| 1 | Schedule A Part-I (BUILDING WORK ) Note: this Schedule is not pre priced by MES and the pre priced rate indicated as Rs 0.00 under Col 5 signifies this fact only. |
| 2 | M & L for Design & Construction of MTR&S Hanger with annexes bldg as arch drawings with foundation, Design criteria, soil investigation report all included including supply, fabrication and erection for Pre -engineered Building (PEB) part as per following specification and confirming to IS Codes and NBC provision and inclusions.(a) Foundation including pedestal of hanger and annexe bldg in RCC M-30 concrete and Fe-500 bars.(b) Hanger as PEB bldg in structural steel.(c) Annexe of the bldg in RCC framed structure with M30 Concrete and Fe -500 reinfrcement bars and PCC Block Masonry.(d) Other specifcations as specified in dwgs including dwg for schedule of finishes and as in design criteria.(e) Design and construction of internal electric supply including ligth fitting, sub main wiring, point wiring, DBs as per purpose and specification. |
| 3 | M & L for construction of Heating Plant and DG Set Building in RCC framed construction (S/S) complete as shown in dwgs and as specified. |
| 4 | M & L for construction of Fire points with permanenet specifications complete all as specified and shown on drawings. |
| 5 | Total amount of Schedule 'A' PART-I (BUILDING WORK) |
| 6 | Total amount of Sch 'A' PART-II ( Internal Supply Works ) |
| 7 | Total amount of Sch 'A' PART-III ( Plumbing Works ) |
| 8 | Total amount of Sch 'A' PART-IV (Section-I) (INTERNAL ELECTRIFICATION WORKS) |
| 9 | SCHEDULE `A' PART-IV (Section-II) (INTERNAL ELECTRIFICATION WORKS) Note : This schedule is not pre priced by MES and the pre priced rate indicated as \\"Rs. 0.00\\" under Col.5 signifies this fact only. |
| 10 | Supply and fixing bus bar chambers of size 600 x 450 mm iron clad with 4 Nos 200 Amps rated copper busbar mounted on porcelain insulator complete fixed flush in wall and making good the disturbed surface all as required at site complete all as specified & directed. |
| 11 | Total amount of Sch 'A' PART-IV (SEC-II) (INTERNAL ELECTRIFICATION WORKS) |
| 12 | Total amount of Sch 'A' PART-V (RAMP, HARDSTANDING, ROAD/ PATH) |
| 13 | Total amount of Sch 'A' PART-VI (LIGHTENING PROTECTION WORKS) |
| 14 | Total amount of Sch 'A' PART-VII (Section-I) (SEWAGE DISPOSAL WORKS) |
| 15 | SCHEDULE `A' PART-VII (SEC-II) (SEWAGE DISPOSAL WORKS) Note : This schedule is not pre priced by MES and the pre priced rate indicated as \\"Rs. 0.00\\" under Col.5 signifies this fact only. |
| 16 | S & F on site LLDPE septic tank conventional type of type 30 user designed to carry sewage and sullage water including excavation in any type of soil,PCC 1:4:8 below foundation, vent shaft connection etc complete all as specified & directed. |
| 17 | M & L for soakage wells excavation, in any type of soil, foundation in PCC 1:3:6, walls of honey combed masonry with top ring of M25 concrete including intercepting chamber and screen chamber made of Brick masonary in CM, RCC cover slab in M25/ SFRC cover, interconnecting pipes of RCC/DWC complete filled with brick bats of size 3.0 m dia *3.0 m depth. |
| 18 | Total amount of SCHEDULE `A' PART-VII (SEC-II) (SEWAGE DISPOSAL WORKS) |
| 19 | Total amount of Sch 'A' PART-VIII (Section-I) (EXTERNAL WATER SUPPLY) |
| 20 | SCHEDULE `A' PART-VIII (SEC-II) (EXTERNAL WATER SUPPLY) Note : This schedule is not pre priced by MES and the pre priced rate indicated as \\"Rs. 0.00\\" under Col.5 signifies this fact only. |
| 21 | M & L for construction of brick masonary valve pit of size 60x60x90cm (Internal dimension) built in cement mortar 1:4 including all excavation and earth work in any type of soil to a distance n.exc 50 Mtr all as directed by Engr-in-Charge including 15mm thick plastering internally in CM 1:4 and flush pointing in same mortar, to brick work exernally as work proceeds and cement concrete in foundation PCC (1:4:8) type D-2 and PCC 1:3:6 type C-1 coping, MS sheet cover 3.15 mm thick MS angle iron frame, handle, locking arrangement and painting to steel surfaces complete all as specified and shown in drawings. |
