 mm x 50 mm x 30 mmx 5 mm thick welded to the frame at the rate of 6 nos per frame with 10 mm dia M.S round bar to be welded at the bottom at the bay with M.S. hinges of size 100 mm & 14SWG thick at the rate of 3 nos & 50 mm size one no for single leaf shutter aldrop, staple & tower bolt hinges duly welded to the frame with one coat of anticorrosive red oxide zinc chrome primer including 1% cess as per direction of Engineer in charge. Boundary wall |
| 77 | Providing, fitting and fixing Steel Angle Iron window frame with M.S grill manufactured from standard rolled steel angle section 40 mmx 40 mmx 6 mm cornered of the frame duly metered and electrically welded with fish tailed hold fasts made out of M.S. flats of size 200 mm x 50 mm x 30 mmx 5 mm thick at the rate of 4 nos per frame with M.S hinges of size 75 mm & 14 SWG thick at the rate of 3 nos for each single leaf shutter tower bolt ring & m.s grill made of 19 mm x 5 mm flat properly welded to the window frame with one coat of anticorrosive red oxide zinc chrome primer including 1% cess as per direction of Engineer in charge. Ground Floor |
| 78 | Providing, fitting and fixing Steel Angle Iron window frame with M.S grill manufactured from standard rolled steel angle section 40 mmx 40 mmx 6 mm cornered of the frame duly metered and electrically welded with fish tailed hold fasts made out of M.S. flats of size 200 mm x 50 mm x 30 mmx 5 mm thick at the rate of 4 nos per frame with M.S hinges of size 75 mm & 14 SWG thick at the rate of 3 nos for each single leaf shutter tower bolt ring & m.s grill made of 19 mm x 5 mm flat properly welded to the window frame with one coat of anticorrosive red oxide zinc chrome primer including 1% cess as per direction of Engineer in charge. First Floor |
| 79 | Supplying and fitting and fixing of two track UPVC sliding window of approved make with 6mm thick glass of approved make with 6mm thick glass of approved quality complete wi.(rate of schedule of rates page 235 sI no 12) Ground Floor |
| 80 | Supplying and fitting and fixing of two track UPVC sliding window of approved make with 6mm thick glass of approved make with 6mm thick glass of approved quality complete wi.(rate of schedule of rates page 235 sI no 12) First Floor |
| 81 | Painting two coats with approved paint over a coat of primer of any approved shade with cost, conveyance , taxes of all materials, all labour and T&P requred for the work including the cost of primer, all other materials etc complete including 1% cess as per direction of the Engineer in charge. Ground Floor |
| 82 | Painting two coats with approved paint over a coat of primer of any approved shade with cost, conveyance , taxes of all materials, all labour and T&P requred for the work including the cost of primer, all other materials etc complete including 1% cess as per direction of the Engineer in charge. Boundary wall |
| 83 | Painting two coats with approved paint over a coat of primer of any approved shade with cost, conveyance , taxes of all materials, all labour and T&P requred for the work including the cost of primer, all other materials etc complete including 1% cess as per direction of the Engineer in charge.First Floor |
| 84 | Painting two coats with approved paint over a coat of primer of any approved shade with cost, conveyance , taxes of all materials, all labour and T&P requred for the work including the cost of primer, all other materials etc complete including 1% cess as per direction of the Engineer in charge.Second Floor |
| 85 | Providing and fixing vitrified tiles in floors, treads of steps and landing on 20mm th bed of cement mortar (1:4) (1 cement:4 sand) joined with neat cement slurry mixed with pigment to match the shade of tiles including rubbing, polishing including cost of tiles, conveyance, taxes & labour, T&P and cess etc. complete in all respect as per specification and direction of the Engineer-in-charge Ground Floor |
| 86 | Providing and fixing vitrified tiles in floors, treads of steps and landing on 20mm th bed of cement mortar (1:4) (1 cement:4 sand) joined with neat cement slurry mixed with pigment to match the shade of tiles including rubbing, polishing including cost of tiles, conveyance, taxes & labour, T&P and cess etc. complete in all respect as per specification and direction of the Engineer-in-charge First Floor |
| 87 | Providing and fixing glazed tiles in dados, skirting and rises of steps on 12mm th cement plaster (1:3) (1cement:3sand) joined with neat cement slurry mixed with pigment to match the shade of tiles, rubbing, polishing including cost of tiles, conveyance, taxes & labour, T&P and cess etc. complete in all respect as per specification and direction of the Engineer-in-charge Ground Floor |
| 88 | Providing and fixing glazed tiles in dados, skirting and rises of steps on 12mm th cement plaster (1:3) (1cement:3sand) joined with neat cement slurry mixed with pigment to match the shade of tiles, rubbing, polishing including cost of tiles, conveyance, taxes & labour, T&P and cess etc. complete in all respect as per specification and direction of the Engineer-in-charge First Floor |
| 89 | Supplying fitting and fixing of Stain less steel of 304 grade in hand railing using 50mm dia of 2mm thick circular pipe with balustrade of size 32mm x 32mm x 2mm @ 0.90mtr c/c and stain less square pipe bracing of size 32mm x 32mm x 2mm in 3 rows in stair case as per approved design and specification, buffing, polishing etc. including cost of all materials, taxes, labour, T&P, cess, and hire charges of drilling machine, labour charges etc. complete in all respect as per specification and direction of the Engineer-in-charge Ground Floor |
