| 1 | Complete Dismantling of the existing sub station structure including Transformer,GI Channel iron, LA ,Horn gap fuse unit,GO AB Switch,LT DB Box,LT Cable and refixing of the same on the new two pole sub station structure.The job includes transporation of spared HT poles back to Divisional Stores |
| 2 | Supply, installation, testing and commisioning of 9 mtr (410 SP-33) long Steel Tubular Poles complete with base plate(350x350x5mm), top cap, Earthing Channel(75x40x6mm) including digging of pit positioning etc, complete in all respect as per Standards. |
| 3 | Supply, installation, testing and commisioning of 8 mtr(410 SP-15) long Steel Tubular Poles complete with base plate(350x350x5mm), top cap, Earthing Channel(75x40x6mm) positioning etc, complete in all respect as per Standards. |
| 4 | Supply, laying, stringing, tensioning, binding of 50 Sqmm ACSR Conductor complete in all respects as per standards. |
| 5 | Supply,Carraige upto site and fixing of GI V cross-arm with top Bracket including clamp duly fabricated as per site requirement including clamps(50x8 mm), GI Nuts & Bolts,washers etc complete in all respects as per standards. |
| 6 | Supply,Carraige upto site,Installation,testing and Commissioning of 11kV Polymeric composite Pin Insulators 12kV, 5kN, Lighting Impulse 75kV Positive and 80kV Negative, creepage distance 320mm complete in all respects as per standards. |
| 7 | Supply,Carraige upto site,Installation,testing and Commissioning of 11kV Polymeric composite Disc Insulator 12kV,min failing load 45kN, Lighting Impulse 75kV Positive and 80kV Negative, creepage distance 320mm complete in all respects as per standards. |
| 8 | Supply, Carraige upto site, laying, stringing, tensioning, binding of 185mm² (1Ckt )1.1kV Grade, XLPE Insulated Stranded Conductor FRLS type cable complete in all respects as per standards. |
| 9 | Supply,Carraige upto site, fixing of Aluminium Thimbles of size 185 Sqmm. |
| 10 | Supply,Carraige upto site, fixing and Commissioning of Aluminium Solderless Clamps of size 185 Sqmm. |
| 11 | Earthing of substation-Excavation of earth pit of dia 650 mm & depth 3000 mm, installation of Earthing pipe of 40 mm Nominal bore & 4mm wall thickness & length 2.5 mtr long as Per IS 1239. GI Strip for neutral earthing of size 25 mmx3 mm, for connection of transformer body,G.O set & lightening arrestor as per IS 2629/85, GI nuts & bolts,refilled with earth enhancement materials and earth Chamber made of brick masonary with RCC slab cover complete in all respects as per standards. |
| 12 | Supply,Carraige upto site, fixing of G I Muky Clamps. As per standards |
| 13 | Supply,Carraige upto site, fixing of 45 KN Shackale insulators as per standards. |
| 14 | Cement bottoming 1:2:4 mix as per Standards 0.5cum/0.45 cum pole comlete in all respects. |
| 15 | Earthing of steel tubular poles complete by GI pipe 40mm or GI rod 20mm 3.0 mtr long through GI strip 25x3 as per standards. |
| 16 | Painting of Poles with one coat of Red Oxide and two coats of alimunium paint to give uniform shine. |
| 17 | Supply and fixing of GI barbed wire Anti climbind Device with clamps complete in all respects as per Standards |
| 18 | Supply and fixing of danger plates with clamps complete in all respects as per Standards |
| 19 | Providing of wooden ladder 18 Ft long of Budloo make . |
| 20 | Providing of safety helmet of standard make with ISI mark. Please Enable Macros to View BoQ information |