| 1 | Laying and Jointing PVC Pipe. Heading |
| 2 | Part -AP.G Clamp made of Aluminium alloy with 3 Nos. suitable size galvanized G.I. nut, bolts & washer for Panther to Panther conductor. |
| 3 | P.G Clamp made of Aluminium alloy with 4 Nos. suitable size galvanized G.I. nut, bolts & washer for Moose to Moose conductor. |
| 4 | P.G Clamp made of Aluminium alloy with 4 Nos. suitable size galvanized G.I. nut, bolts & washer for Moose to Panther conductor. |
| 5 | Bimetalic terminal connector suitable for 33KV C. T to twin Moose conductor |
| 6 | Bimetalic terminal connector suitable for 33KV C. B to twin Moose conductor |
| 7 | Bimetalic terminal connector suitable for 33KV Isolater to twin Moose conductor |
| 8 | Bimetalic terminal connector suitable for 33KV LA to twin Moose conductor |
| 9 | Earthing 40 mm MS rod for main earthing |
| 10 | Earthing 40 mm MS Electrodes ( 3 meter longs) |
| 11 | Part -BShifting of main tank of 40 MVA 132/33 KV Transformer from safe open space to Loading point approximate 20 mtrs. distance including turning of tank, if required all T&P and all other associated works required to complete the job satisfactory as per technical specification. |
| 12 | Safe Loading of 40MVA Transformer with all accessories and Oil from 132KV S/S Aligarh-V on Hydrolic Multi Axel trailor/truck with proper tightening of tank on trailor bed with help of wire rope and heavy turn buckle for safe transportation at 132KV S/S Chitbaragon. The work include all other associated works required to complete the job satisfactory as per technical specification. |
| 13 | Safe carriage of 40MVA 132/33KV Transformer with all accessories and Oil by Hydrolic Multi Axel trailor/truck from 132KV S/S Aligarh-V to 132KV S/S Chitbaragaon approx distance 800 Km. |
| 14 | Transit insurance during period of repair and 45 days after return of transformer against all risk. |
| 15 | Safe Unloading of 40MVA Transformer tank including all accessories and Oil from Hydrolic Multi Axel trailor/truck and their proper stacking at the designated place at 132KV S/S Chitbaragon. The work include all other associated works required to complete the job satisfactory as per technical specification. |
| 16 | Complete dismantling the accessories of 20MVA, 132/33 KV Transformer after opening of jumpers, removal of earthing and opening of cables & cable connection, draining out the transformer oil up to required level in 209 liters capacity oil drums / tanker, removal of all radiators, conservator tank, oil pipe lines all bushings, turrets, fan motors, marshalling box, RTCC panel etc. with proper gasket along with nuts and bolts to complete the jobs satisfactorily including proper stacking. All other T&P, Crane etc. shall be arranged by the contractor at his own cost. |
| 17 | Shifting upto 20 M of main tank of dismantled 20 MVA ,132/33 KV transformer from trasformer plinth to suitable place including turning of tank , if required. All T&P and all other associated works for completion of job satisfactory. |
| 18 | Additional shifting of 125 meter of dismantled 20 MVA 132/33 KV Transfomer @5 meter per job. |
| 19 | Dismantling of 120KV and 30KV LA by opening of Jumper,cutting of old earthing includig all other associated work to complete the job Satisfactory. |
| 20 | Shifting of 40 MVA T/F Main tank from unloading site to T/F Plinth at 132 KV S/S Chitbadagaon Approx. distance-20 Mtr. |
| 21 | (a) Additional shifting of 40 MVA 132/33 KV Transfomer @5 meter per job. |
| 22 | Complete, erection of 40 MVA T/F by erection of radiator, conservator tank, bushing with its turrets (if available) connecting of all oil pipe line, erection of cooling fans, making control cables connection, buchholz relay etc. for completing the work, topping of T/F oil and final oil filling in tnak, radiator, conservator tank and all other associates work for completion of work |
| 23 | Replacement of all Gasket including the top Cover of T/F by Providing and Fixing of new gasket as per Existing Size made of rubberized Cork Sheet Kotika/Turboze/Cork brand grade. |
| 24 | Centrifuging of complete transformer oil for at least 72 hours by 10-12 KL/Hrs capacity centrifuging machine with fresh fiilters untill required standard of oil parameters achieved. Centrifuging machine with fresh oil filters shall be arranged by the contractoralong with operator and taking the BDV and PPM value of the oil Periodically till the required value is achieved. |
| 25 | The DGA, BDV and PPM of the centrifuged oil must be tested from NABL accredited LAB and the report must be submitted. |
| 26 | Earthing of main tank of 40 MVA T/F by using M.S, flat 50x6/ 75x10 mm size, its jointing with already laid earth mat/Deltas. The work including painting,cutting, bending etc. MS Flat shall be provided by the contractor. |
| 27 | Erection of RTCC panel of 40 MVA T/F RTCC panel in control room at 132 KV S/S Chitbadagaon including cable termination & fitting and laying of control cable if required as per site requirement and its connections. |
| 28 | Erection of 120KV and 30KV LA as per instruction manual of various equipments and technical specification including shifting of material from store to work site includig all other associated work to complete the job Satisfactory. |
| 29 | Jumpering of 40 MVA Transformer from HV with Moose/Zebra/Panther an LV side with Double Moose complete up to 33 KV Main Bus. |
| 30 | Electrical safety Proposal and fees submission and providing NOC from Electrical Safety. |
| 31 | Laying and termination of following size control cable in trench/cable trays from Control room C&R panel to switchyard equepments (132/33KV CT, their junction boxe , Transformer marshalling boxes & RTCC panel) in 132KV Switchyard as per cable schedule including carriage of cable drums from store and other associated work2C x 2.5 sq. mm |
| 32 | 4C x 2.5 sq. mm |
| 33 | 6C x 2.5 sq. mm |
| 34 | 10Cx2.5 sq. mm |
| 35 | Termination of control cables (per termination) Please Enable Macros to View BoQ information |