|
| 1 | Dismantling and removing 2.5cm th grading concrete including stacking the useful materials for reuse and ramming the debris with in 50m lead etc with all labour, T&P and cess etc. complete in all respect as per specification and direction of the Engineer-in-charge. |
| 2 | Removing old lime or cement plaster from walls including racking out joints 12mm deep and removing debris etc. with all labour, T&P and cess etc. complete in all respect as per specification and direction of the Engineer-in-charge. |
| 3 | Providing 6mm thick cement plaster (1:4) to R.C.C. surfaces finished smooth including closed deep chipping and slurry treatment including all cost of the materials,carriage ,royality, all taxes and all labour involved for completion of item of work as per the direction of Engineer -in charge. |
| 4 | Providing 12mm thick cement plaster (1:6) over the brick masonry walls including all cost of the materials, carriage, royality,alltaxes and all labour involved for completion of item of work as per the direction of Engineer-in-charge. |
| 5 | Providing 16mm thick cement plaster (1:6) over the brick masonry walls including all cost of the materials,carriage ,royality, all taxes and all labour involved for completion of item of work as per the direction of Engineer -in charge. |
| 6 | Supply fitting and fixing vetrified floor tiles in floor 600mmx600mm printed/coloured series trade on steps and landing on 25mm thick bed of cement motar (1:1) joint with net cement slury mixed with pigment to watched and shade of the tile including rubbing and policying etc as per directin of the Engineer in charge . |
| 7 | Fixing tiles in dados skirting and risers of steps on 12mm thick cement plaster (1:3) jointed with neat cement slurry mixed with pigments to match the shade of the tiles including rubbing and polishing complete including cost of precast tiles. |
| 8 | Supplying fitting, fixing Chequers tile in floors trades on steps & landing on 25 mm thick cement mortar (1:1)jointed with neat cement slury mixed with pigment to match the shades of the tiles including rubbing and polishing completeincluding cost of material, labour, T&P etc., complete. |
| 9 | Wall priming one coat with approved primer with brush to wall surface including all cost, conveyance, taxes of all the materials , all labour and T&P required for the work etc. complete including 1% cess as per direction of the Engineer-in-charge. |
| 10 | Distempering two coats to wall with approved distemper of approved shade ncluding cost, conveyance and taxes of all the materials, labour etc complete including 1% cess as per specification and direction of the Engineer-in-charge. |
| 11 | Weather coat two coats including cost, conveyance, taxes of all materials all labour and T & P required for the work etc complete including 1% cess as per direction of the Engineer in charge. |
| 12 | Painting two coats over a coat of primer onOLD wood/iron work of doors and windows including all labour, T & P, cost of paints as per the direction of Engineer-in-charge. |
| 13 | Supplying, fitting & fixing of M.S grill with window with frame including cost, conveyance of all materials & etc complete |
| 14 | Supplying, fitting & fixing of M.S grill with M.S Plate door with frame including cost, conveyance of all materials & etc complete |
| 15 | Earth work in excavation of foundation in hard soil within the initial lead and lift including dressing and levelling the bed and depositing the excavated materials away from the work site etc. all complete as directed by the Engineer-in-charge |
| 16 | Filling foundation and plinth with sand well watered and rammed including all cost, carriage, royality, taxes and all labour, T & P etc. all complete as per the direction of Engineer-in- charge. |
| 17 | Cement concrete (1:3:6) using 40mm and down gradedhard granite crusher broken metal including all cost , carriage, royality, taxes, and all labour involved for completion of item of work as per the direction of Engineer- in - charge. |
| 18 | Cement concrete (1:2:4) using 12 mm and down gradedhard granite crusher broken metal including all cost , carriage, royality, taxes, and all labour involved for completion of item of work as per the direction of Engineer- in - charge. Please Enable Macros to View BoQ information |