| 90 | Supplying fitting and fixing of Stain less steel of 304 grade in hand railing using 50mm dia of 2mm thick circular pipe with balustrade of size 32mm x 32mm x 2mm @ 0.90mtr c/c and stain less square pipe bracing of size 32mm x 32mm x 2mm in 3 rows in stair case as per approved design and specification, buffing, polishing etc. including cost of all materials, taxes, labour, T&P, cess, and hire charges of drilling machine, labour charges etc. complete in all respect as per specification and direction of the Engineer-in-charge First Floor |
| 91 | Providing and fixing rain water down pipe with necessary bend shoes and heads including cost of 75mm dia earthen pipe, clamps and nails etc. with all cost, conveyance, taxes of all the materials required for the work with all labour, T&P and cess etc. complete in all respect as per specification and direction of the Engineer-in-chargeGround Floor |
| 92 | Providing and fixing rain water down pipe with necessary bend shoes and heads including cost of 75mm dia earthen pipe, clamps and nails etc. with all cost, conveyance, taxes of all the materials required for the work with all labour, T&P and cess etc. complete in all respect as per specification and direction of the Engineer-in-charge First Floor |
| 93 | EI WORK Recessed wiring to light point/fan point/exhaust pont/call bell pont with 1.5 sq.mm FR PVC insulated single core multistrand copper conductor of ISI marked with 20 mm dia non-metalic PVC flexible conduit with 5 Amp,one way modular switch ISI marked and ceiling rose ISI marked mounted on Modular G.I. box having front bakelite cover of suitable size , MS box with 1.5 sq.mm FR PVC insulated single core multistrand copper conductor as earth wire including all accesories and connection as per direction of Engineer in Charge. ( Make of wire - Polycab/Finolex/ L&T / Anchor / Havells / V Guard/ KEI/ Great White) Modular Type -do- (Gr.A) (1.1.1-1.24.2) |
| 94 | -do- (Gr.B) (1.1.2-1.24.2) |
| 95 | -do- (Gr.C) (1.1.3-1.24.2) |
| 96 | S/F of M.S. Box for 2 Module 18 swg |
| 97 | S/F of M.S. Box for 4 Module 18 swg |
| 98 | S/F of M.S. Box for 6 Module 18 swg |
| 99 | S/F of M.S. Box for 8 Module 18 swg |
| 100 | S/F of M.S. Box for 12 Module 18 swg |
| 101 | S/F of 3 pin 5/6 A.F.T switch and.Socket on existing board (Modular type) (1.25.1+1.25.4) |
| 102 | S/Fof 6 module M.S. Box with Bakelite cover (Modular Type) on surface or in recess including providing and fixing of 2 nos 3 pin 5/6 amp. Socket out let 5/6amp. Piano type modular switch,connection,painting etc. as required (1.24.4 +2 x (1.25.1+1.25.4) |
| 103 | S/F of Power point with 4 modular metal box with modular base & cover in recess including providing and fixing of 6 pin 15/16 amp. piano type Modular switch & Socket, connection, painting etc as required(1.24.2+1.25.5+1.25.5) |
| 104 | S/F of Power point with 4 modular metal box with modular base & cover in recess including providing and fixing of 6 pin 15/16 amp. piano type Modular switch & Socket, connection, painting etc as required(1.24.2+1.25.5+1.25.5) for Inverter Connection |
| 105 | S/F of A.C.Starter 20Amp with 2 module Box.(Make Havells/Equivalent) |
| 106 | S/F of 15A Socket on 2 module for AC |
| 107 | S/F of computer board consisting of 3 nos. of 5 amp modular plug and modular switch and 1no. Of 6 amp Mini MCB, complete with wiring on 12 modular type M.S.box with modular cover. |
| 108 | Wiring for circuit/sub main alongwith earth wire with following sizes of PVC insulated single core multistrand copper conductor with ISI marked conforming to IS-694/1990 in 20 mm dia non metallic heacy duty flexible conduit 1.6 mm in recessed PVC conduit as required (make of wire-Polycab/Finolex/L&T/Anchor/Havels/V-Guard/KEI/Great White).2x1.5 sqmm + 1 x 1.5 sqmm( 1 .8.1) |
| 109 | -do- 2 x 2.5 sqmm + 1 x 1.5 sqmm (1.8.2) |
| 110 | -do- 2x4 sqmm + 1 x 1.5 sqmm (1.8.3) |
| 111 | -do- 2x6 sqmm + 1 x 2.5 sqmm (1.8.3) |
| 112 | Inverter wiring (1x1.5smm) Copper wire (1.19.1) |
| 113 | S/F of 5 to 32 Amp rating 240 Volt \\"B\\" series MCB for lighting and other loads in the existing MCB Distribution Board ISI marked complete with connection, testing and commissioning etc. as required (2.6.1) |
| 114 | S/F of 32 Amp rating \\"C\\" Series DP MCB (Make: L&T/Havells/C&S/Equivalent) |
| 115 | S/F of 63A ICDP main switch with MS box of 250mmx300mmx60mm deep ( (2.15A)+(1.24.16 ) |
| 116 | S/F of MCB 8 Way Double Door (2.3.6) |
| 117 | S/F of Call bell/Buzzer(Ding dong type) ISI marked suitable for DC/AC single phase 230 volts complete as required. (1.30) |
| 118 | S/F of batten holder BK angle holder ISI marked including connection etc. insulated of ceiling rose(1.29- 1.28) |
| 119 | Earthing with G.I. Earth pipe 3 mtr Long 40mm dia ISI marked including accessories & providing masonary enclosure with cover plate having locking arrangement & watering pipe with charcoal & salt as required (3.2) |
| 120 | Supply & laying 6 SWG G.I. wire in recess for loop earthing as required (3.17) |
| 121 | S/F of 1200mm A.C. Ceiling fan (1Star) with all accessories and connections with out fan regulator (Make:Usha-Striker One/Neo/Crompton- highspeed/Havells-Samrat ES/Anchor- Turbo Speed Star/Orient-Summer Breeze Pro/ Great White-ALDOUS/Pollycab-Vital HS) |
| 122 | S/F of Fan hook S, Type on ceiling. |
| 123 | S/F of step type modular fan regulator |
| 124 | Supply of instalation, Testing commissioning of 13 Watt. LED bulb |
| 125 | S/F of 300 Exhaust fan with all accessoriesand connections (Make Usha-Aero Clean Plus DBB/ Polycab-Fresh on DBB/ Cropmton-Trans Air12\\" reversible/ Havells-Ventil Air DS(HS)/ Anchor-Anmol Delus R/ Orient-Power Flow DBB |
