| 1 | Design, Supply, Installation, Testing & Commissioning of CCOE/PESO Approved UL Listed Seamless Novec 1230 /FK-5-1-12 or Equivalent cylinder and Valve Assembly etc, 120 Ltrs. capacity, OEM Factory filled with Novec 1230 Suppression Liquid pressurised to 42 bar.The quoted price shall include cost of Dismantling of Existing Cylinders with outlet dis connection,Electrical disconnection with installation of new Cylinder with outlet connection,Electrical connection, lifting,shifting, loading, unloading, Lateral shifting and moving the new Cylinders locating the same on Location. Houskeeping and Disposing all type of generated debris and scrap out of TMH is deemed to be included in this item cost. |
| 2 | Design, Supply, Installation, Testing & Commissioning of CCOE/PESO Approved UL Listed Seamless Novec 1230 /FK-5-1-12 or Equivalent Cylinder and Valve Assembly etc, 80 Ltrs. capacity, OEM Factory filled withNovec 1230 /FK-5-1-12 or Equivalent Suppression Liquid pressurised to 42 bar. |
| 3 | Design, Supply, Installation, Testing & Commissioning of CCOE/PESO Approved UL Listed Seamless Novec 1230 /FK-5-1-12 or Equivalent Cylinder and Valve Assembly etc, 34 Ltrs. capacity, OEM Factory filled withNovec 1230 /FK-5-1-12 or Equivalent Suppression Liquid pressurised to 42 bar. |
| 4 | Design, Supply, Installation, Testing & Commissioning of Novec 1230 /FK-5-1-12 or Equivalent with Zero Ozone depleton potential and very low Global Warming Potential of 1 with 20 years Blue Sky Warranty against any regulatory bans and Restictions. Fire Protection Fluid, OEM Factory Filled per Kgs. |
| 5 | Supply, Installation, Testing & Commissioning of UL Listed SS Braided Flexible Discharge hose with Manifold Check Valve for Single/Multi Cyilnders System including all type of fittings complete in all respect as per instruction of EIC |
| 6 | Supply, Installation, Testing & Commissioning of UL Listed SS Braided Flexible interconnecting actuation hose for Multi Cyilnders System including all type of fittings complete in all respect as per instruction of EIC( |
| 7 | Supply, Installation, Testing & Commissioning of UL Listed Electromegnetic Actuator cum Manual Actuator including all type of fittings,Easily operated with DC Power Source complete in all respect as per instruction of EIC |
| 8 | Supply, Installation, Testing & Commissioning of UL Listed Pneumatic cum Manual Actuator for slave cylinder including all type of fittings complete in all respect as per instruction of EIC |
| 9 | Supply, Installation, Testing & Commissioning of UL Listed Pressure Monitoring Guage including all type of fittings complete in all respect as per instruction of EIC |
| 10 | Supply, Installation, Testing & Commissioning of UL Listed Nozzles, 360 Deg / 180 Deg Throw, selection as per approved hydraulic flow calculations.. |
| 11 | Supply, Installation, Testing & Commissioning of Warning Sign Board with Marking \\"GAS DISCHARGE. DO NOT ENTER\\" and \\"GAS DISCHARGE. EVACUATE IMMEDIATELY\\" Shall Operate on 24V DC, Driven Through Gas Release Panel. (for use outside room)(Make-CRYPTZO/Equivalent). |
| 12 | Design, Supply, Installation, Testing & Commissioning of Single zone Gas Release Panel facility to connect Manual Abort/Release switches including SITC of UL Listed Manual Abort Stations with DPDT Relay & UL Listed Manual Release Stations with DPDT Relay The Abort & Release will be monitored simultaneously by Fire Alarm and BMS System. Complete with required mounting accessories. The Panel shall provide Potential free contacts for Trouble / Fault Status. The Panel shall be Complete with Red Colour Housing, Monitored Power supply units for Notification devices & warning signages of the system, including Battery charger & batteries. This shall include conventional detectors along with the panel to fulfill the system requirements.The quoted price shall include cost of Dismantling of Existing Panel with incoming/outgoing dis connection,Electrical disconnection including cabling etc with installation of new Gas Release Panel with incoming/outgoing connection,Electrical connection, lifting,shifting, loading, unloading, Lateral shifting and moving the new Gas Release Panel locating the same on Proper location. Houskeeping and Disposing all type of generated debris and scrap out of TMH is deemed to be included in this item cost(1 SET=Gas Release panel-1No,Abort Switch-1No,Release Switch-1 No,Hooter Cum Flasher-1 No & Smoke/Heat Detectors-2 No). |
| 13 | Supply, Installation, Testing & Commissioning of 2 Core x 1.5 mm2, Multistranded Annealed Tinned Copper, Shielded FRLS, Armoured cable, RED in Colour. The cable shall be laid on surface with hot dip GI Saddels and spacers every 0.3 meters. Complete with GI Junction Box, lugs, cable compression glands, cable tags and Ferruling. |
| 14 | Supply installation Testing & commissioning of Tank Bracket Assembly complete with C- Channel Stand and Supports for above Cylinder. The Price Shall include MS Fabricated Floor Supported Cylinder Support Stand, wherever Required. Complete with 1 coat of Primer and 2 coat of approved low VOC Paint RED in colour complete in all respect as per instruction of EIC. |
| 15 | Supply installation Testing & commissioning of UL Listed C PVC Pipes & Fittings etc |
| 16 | Dismantling ,HPT Test of Existing Cylinder,Refilling,Reassembling ,Testing & Commisioning of Existing Gas supression System |
| 17 | Hydo test for Existing Gas Supression Pipeline Please Enable Macros to View BoQ information |