| 1 | Name of Work : ESTIMATE FOR CONSTRUCTION OF WAITING SHED IN FRONT OF KANNANGUDI PHC BUILDING IN KANNANGUDI PANCHAYAT KANNANGUDI UNION |
| 2 | Earth work Excavation in all classes of soils such as hard stiff clay. Stiff block hard red earth, shales, murram, gravel, stoney earth expect hard rock requiring blassing and depositing on bank with all leads and lifts and all incidental charges such as storing shuddering and balling out water in necessary etc., completed for foundation as SS 20B. |
| 3 | Cement Concrete 1:4:8 mix using 40mm ISS HBG metal including cost & conveyance of all materials to site including cost of cement which will be supplied departmentally from section store at the cost three of which will be recovered for the contractors bills as per special condition including labour for mixing laying compacting curing concrete and all other incidental charges etc., complete for foundation. |
| 4 | Plain Cement Concrete 1:2:4 (one cement, two M.Sand and four hard broken stone jelly) using 20mm jelly for wearing coat including laying, compacting, finishing and curing, etc., complete |
| 5 | Brick Work in cement mortar 1:5 mix using country bricks of size (8 ¾ x 4 ¼ x 2 ¼) including cost & conveyance of all materials to site including cost of cement which will be supplied by departmental section store at Sivagnagai and the cost there of will be recovered from the contractors bill as per special conditions including labour charges incidental charges and curing etc., complete for super structure. |
| 6 | RCC 1:1.5:3 mix using 20mm ISS HBG metal including cost & conveyance of all materials to work site and including all other incidental charges etc., completed but executing cost and conveyance of steel fabrication charges and centering complete for lintel, plinth beam, sunshade & Roof slab. |
| 7 | Supply and fabrication of steel as per IS432/1960 (Tested Quality) including fabrication charges for all RCC items schedule in the tender including cost of steel which will be supplied by the department section store and the cost will be recovered from the contractors bill at the rate of specified in the special conditions appended including handling charges etc., completed. |
| 8 | Supplying and erecting of centering of RCC items including cost & conveyance of all materials to site and all labour charges etc., complete. |
| 9 | Plastering with cement mortar 1:5 12mm thick including cost & conveyance of all materials to work site including cement which will be supplied by the department from the departmental section store and the cost for the same will be recovered from the contractors bill at the rated and conditions specified in the special conditions from cement appended and all other charges etc., completed. |
| 10 | Paving the floor with best approved quality fine polished Granite Stone Slabs of size 1200 x 600 of 18 / 20mm thick of Synthetic Grey, Paradise and similar varieties with machine cut edges laid over a cement mortar bed of 20mm thick using cement mortar 1:3 |
| 11 | Dadooing walls with following best approved quality, white / colour glazed tiles of following sizes set in Cement Mortar 1:2 (One Cement and Two crushed stone M.Sand) 10mm thick and pointing the joints with white cement |
| 12 | Supplying and painting the walls with two coats of Exterier Emulsion painting including cost for Emulsion cleaning and scrapping the walls, rendering the walls smooth with necessary putty, brushes, scaffolding etc complete - 10sqm |
| 13 | Supplying and fixing in position of steel Truss using 60x60x5mm angle for common rafter,tie beam steel angle for vertical suppots including cost and all charges etc complete |
| 14 | Fabricating, Supplying and erection of iron vertical post made with 150 x 150 size square tube of 3.00m height and one number of 150 x 150 x 16mm size m.s plate is used on base plate and same is welded at bottom of the vertical post and one number of 150 x 150 x 16 mm size m.s plate is used as gueset plate is welded at top of the same post and necessary holes are provided at the base plate and gueset plate at an appropiriate places. the iron post is erected vertically in correct alignment position used with hydralic power crane and the post embeded on the R.C.C. Concrete bed and tightend with base plate in anchor rod using with heavy type nut. the rate including cost of materials, laboure charges such as cutting, welding, drilling, Power consumbtion charges etc complete., and the iron members are painted with one coat of anti corrosive at sincromat primer and with two coat of best enamal paint, and loading and unloading charges etc. complete. |
| 15 | Supplying and fixing in position of steel purlings using 40x40x5mm &25x25x5mm angle including cost and all charges etc complete |
| 16 | Supplying and fixing colour galvalume sheet roof of 0.47mm thickand steel tubular box section of 100x50x3mm of 1meter interval including priming coat fixing in position with all necessary accessories complete |
| 17 | Wiring with 2x2.5 sq.mm PVC sheathed SC alu.cable of 650 V Grade partly on TW fillets and partly in PVC rigid pipe concealed for vertical drops with TW and PVC accessories with T.W switch box to house control switch and regulator with 3mm thick Hylem sheet cover with painting on T.W fillets portion, and making good of the concealed portion with suitable colour for fan point. (S.D.No. 32) |
| 18 | Wiring with 2x 1.5sq.mm(22/0.3)PVC Insulated sc.cu. Conductor of 1100VPVC rigid pipe on wall7 celing for open PVC plug point |
| 19 | Supplyandfixingofsingleboxtype4'40Wfluorescentfittingcompletewithcopperchokeandcondensorwithconduitpipe suspension from the ceiling with PVC unsheathed FRLS copper leads from terminals to the fitting with tube |
| 20 | Supply and fixing of 1200 mm (48\\") AC ceiling fan complete with stepped electronic 300W regulator with 300mm down rod on the existing clamp. |
| 21 | GST Amount for providing Service to Government Contract Works for the above Construction Works. { GST Amount is the Total GST Amount for total overall quoted amount above this row in column \\"BB\\" for all works in this package} Please Enable Macros to View BoQ information |