| 126 | S/F of 10 Watt Bulk Head (Make-Havells/Cromton or Equivalent) |
| 127 | S/F of 18-25 wt. LED single strip tube. Light fittingwith all accessories & connection (make Havels/HPL/Crompton/Polycab/PAC) |
| 128 | Supply & Fixing of 60 Watt single L.E.D street light fitting with LED & Electrinic driver including all accessories and connections (Make:Crompton/Phillips/HPL/Polycab/Havells) |
| 129 | S/F OF 900 VA Invertor with 1 no 180Ah Tubular Battery including trally arrangement (Make:V Guard/Luminous/Microtek/Excide) |
| 130 | PH Works :- Supplying all materials labour T & P and filling F&P with river sand well watered and rammed including conveyance of all materials to worksite,payment of royality,taxes etc. all complete as per the direction of E.I.C. |
| 131 | Supplying all materials,labour,T&P and fitting & fixing of 4.0kgf/cm2 U-PVC soil waste ventilating pipes and fitting of the following OD conforming to ISI No.13592/ 1992 to walls with nails bobbins and wooden plugs or earth work in excavation in all kinds of soil for laying in trenche including jointing with supply of approved rubber lubricant by non-heat application method/as per manufactures specification including tasting and refilling and trenches as per direction of E.I.C.(a)110mm dia pipe |
| 132 | Supplying all materials,labour,T&P and fitting & fixing of 4.0kgf/cm2 U-PVC soil waste ventilating pipes and fitting of the following OD conforming to ISI No.13592/ 1992 to walls with nails bobbins and wooden plugs or earth work in excavation in all kinds of soil for laying in trenche including jointing with supply of approved rubber lubricant by non-heat application method/as per manufactures specification including tasting and refilling and trenches as per direction of E.I.C.(b)75mm dia pipe |
| 133 | Supplying all materials,labour,T&P and fitting & fixing of 4.0kgf/cm2 U-PVC soil waste ventilating pipes and fitting of the following OD conforming to ISI No.13592/ 1992 to walls with nails bobbins and wooden plugs or earth work in excavation in all kinds of soil for laying in trenche including jointing with supply of approved rubber lubricant by non-heat application method/as per manufactures specification including tasting and refilling and trenches as per direction of E.I.C.(c)110mm dia Door cross Tee |
| 134 | Supplying all materials,labour,T&P and fitting & fixing of 4.0kgf/cm2 U-PVC soil waste ventilating pipes and fitting of the following OD conforming to ISI No.13592/ 1992 to walls with nails bobbins and wooden plugs or earth work in excavation in all kinds of soil for laying in trenche including jointing with supply of approved rubber lubricant by non-heat application method/as per manufactures specification including tasting and refilling and trenches as per direction of E.I.C.(d)110mm dia Door Tee |
| 135 | Supplying all materials,labour,T&P and fitting & fixing of 4.0kgf/cm2 U-PVC soil waste ventilating pipes and fitting of the following OD conforming to ISI No.13592/ 1992 to walls with nails bobbins and wooden plugs or earth work in excavation in all kinds of soil for laying in trenche including jointing with supply of approved rubber lubricant by non-heat application method/as per manufactures specification including tasting and refilling and trenches as per direction of E.I.C.(e)110mm dia P Trap |
| 136 | Supplying all materials,labour,T&P and fitting & fixing of 4.0kgf/cm2 U-PVC soil waste ventilating pipes and fitting of the following OD conforming to ISI No.13592/ 1992 to walls with nails bobbins and wooden plugs or earth work in excavation in all kinds of soil for laying in trenche including jointing with supply of approved rubber lubricant by non-heat application method/as per manufactures specification including tasting and refilling and trenches as per direction of E.I.C.(f)110mm dia Plain Trap |
| 137 | Supplying all materials,labour,T&P and fitting & fixing of 4.0kgf/cm2 U-PVC soil waste ventilating pipes and fitting of the following OD conforming to ISI No.13592/ 1992 to walls with nails bobbins and wooden plugs or earth work in excavation in all kinds of soil for laying in trenche including jointing with supply of approved rubber lubricant by non-heat application method/as per manufactures specification including tasting and refilling and trenches as per direction of E.I.C.(g)110mm dia Door Bend |
| 138 | Supplying all materials,labour,T&P and fitting & fixing of 4.0kgf/cm2 U-PVC soil waste ventilating pipes and fitting of the following OD conforming to ISI No.13592/ 1992 to walls with nails bobbins and wooden plugs or earth work in excavation in all kinds of soil for laying in trenche including jointing with supply of approved rubber lubricant by non-heat application method/as per manufactures specification including tasting and refilling and trenches as per direction of E.I.C.(h)110mm dia Offset |
| 139 | Supplying all materials,labour,T&P and fitting & fixing of 4.0kgf/cm2 U-PVC soil waste ventilating pipes and fitting of the following OD conforming to ISI No.13592/ 1992 to walls with nails bobbins and wooden plugs or earth work in excavation in all kinds of soil for laying in trenche including jointing with supply of approved rubber lubricant by non-heat application method/as per manufactures specification including tasting and refilling and trenches as per direction of E.I.C.(i)110mm dia Plain bend |
