| 1 | Laying and Jointing PVC Pipe. Heading |
| 2 | Earth work in Hard Soil withen 50m, intial lead and 1.50m, intial lift including rough dressing and breaking the clouds to maximum 5cm to 7cm laying the layers not exceeding 0.30m, in depth etc complete as per the direction of Engineer-in-Charge. |
| 3 | Providing and filling clean dry sand of approved quality from approved quarry in foundation and plinth in 6\\" thick layer well watered and rammed including the cost, conveyance, royalties and taxes of all material and labour etc. complete as per the direction of Engineer-in-Charge. |
| 4 | Cement Concrete (1:3:6) using 40 mm size HG metal of approved quality from approved quarry including hoisting, compacting curing, finishing the exposed surface smooth, dewatering, shorting, if nessery at the time of laying concrete with cost, coveyance, royalty & taxed of all material, cost of labour and T & P etc all complete as per the direction of the Engineer-in-Charge. |
| 5 | R.C.C. work of M-20 grade with 20 mm and down grade HGCB stone chipes including hosting and laying concrete in layers not exceeding 15cm thick, compacting by means of vibrator, curing, finishing the exposed surface smooth, dewatering, shorting, if nessery at the time of laying concrete with cost, coveyance, royalty & taxed of all material, cost of labour and T & P etc all complete as per the direction of the Engineer-in-Charge. |
| 6 | Supply, Cutting straighting coiled or bent up un coated HYSD bar reinforcement for RCC work including bending, binding & tying the grild and placeing in proper position with cost, conveyayance of binding wire 18 to 20 gauge and HYSD bar, cost of all material and labour and T & P etc complete as per the direction of Engineer-in-Charge. |
| 7 | Rigid smooth centering shuttring for R.C.C works including false work and dismantling then after casting with cost of all materials etc complete as per the direction of Engineer-in-Charge. |
| 8 | a) C.C foundation & Plinth bend, |
| 9 | b) R.C.C Lintel |
| 10 | c) Beam and Column. |
| 11 | d) Roof & Chajja |
| 12 | Flyash brick Masoary in CM (1:6) using brick of size 23cm x 11cm x 8cm of crusing streangth not less than 75 kg/cm² with dimentional tolerance plus minus 8% after immersing the bricks for six hours before use, including lowering, placing, watering and curing and cost, conveyance, royality and taxed of all materials, cost of labour, T&P etc complete as per the direction of Engineer-in-Charge. (for Superstructure work). |
| 13 | Supplying, fitting and fixing steel angle iron door and windows as per approved design and drawing including all cost of materials and labour etc complete as per the direction of Engineer-in-Charge. |
| 14 | 16 mm thick C.P with C.M ( 1 : 6 ) finished smooth to Brick Masonry surface after cleaning the surface including water curing and cost, conveyance, royality and taxed of all materials, cost of labour, T&P etc complete as per the direction of Engineer-in-Charge. |
| 15 | 12 mm thick C.P with C.M ( 1 : 6 ) finished smooth to Brick Masonry surface after cleaning the surface including water curing and cost, conveyance, royality and taxed of all materials, cost of labour, T&P etc complete as per the direction of Engineer-in-Charge. |
| 16 | 2.5 cm thick grading cement concrete ( 1:2:2 ) on roof slab with 4.7 mm size H.B.G chipes on new work including cost, conveyance & royalty with all lead & lift etc complete as per the direction of Engineer-in-Charge. |
| 17 | Supplying, fitting and fixing virtified tile in floors of size 600mm x 600mm of approved make conforming to IS : 13755 laid on 20mm thick cement mortar ( 1:4 ) and filling joints with white cement of approved quality including cost of all materials, labour T & P etc required for the work all complete as per the direction of Engineer-in-Charge. |
| 18 | Fixing of tiles on dado skirting and rises of steps on 12 mm thick C.P in C.M ( 1:3 ) jointed with neat of cement slurry mixed with pig ment to matchthe shade of tiles including rubbing and polisihing complete including the cost of all material, labour, T&P etc complete as per the direction of Engineer-in-Charge. |
| 19 | Finishing surface of walls with cement based wall putty ( Water based ) of approved make and finished smooth and even surface to receive painting including cost of scaffolding staging charge with cost of all materials taxes, labour etc complete as per the direction of Engineer-in-Charge. |
| 20 | Priming one coat with approved wall cement primer on plastred surface including the cost of all material, labour, T&P etc complete as per the direction of Engineer-in-Charge. |
| 21 | Wall painting two coats with approved Plastic Emusion paint over a coat of primer including the cost of all material, labour, T&P etc complete as per the direction of Engineer-in-Charge. |
| 22 | Wall painting two coats with approved paint to Doors and windows over a coat of primer including the cost of all material, labour, T&P etc complete as per the direction of Engineer-in-Charge. |
| 23 | Weather coat painting two coats with approved shade over a coat of oil bound primer including the cost of all material, labour, T&P etc complete as per the direction of Engineer-in-Charge. |
| 24 | Provision for sign board. |
| 25 | Contigency (1%) Please Enable Macros to View BoQ information |