| 1 | Laying and Jointing PVC Pipe. Heading |
| 2 | Earth work excavation of foundation in hard soil with intial lead of 1.5m and intial lift of 1.5m including rough dressing and leveling the bed etc. |
| 3 | Filling in foundation and plinth with sand well watered and rammed with cost conveyence and rayality etc and complete. |
| 4 | Cement Concrete ( 1 : 4 : 8 ) with 4 C.M size H.B.G matel including cost conveynce, rayality etc complite. |
| 5 | R.C.C. M-20 using with 20 mm & down grade size CBG chipes for R.C.C work with cost conveyence etc complete. |
| 6 | Cutting bending, binding and tying in proper position of M.S iron rod for R.C.C work including all cost conveyence of M.S rod. |
| 7 | Rigid for Smooth centering shuttering for R.C.C work with dismantling after casting of R.C.C work etc and complete. |
| 8 | a) R.C.C foundation & Plinth bend, |
| 9 | b) R.C.C Lintel |
| 10 | c) Beam and Column. |
| 11 | d) Roof & Chujja |
| 12 | Fly-Ash Brick work with C:M (1: 6) in supperstracture with cost and conveyence of all matarials etc & complete. |
| 13 | 2.5 C.M thick grading concrete C.C ( 1:2:2 ) using 6mm H.G chips (C.B) with cost, conveyence,roaylity etc . |
| 14 | 6mm thick cement plaster with C.M ( 1 : 4 ) to R.C.C surfaces finished smooth including closed deep chiping & slury treatment etc complite. |
| 15 | 16 mm thick C.P with C.M ( 1 : 6 ) over brick masonary with cost, conveyence etc complete. ( In side ) |
| 16 | 12 mm thick C.P with C.M ( 1 : 6 ) over brick masonary with cost, conveyence etc complete. ( Out side ) |
| 17 | Labour for fitting , fixing in proper position of M.S iron door and window |
| 18 | Cost of Door and Window. |
| 19 | Supplying, fitting and fixing virtified tile in floors of size 600mm x 600mm of approved make conforming to IS : 13755 laid on 20mm thick cement mortar ( 1:4 ) and filling joints with white cement etc |
| 20 | Fixing of tiles ( Coloured )on dado skirting and rises of steps on 12 mm thick C.P in C.M ( 1:3 ) jointed with neat of cement slurry mixed with pig ment to match the shade of tiles etc. |
| 21 | Supplying, Fitting & Fixing of openable UPVC Doors with Door frame of approved make with 6mm thick glass of approved quality complete with frame, shutters and all fitting and fixtures. |
| 22 | Supplying, Fitting & Fixing of two track UPVC sliding window of approved make with 6mm thick glass of approved quality complete with frame, shutters and all fitting and fixtures. |
| 23 | 20 mm thick C.P with C.M ( 1 : 6 ) over Stone masonary with cost,conveyence etc complete. |
| 24 | Finishing surface of walls with cement based wall putty ( Water based ) of approved make and finished smooth and even surface to receive painting including cost of scaffolding staging charge with cost of all materials taxes, labour etc complete. |
| 25 | Wall painting one coat with any approved primer. |
| 26 | Painting two coat's with Plastic emulsion paint any approved colour's etc and complete. |
| 27 | Painting two coat's over one coat of primering with any approved paintetc and complete. |
| 28 | Weather coat two coat over plastered surface including cost of all labour and matarials etc and complete. |
| 29 | Provision for sign board. |
| 30 | Contigency (1%) Please Enable Macros to View BoQ information |