| 140 | Supplying all materials,labour,T&P and fitting & fixing of 4.0kgf/cm2 U-PVC soil waste ventilating pipes and fitting of the following OD conforming to ISI No.13592/ 1992 to walls with nails bobbins and wooden plugs or earth work in excavation in all kinds of soil for laying in trenche including jointing with supply of approved rubber lubricant by non-heat application method/as per manufactures specification including tasting and refilling and trenches as per direction of E.I.C.(j)110mm dia cowl |
| 141 | Supplying all materials,labour,T&P and fitting & fixing of 4.0kgf/cm2 U-PVC soil waste ventilating pipes and fitting of the following OD conforming to ISI No.13592/ 1992 to walls with nails bobbins and wooden plugs or earth work in excavation in all kinds of soil for laying in trenche including jointing with supply of approved rubber lubricant by non-heat application method/as per manufactures specification including tasting and refilling and trenches as per direction of E.I.C.(k)75mm dia plain Tee |
| 142 | Supplying all materials,labour,T&P and fitting & fixing of 4.0kgf/cm2 U-PVC soil waste ventilating pipes and fitting of the following OD conforming to ISI No.13592/ 1992 to walls with nails bobbins and wooden plugs or earth work in excavation in all kinds of soil for laying in trenche including jointing with supply of approved rubber lubricant by non-heat application method/as per manufactures specification including tasting and refilling and trenches as per direction of E.I.C.(l)75mm dia Door bend |
| 143 | Supplying all materials,labour,T&P and fitting & fixing of 4.0kgf/cm2 U-PVC soil waste ventilating pipes and fitting of the following OD conforming to ISI No.13592/ 1992 to walls with nails bobbins and wooden plugs or earth work in excavation in all kinds of soil for laying in trenche including jointing with supply of approved rubber lubricant by non-heat application method/as per manufactures specification including tasting and refilling and trenches as per direction of E.I.C.(m)75mm dia plain Bend |
| 144 | Supplying all materials,labour,T&P and fitting & fixing of 4.0kgf/cm2 U-PVC soil waste ventilating pipes and fitting of the following OD conforming to ISI No.13592/ 1992 to walls with nails bobbins and wooden plugs or earth work in excavation in all kinds of soil for laying in trenche including jointing with supply of approved rubber lubricant by non-heat application method/as per manufactures specification including tasting and refilling and trenches as per direction of E.I.C.(n)125mm dia CP Grating |
| 145 | Supplying all materials labour T&P and fixing wash down water closet (Anglo Indian water closet)with integral S orP trap to the floor with wooden plug and chromium plated crews including jointing the trap with soil pipe in cm(1:1)etc. all complete as per specification and direction of E.I.C.(a)E.W.C. with S Trap with sheet cover(make- parryware) |
| 146 | Supplying all materials labour T&P and fixing water closet,squatting pan(Indian type WC. pan/Orissa pattern squatting pan) duly embedded in cc(1:5:10)using 4cm hg. metal all complete as per the direction of E.I.C.(a)580mm Orissa pan(make- parryware) |
| 147 | Supplying all materials,labour,T&P and fixing kitchen sink with hole for pillar taps with CI/MS brackets painted white including holes in walls and making good the damages etc. all complete as per P.H. specification and direction of E.I.C.(a)600mmx450mmx200mm Steel sink with 40mm dia CP west,west pipe and brackets.(Mousumi make) |
| 148 | Supplying all materials,labour,T&P and fixing wash basing with hole for pillar taps with CI/MS brackets painted white including holes in walls and making good the damages etc. all complete as per P.H. specification and direction of E.I.C.(a)550mmx400mm W.H.B. with 32mm dia CP west, west pipe,brackets and connection pipe .(make- parryware) |
| 149 | Supplying all materials,labour,T&P and fixing wash basing with hole for pillar taps with CI/MS brackets painted white including holes in walls and making good the damages etc. all complete as per P.H. specification and direction of E.I.C.(b)Pedestrial for W.H.B. (make- parryware) |
| 150 | Supplying all materials,labour T&P and fixing mirror of superior glass mounted on 6mm thick AC sheet or plywood sheet and fixing to wooden plugs with CP screws and washers complete as per PH specification and direction of E.I.C.(a)600mmx450mm B.E Mirror |
| 151 | Supplying all materials,labour T&P and fixing standard size glass shelf with CP brass brackets and guard rail complete fixed to wooden plugs with CP screws as per PH specification and direction of E.I.C.(a)(125x450)mm size glass-shelf with CP Guard rail(Jaquar Make) |
| 152 | Supplying all materials,labour T&P and fixing standard size CP towel rail complete with CP Brass brackets fixed to wooden plugs with CP screws as per PH specification and direction of E.I.C.(a)25mmx600mm long CP towel rail(Jaquar Make) |
| 153 | Supplying all materials,labour T&P and fixing standard size CP towel rail complete with CP Brass brackets fixed to wooden plugs with CP screws as per PH specification and direction of E.I.C.(b)CP Towel Ring(Jaquar Make) |
| 154 | Supplying all materials,labour T&P and fixing standard size CP soap holder complete with CP Brass brackets fixed to wooden plug with CP screws as per P.H. specification and direction of E.I.C. (a)CP Soap holder(Jaquar Make) |
| 155 | Supplying all materials labour T&P and cutting holes through brick/stone masonary walls for taking HCI/PVC and fittings including making good the damages etc. all complete as per PH specification and direction of E.I.C.(a)375mm thick wall |
| 156 | Supplying all materials labour T&P and cutting holes through brick/stone masonary walls for taking HCI/PVC and fittings including making good the damages etc. all complete as per PH specification and direction of E.I.C.250mm thick wall |