| 22 | Supply and fixing of stainless steel (Fire retardant, closed cell, chemically cross linked insulation meterial with thermal and acoustic insulation) water tank, Volume-1000 Ltrs, 1950mm HT with stand, 1050mm dia approx and Lid dia 420mm with 38mm discharge, 38mm overfow, 25mm inlet and 50mm outlet with 20mm Airvent including complete fitting, installation and testing as per specified and directed. |
| 23 | Total amount of SCHEDULE `A' PART-VIII (SEC-II)(EXTERNAL WATER SUPPLY) |
| 24 | Total amount of Sch 'A' PART-IX (Section-I) (CENTRAL HEATING SYSTEM) |
| 25 | SCHEDULE `A' PART-IX (SEC-II) (CENTRAL HEATING SYSTEM) Note : This schedule is not pre priced by MES and the pre priced rate indicated as \\"Rs. 0.00\\" under Col.5 signifies this fact only. |
| 26 | S & F Design, supply, Installation ,commissioning and testing of complete heating plant including boiler uniit, chimney, oil storage tanks, glycol expansion tank, glycol makeup tank, gear pumps and glycol circulating pumps complete with alll accessories as per the ffollowing.(A) Thermic Fluid Heaters 02 Nos. (1 W + 1 S) : Supply, installation, commissioning and testing of pressurised type 3 phase reverse flame horizontal / vertical smoke tube, Thermic fluid heaters (two Nos) 1 No of working and 01 No stand by arrangement ,each of capacities 1,50,000 K Cal/Hr complete in all respect, with standard accessories to meet the required condition of Leh station with temp and humidity criteria for hangar complete in all respect in the conditioned space as defined in the reference list of drawings and satisfying conditions as mentioned in the enclosed user data sheet as per Appx with combustion chamber and equipment , automatic monoblock burner assy, fire tubes, control panel with sequence controller , photocell for frame failure , HT transfer combustion chamber and equipment automatic monoblock burner assy, fire tubes, control panel with sequence controller, photo cell for flame failure, HT transfer electrode blower assy, electrical panel, mounting frames, pressure gauge at inllet and outllet suitable operation on 50HZ three/single phase AC supply compete in all resppect to maiintaiin the inside temperature 23+/-2 degree celcius when the outside temperature drops to (-25) degee celcius i.e Leh winter climatic conditions including following items of work. |
| 27 | Make : Therrmax/Ecoflame/Westerrn/Rapid Therrm/Alphatherm The boiler minimum specifications should be as under :- (a) Heater unit:-Heat exchanger ,consisting of closely wound, helical concentric coils double jacketed arranged to give adequate no. of passes on flue gas side & made out of ERW tubes confirming to BS 3059 Pt-I suitable for high temperature all as per manufacturer design and of required head and capacity . (b) Pressure jet burner:-Suitable for light oil firing with stepless modulation mechanism all as per manufacturer design and of required head and capacity. (c) Combustion air fan with drive motor assembly all as per manufacturer design and of required head and capacity.(d) Control Panel : Dust protected pre-wired unit mounted air cooled control panel housing a burner management system , switchgear consisting of contractors, overload relays, fuses and MCB etc.all as per manufacturer design and of required capacity. (e) The boiler shall be installed in system of (1W+1S). (f) The tenderer should get the plant installed by any of the original equipment manufacturer with recommended makes of compatible components of items. (g)The cap of boiler has been designed for maintaining the inside temp of 23+/-2 degree celcius for an ambient drop to -25 degre celcius.(h)The boiler inner shell be made from carbon steel with dished ends (curved type) with thickness as per boiler design of OEM. |