| 157 | Supplying all materials labour T&P and cutting holes through brick/stone masonary walls for taking HCI/PVC and fittings including making good the damages etc. all complete as per PH specification and direction of E.I.C.(b)Roof cutting |
| 158 | Supplying all materials labour T&P and fixing Digital tiles in floors,threads, landing on 25mm thick bed of cm(1:1)jointed with neat cement slurry mixed with pigment to match the shades of the tiles including rubbing & polishing complete including cost of precast tiles etc. all complete as per specification and directiof E.I.C. (i)Ground Floor:- |
| 159 | Supplying all materials labour T&P and fixing Digital tiles in floors,threads, landing on 25mm thick bed of cm(1:1)jointed with neat cement slurry mixed with pigment to match the shades of the tiles including rubbing & polishing complete including cost of precast tiles etc. all complete as per specification and directiof E.I.C. (ii)First Floor:- |
| 160 | Supplying all materials,labour T&P and providing 12mm thicks CP(1:3)with punning on brick/stone work including watering,curing conveyance of all materials to worksite,payment of royality,taxes etc. all complete as per specification and direction of E.I.C. |
| 161 | Supplying all materials labour T&P and fixing porcelain glazed tiles in dados skirting and risers of steps on 12mm thick CP(1:3)jointed with neat cement slurry mixed with pigments to match the shade of tiles including rubbing & polishing complete including cost of tiles etc. all complete as per spcificaiton and direction of E.I.C.(i)Ground Floor:- |
| 162 | Supplying all materials labour T&P and fixing porcelain glazed tiles in dados skirting and risers of steps on 12mm thick CP(1:3)jointed with neat cement slurry mixed with pigments to match the shade of tiles including rubbing & polishing complete including cost of tiles etc. all complete as per spcificaiton and direction of E.I.C.(ii)First Floor:- |
| 163 | Factory made FRP(alternately called GRP)door frame of size 75mmx100mm fabricated using E-glass chopped strand mat(CSM)U.V stabilised Inopthalic Gelcoat and impregnated with Inopthalic resin.The thickness of the GRP skins shall not be less than 2.00mm.The doorframe consist of four segments which are provided with plug-in-socket arrangement in-situ in the mould.The segments are plugged in and are joined together by means of screw.The GRP frame shall be provided with wooden reinforcement on six locations for high screw holding capacity for for fixing metallic hold fast and shall be consolidated by filling with medium density foam/plaster of paris with fibre reinforcement,Six numbers of 260mmx25mmx5mm size 'S' shaped MS flat hold fast shall be provided with the frame.The material and process for manufacturing the door frames shall conform to RV-TIFAC composites Design centre's standards & specifications. The finish of door frame will be plain colour white/Ivory/Beige/Light grey/Golden brown/ Mahogany/Teak wood/sand stone/Champagne/Pastel blue or any other colour using high quality pigments complete in all respect as per specification and direction of the E.I.C.(a)Frame:- |
| 164 | Factory made single leaf rigid FRP(alternately called GRP) sandwich composite doorshutter of 32mm thick laminated with two GRP skins with wood grain finish fabricated using UV-stabilised Isopthalic Gelcoat & one layer of 450gsm E-glass chopped strand Mat(CSM)impregnated with orthopthalic palyester resin.The thickness of the skins shall not be less than 1.50mm Expanded Polystyrone(EPS)structural foam panel of 29mm thickn ess and a density of 20kg/cu.mtr shall be used as core material.wooden reinforcement made of seasoned salwood block of cross section not less than 28mmx32mm and also necessary salwood reinforcements for fitting the metal fittings such as tower bolts,aldrops,handles etc shall be provided.A structural adhesive compatible with(EPS)foam shall be used for bending the core material,the salwood reiforcements and the skins.the material and process for manufacturing the doorshutters shall conform to RV-TIFAC composites Design centre's standards and specifications and the door shutters tested in conformation to IS:4020-1998.The finish of door shutter will be plain colour white/Ivory/Beige/Light grey/Mahogany/Teak wood or any other colour using high quality pigments.Three heavy whight mild steel but hinges type-I(ISI marked) size 100mm are to be fitted on one side of shutter. (a)Shutter:- |
| 165 | S.D. PORTION:- Supplying all materials labour T&P and constructing gully trap chamber of the following inside size with 8cm thick RCC precast cover slab in cc(1:1½:3)using 12mm size h.g. chips,foundation concrete(1:3:6)using 40mm size hg metal on bed and around trap,KB brick in cm(1:6)in F&P and inside 12mm thick CP(1:3) finished with a floating coat of neat cement including fixing 100mm size HCI gully trap and grating etc.all complete as per approved drawing specification and direction of E.I.C.(a)Inside size 250mmx250mm |
| 166 | Supplying all materials labour T&P and constructing inspection chamber of the following sizes with cc(1:3:6)using 40mm size hg metal on bed,1stclass KB brick work in cm(1:6)moulding & shaping the channel inside and benching with cc(1: 1.5:3)using 12mm size hg chips,12mm thick CP(1:3)with punning to inside, cement flush pointin(1:3)to outside,RCC cover slab in cc(1:1.5:3)using 12mm size hg chips with RCC man hole cover,e.w in excavation in all kinds of soil and refilling the cavity around the chamber including watering,curing,conveyance of all materials to site,payment of royality,taxes etc. all complete as per approved specification and direction of E.I.C.(a)Inside size 760mmx760mmx460mm |
| 167 | Supplying all labour T&P and constructing soakway pit of the following sizes with dry brick walling from bottom upto invert of inlet pipe and 1st class KB brick work in cm(1:6)for the remaining height at top,12mm thick CP(1:4)inside and outside over masonary brick work gravel packing in the rear of well steining RCC cover slab in cc(1:1.5:3)using 12mm size hg chips fitted handles including e.w. in openwell excavation in all kinds of soil and refilling the cavity around the pit & painting the iron work,watering,curing,conveyance of all meterails to work site, payment of royality,taxes etc. all complete as per approved drawing specification and direction of E.I.C. |
| 168 | Supplying all materials labour T&P and laying PVC pipe sewer line,Grade-A of the following internal dia in trenches (to level or slope)and jointing with gasket & stiff mixture or cm(1:1),cc(1:3:6)with 40mm size h.g. metal on bed of the trench and hunching or allround concrete encasing with cc(1:4:8)using 40mm size hg. metal including curing,conveyance to workside,payment of royality,taxes etc and testing all complete as per approved drawing,specification and direction of E.I.C. |
| 169 | 15 USER SEPTIC TANK:- Earth work in all kinds of soil in excavation of foundation trenches within 50m initial lead including rough dressing and breaking clods to maximum 5cm to 7cm and laying in layers not exceeding 0.30m in depth as per direction of E.I.C.(a) Initial lift upto 1.50m |
| 170 | 15 USER SEPTIC TANK:- Earth work in all kinds of soil in excavation of foundation trenches within 50m initial lead including rough dressing and breaking clods to maximum 5cm to 7cm and laying in layers not exceeding 0.30m in depth as per direction of E.I.C.(b) From 1.50m to 3.00m depth |
| 171 | Supplying all materials labour T&P and providing cc(1:3:6)using 4cm h.g metal including watering,curing,conveyance of all materials to work site,payment of royality,taxes etc. all complete as per specification and direction of E.I.C. |
| 172 | Supplying all materials labour T&P and providing cc(1:1.5:3)using 12mm hg chips including watering,curing,conveyance of all materials to worksite,payment of royality,taxes etc. all complete as per specification and direction of E.I.C. |
| 173 | Supplying all materials labour T&P and providing brick work with flyash Bricks in cm(1:4)F&P having crushing strength not less than 75kg/cm2 with dimensional tolerance +/-8% including watering,curing conveyance all materials to worksite payment of royality taxes etc. all complete as per specification direction of E.I.C. |
| 174 | Supplying all materials labour T&P and providing rigid & smooth centering & shuttering for RCC works including false work and dismantling them after casting including conveyance of all materials to worksite,payment of royality,taxes etc. all complete as per specification and direction of E.I.C. |
| 175 | Supplying all materials labour T&P and providing MS reinforcement for RCC works including cutting,bending,binding and tying the grills and placing in position including cost of binding wire 18 to 20 gauge conveyance of all materials to worksite,payment of royality,taxes etc. all complete as per specification and direction of E.I.C. |
| 176 | Supplying all materials labour T&P and providing RCC(1:1.5:3)using 12mm hg chips including hoisting,laying,watering,curing,conveyance of all materials to work site,payment of royality,taxes etc. all complete as per specification and direction of E.I.C. |
| 177 | Supplying all materials labour T&P and fixing MS step iron in 12mm dia MS steel bar and fixing into walls of septic tank duly embedded in cc(1:3:6) all complete as per PH. specification and direction E.I.C. |
| 178 | Supplying all materials labour T&P and fixing of RCC baffle wall precast with cc(1:1.5:3)using 12mm b.h.g. chips and fitted to septic tank as per P.H. specification and direction E.I.C. |
| 179 | Supplying all materials,labour,T&P and providing fitting & fixing PVC Tee in wall including fitting the necessary with cc(1:1.5:3)with 12mm size hg chips all complete including watering,curing,conveyance of all materials to worksite, payment of royality,taxes etc. all complete as per specification and direction of E.I.C.(a) 110mmx110mm x110mm PVC Tee |
| 180 | Supplying all materials labour T&P and Providing cement flush pointing(1:3) to brick masonary including watering,curing,conveyance of all materials to work site etc. all complete as per specification and direction of E.I.C. |
| 181 | Supplying all materials labour T&P and providing 500x500x100mm thick RCC precast MH cover in cc(1:1.5:3)using 12mm hg chips placing the cover on the MH/ST & finishing smooth all complete as per specification and direction of E.I.C. |
| 182 | Filling in F&P with excavated materials including watering and ramming as per direction of E.I.C. 19.9156cum-(1.3579+0.9053+1.3579+5.225+7.50)cum=3.5695cum |
| 183 | W/S SUPPLY PORTION:- Supplying all materials,labour,T&P and construction of masonry staging with providing 1stclass KB brickwork in cm(1:6)of 0.46m height in staging,12mm CP in cm(1:6),RCC Beam of 0.25mx0.30mx2.60m in cc(1:1.5:3)using 12mm size HG chips including centering,shuttering,bending & binding of rod etc watering, curring,conveyance of all materials to worksite,payment of royalty,taxes etc all complete as per P.H specification and direction of the E.I.C. (a)Stagging for 1000Ltr. Storage Tank (1st. Floor) |