| 28 | (j) Outer shell be made from carbon steel with thickness as per boiler design of OEM. (k) Boiler tube shall be seamless MS tube for quality commensurate with the boiler requirement . (l) The front door shall be openable lined with high grade insulation and refactory (m)High efficient, low noise imported monoblock burner (Benton/Rello) (n)The boiler shall be insulated with 50mm thick resin bonded fibre glass wool and cladded with 22 guage GI sheet (epoxy pointed) or any other thermal insulation as per OEM design. (o)Pre wired control panel (made from 18 guage CRC sheet ) Main incomer, MCB in/out temperature controller (digital)fault indicating light for water high temp, burner trip,flue temp, with alarm, hour meter for maint schedule etc. (p) 1 set of oil piping from unit to burner . (q) It includes suitable concrete foundation for Boiler . ( B) FLUE GAS CHIIMNEY Supply, installation of mild steel flue gas chimney to accomodate emission of Boiler cap 1.5 LKAH Kcal/Hr each made out of 3 mm thick mild steel sheet, minimum 3 mtr aboove the highest point of plant room as per manufacturer recommendations which ever is higher including connecttion to each boiler - 01 NoNote : - (a) The item shall be complete with the mounting/fixing arrangement all as speciffied by the boiler manufacturer including the dia of the exhaust flue Gas chimney as per the design and specificaton of the boiler installed.(b) The hot water generator shall be connected to the chimney. |
| 29 | (c) The portion of chimney inside the building shall be insulated with fiber glass insulation wool of density 24 Kg/Cum.The item shall be complete with mounting and fixing arrangement with necessary PCC work complete all as specified and directed. (C) Day Oil Storage Tank Supply , Installation,testing and commissioning of HSD oil day storage tank rectangular mild steel (IS2062) constrruction with capacity of 1000 Ltrs complete with inlet, outlet, over flow drain and vent with flame arrestor. tank shall be made out of 4mm thick mild steel sheet and will be provided with supports made out of 50mm dia medium grade pipe to keep tank base at minimum 2500mm above finished floor level. The tank shalll be provided witth level switches for on - off operaton of transfer pump. Extra high level and extra low level alarm shall be provided along with gauge indicator duly callibrated. Tank and strructure shall be painted with synthetic enamel paint of appproved colour over one cooat of primer complete all as specified and directedd by Engr in Charge Qty-02 Nos Please Enable Macros to View BoQ information |
| 30 | (c) The portion of chimney inside the building shall be insulated with fiber glass insulation wool of density 24 Kg/Cum.The item shall be complete with mounting and fixing arrangement with necessary PCC work complete all as specified and directed. (C) Day Oil Storage Tank Supply , Installation,testing and commissioning of HSD oil day storage tank rectangular mild steel (IS2062) constrruction with capacity of 1000 Ltrs complete with inlet, outlet, over flow drain and vent with flame arrestor. tank shall be made out of 4mm thick mild steel sheet and will be provided with supports made out of 50mm dia medium grade pipe to keep tank base at minimum 2500mm above finished floor level. The tank shalll be provided witth level switches for on - off operaton of transfer pump. Extra high level and extra low level alarm shall be provided along with gauge indicator duly callibrated. Tank and strructure shall be painted with synthetic enamel paint of appproved colour over one cooat of primer complete all as specified and directedd by Engr in Charge Qty-02 Nos Please Enable Macros to View BoQ information |