| 184 | Supplying all materials,labour,T&P and Fitting and Fixing of Rotational moulded polythene cylindrical vertical water storage tank conforming to 12701/1996 including cutting holes through the tank and fixing mild steel tubes and fittings and providing extra sockets and jamnuts including hoisting upto a height of 5mtr above G.L and placing the tank in required position including conveyance of all materials to work site,payment of royalty,taxes etc all complete as per P.H specification and direction of the E.I.C.(a)1000Ltr. Capacity Water Storage Tank (1st. Floor) |
| 185 | Supplying all materials,labour,T&P and fitting & fixing 10ltr. capacity low level flushing cystern with a pair of ms clamps complete with fittings such as syphonic arrangements 15mm nominal size PVC ball valve with polythene float,PVC handle,union and couplings for connection with inlet,outlet and overflow pipes, 32mm dia CP flush bend,15mm dia,PVC inlet connection pipe including cutting holes and making good the same and connecting the flush bend with cystern and closet and connecting inlet pipe with supply main etc. all connecting inlet pipe with supply main etc. all complete as per specification and direction of E.I.C. (a)10Lit. PVC Cistern(Parryware make) |
| 186 | Supplying all materials,labour,T&P providing and fixing to wall or ceiling and floor PVC pipe conforming to ASTM-D-1785/89 (sch-80) and pipe fitting of the following nominal bore with clamps including making good the wall,ceiling and floor testing all complete as per specification and direction of E.I.C.(a)25mm dia PVC pipe(External |
| 187 | Supplying all materials,labour,T&P providing and fixing to wall or ceiling and floor PVC pipe conforming to ASTM-D-1785/89 (sch-80) and pipe fitting of the following nominal bore with clamps including making good the wall,ceiling and floor testing all complete as per specification and direction of E.I.C.(b)20mm dia PVC pipe(Internal) |
| 188 | Supplying all materials,labour,T&P providing and fixing to wall or ceiling and floor PVC pipe conforming to ASTM-D-1785/89 (sch-80) and pipe fitting of the following nominal bore with clamps including making good the wall,ceiling and floor testing all complete as per specification and direction of E.I.C.(c)15mm dia PVC pipe(Internal) |
| 189 | Supplying all materials,labour,T&P cutting holes through brick/stone masonry works including making good the damages in cm(1:4)for taking GI/PVC pipe & fitting etc. all complete as per PH specification and direction of E.I.C.(a)250mm thick wall (Ground Floor) |
| 190 | Supplying all materials,labour,T&P cutting holes through brick/stone masonry works including making good the damages in cm(1:4)for taking GI/PVC pipe & fitting etc. all complete as per PH specification and direction of E.I.C.(b)250mm thick wall (1st. Floor) |
| 191 | Supplying all materials,labour,T&P cutting holes in RCC floors,roofs etc up to 19cm thick for passing GI/PVC pipes fittings and reparing the holes after insertion of pipe etc. with cc(1:1.5:3)including finishing so as to make it leak proof as per direction of E.I.C. |
| 192 | Supplying all materials,labour,T&P and cutting grooves in pucca floors and walls for taking GI/PVC pipes and making good the damages as per direction of E.I.C.(a)Ground Floor |
| 193 | Supplying all materials,labour,T&P and cutting grooves in pucca floors and walls for taking GI/PVC pipes and making good the damages as per direction of E.I.C.(b1st. Floor |
| 194 | Supplying all materials,labour,T&P and fitting & brass/CP fittings of the following nominal bore with supply of all jointing materials etc.complete as per P.H. specification and direction of E.I.C.(a)15mm dia CP Bib cock(make-Jaquar) |
| 195 | Supplying all materials,labour,T&P and fitting & brass/CP fittings of the following nominal bore with supply of all jointing materials etc.complete as per P.H. specification and direction of E.I.C.(b)15mm dia CP Two way Bib cock(make-Jaquar) |
| 196 | Supplying all materials,labour,T&P and fitting & brass/CP fittings of the following nominal bore with supply of all jointing materials etc.complete as per P.H. specification and direction of E.I.C.(c)15mm dia CP(L.B)Bibcock(make-Jaquar) |
| 197 | Supplying all materials,labour,T&P and fitting & brass/CP fittings of the following nominal bore with supply of all jointing materials etc.complete as per P.H. specification and direction of E.I.C.(d)15mm dia CP Pillar cock long neck(make-Jaquar) |
| 198 | Supplying all materials,labour,T&P and fitting & brass/CP fittings of the following nominal bore with supply of all jointing materials etc.complete as per P.H. specification and direction of E.I.C.(e)15mm dia CP Angle Stopcock(make-Jaquar) |
| 199 | Supplying all materials,labour,T&P and fitting & brass/CP fittings of the following nominal bore with supply of all jointing materials etc.complete as per P.H. specification and direction of E.I.C.(f)15mm dia CP Concealed stopcock(make-Jaquar) |
| 200 | Supplying all materials,labour,T&P and fitting & brass/CP fittings of the following nominal bore with supply of all jointing materials etc.complete as per P.H. specification and direction of E.I.C.(g)15mm dia CP Revolving Shower with shower Arm(make-parry ware) |
| 201 | Supplying all materials,labour,T&P and fitting & brass/CP fittings of the following nominal bore with supply of all jointing materials etc.complete as per P.H. specification and direction of E.I.C.(h)15mm dia Health Faucet & 1.0m long Flexible pipe(make-Jaquar) |
| 202 | Supplying all materials,labour,T&P and fitting & brass/CP fittings of the following nominal bore with supply of all jointing materials etc.complete as per P.H. specification and direction of E.I.C.(i)25mm dia U-PVC F.W.V. |
| 203 | Supplying all materials,labour,T&P and fitting & brass/CP fittings of the following nominal bore with supply of all jointing materials etc.complete as per P.H. specification and direction of E.I.C.(j)15mm dia CP Extension Piece |
| 204 | Supplying all materials,labour,T&P and fitting & brass/CP fittings of the following nominal bore with supply of all jointing materials etc.complete as per P.H. specification and direction of E.I.C.(k)15mm dia CP Flange |
| 205 | Supplying all materials,labour,T&P and fitting and fixing of ISI mark 1HP single phase vertical water cool submersible pump set with discharge 1800/2200Lit /Hour & a head-55/70mtr.of reputed make(CRI/KSB/Texmoor equivelent Including cost conveyance and taxes etc. all completes as per P.H. Specification and direction of E.I.C. |
| 206 | Supplying all materials,labour,T&P and fitting & fixing of 1.0HP single phase vertical submersible pump set with commissioning and testing etc. all completes as per P.H. Specification and direction of E.I.C. |
| 207 | Supplying all materials,labour,T&P and fitting & fixing of ISI mark DOL starter of reputed make like BCH or equivalent for 1HP single phase vertical submersible pump set including all cost conveyance & taxes etc. all completes as per P.H. Specification and direction of E.I.C. |
| 208 | Supplying all materials labour T&P and fitting & fixing of 2.5mm2 3core copper flat suitable cable having ISI mark of reputed company like BCH/Finolex or equivalent & connecting the pump starter including cost conveyance & taxes etc. all completes as per P.H. Specification and direction of E.I.C. |
| 209 | Supplying all materials labour T& P and fitting&fixing plastic rope with MS well cover,MS Clamp,stainless steel short piece,Bend & socket,union including all cost conveyance & taxes etc. all completes as per PH. Specification direction of E.I.C. |
| 210 | Supplying all materials labour T&P and fitting&fixing of HDPE pipes & pipe fittings with making connection to pump set including all cost conveyance & taxes etc.all completes as per P.H. Specification direction of E.I.C.(a)32mm dia H.D.P.E. pipe |
| 211 | Supplying all materials Labour T&P and drilling perfectly vertical bore hole in boulder formation areas with drawn the hole hammer drilling rigs or combination drilling rigs to suit the site condition with deployment of rig necessary accessories and consumables for a specified depth below GL including supply of necessry casing shoe,odex tools & plants,jointing materials,extra sockets where required with drawing of pipes lowering the MS(ERW)pipes & fitting & fixing in perfectly vertical position including cutting & welding for jointing the pipes for simultaneous casing lowering in over burden boulder formation till encounter of hard rock and to drill 125mm DTH upto the desired depth as may be necessary, cleaning the site and washing bore etc. all complete providing sanitary sealing upto 5metres depth below GL as per the direction of E.I.C.(a)Drilling of 125mm. dia. Bore 0.00mtr to 29.40mtr |
| 212 | Supplying all materials Labour T&P and drilling perfectly vertical bore hole in boulder formation areas with drawn the hole hammer drilling rigs or combination drilling rigs to suit the site condition with deployment of rig necessary accessories and consumables for a specified depth below GL including supply of necessry casing shoe,odex tools & plants,jointing materials,extra sockets where required with drawing of pipes lowering the MS(ERW)pipes & fitting & fixing in perfectly vertical position including cutting & welding for jointing the pipes for simultaneous casing lowering in over burden boulder formation till encounter of hard rock and to drill 125mm DTH upto the desired depth as may be necessary, cleaning the site and washing bore etc. all complete providing sanitary sealing upto 5metres depth below GL as per the direction of E.I.C.(b)Drilling of 125mm dia.Bore 29.40mtr to 100.00mtr & above |
| 213 | Lowering the folloing size GI/PVC pipes with without slotted pipes as per the necessary from GL up to 30mtr depth and fitted and fixed up in perfectly vertical position including cutting and threading pipe and slotted pipe and supply and fixing all jointing materials tools and plants etc. complete and keeping the top plugging tube wells to prevent entry of foreign materials from above.Lowering of 125mm dia MS pipes: |
| 214 | Lowering the folloing size GI/PVC pipes with without slotted pipes as per the necessary from GL up to 30mtr depth and fitted and fixed up in perfectly vertical position including cutting and threading pipe and slotted pipe and supply and fixing all jointing materials tools and plants etc. complete and keeping the top plugging tube wells to prevent entry of foreign materials from above. (b)Cost of 125mm dia MS casing pipe |
| 215 | Cleaning and developing the tube well using their own compressor continuously worked till clear and adequate discharge is obtained from the tube well including supply and use of all necessary equipment and labour as per the direction of E.I.C. (a) Developing the tube well Please Enable Macros to View BoQ information |
| SR No | FileName | File Description |
| 1 | Click here to download tender document | Tender Documents |
| 2 | Click here to download tender document | Tender Documents |
| 3 | Click here to download tender document | Tender Documents |
| 4 | Click here to download tender document | Tender Documents |
Copyright © 2026 · All Rights Reserved. Terms of Usage | Privacy Policy
For Tender Information Services Visit : TenderDetail